Bid Publish Date
07-Oct-2026, 7:28 pm
Bid End Date
17-Oct-2026, 8:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, seeks procurement and on-site deployment of multiple consumer-electronics and building-furnishings items at West Siang, Arunachal Pradesh 791001. Scope covers 500W dehumidifier, 3D wall panel wallpaper, wall mount fan, PVC roll, and change over for generator set, including installation, testing, commissioning, and operator training. The quote should include all costs for supply and on-site services, with delivery terms aligned to the original delivery period and potential 25% quantity variation. A robust delivery plan to the Along Mil Stn is required, with OEM/authorized-reseller readiness for on-site configuration. Turnover evidence and GST considerations are demanded to validate bidder capability. The tender emphasizes OEM-owned installation competency and adherence to specified terms for timely execution.
Product: 500W dehumidifier
Product: 3D wall panel wallpaper
Product: Wall mount fan
Product: PVC roll
Product: Change over for generator set
Scope: Supply, Installation, Testing, Commissioning, Operator Training
Delivery: Along Mil Stn, West Siang, Arunachal Pradesh 791001
OEM/Certified resource: required for installation
Option clause allows ±25% quantity variation at contract placement and during currency
Delivery terms tied to last delivery order date with calculated extension
GST to be checked by bidder; reimbursement as per actuals or applicable rates
GST treatment to be actual or applicable rates; no explicit payment schedule provided; ensure compliance with GST and on-time invoicing.
Delivery commencement from last date of original delivery order; additional time formula with minimum 30 days.
Not specified in data; implied adherence to delivery timelines and performance obligations per contract.
OEM or OEM-certified resource capable of on-site installation
Turnover evidence for last three financial years
No liquidation or court receivership; undertaking to be uploaded
Quantity
58
Category
500W Dehumidifier
Bid Type
Single Packet Bid
Bid Validity
15 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
8
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
500W Dehumidifier , 3D Wall Panel Wallpaper , Wall Mount Fan , PVC Roll , Change Over for Generator Set
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
West Siang
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | West Siang | West Siang | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
500W Dehumidifier
500W Dehumidifier
3D Wall Panel Wallpaper
3D Wall Panel Wallpaper
Wall Mount Fan
Wall Mount Fan
PVC Roll
PVC Roll
Change Over for Generator Set
Change Over for Generator Set
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 500W Dehumidifier | 500W Dehumidifier | 2 | pieces | mithilesh282jqm@2018 | 10 | |
| 2 | 3D Wall Panel Wallpaper | 3D Wall Panel Wallpaper | 21 | pieces | mithilesh282jqm@2018 | 10 | |
| 3 | Wall Mount Fan | Wall Mount Fan | 30 | pieces | mithilesh282jqm@2018 | 10 | |
| 4 | PVC Roll | PVC Roll | 4 | roll | mithilesh282jqm@2018 | 10 | |
| 5 | Change Over for Generator Set | Change Over for Generator Set | 1 | pieces | mithilesh282jqm@2018 | 10 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization or OEM-certified reseller authorization, if applicable
Proof of on-site installation capability by OEM resources
Bidder undertaking on financial standing (no liquidation, no court receivership)
Key insights about ARUNACHAL PRADESH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with turnover proofs for the last 3 years. Ensure OEM authorization or OEM-certified reseller status and readiness to perform on-site installation. Comply with option clause up to 25% quantity and provide detailed delivery plan to Along Mil Stn.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT mandate, audited turnover certificates or CA certificates for the last 3 years, OEM authorization, and proof of on-site installation capability. Include installation, testing, commissioning, and operator training plans.
Categories include 500W dehumidifier, 3D wall panel wallpaper, wall mount fan, PVC roll, and change over for generator set. The scope covers supply, installation, testing, commissioning, and operator training, with on-site deployment at Along Mil Stn, West Siang.
If quantity increases up to 25%, the delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The purchaser may extend up to the original delivery period during option exercise.
Bidders must verify GST applicability themselves; GST reimbursement will be as per actuals or the prevailing applicable rate, limited to the quoted GST percentage. Ensure correct GSTIN and compliant invoicing for reimbursement.
Installation, commissioning, testing, and operator training must be performed by OEM or OEM-certified resources or OEM-authorized resellers, ensuring on-site readiness at Along Mil Stn, West Siang, with necessary certifications if required.
Submit turnover evidence for the last three financial years via audited balance sheets or CA/Cost Accountant certificate. If the OEM is under three years old, provide the appropriate turnover calculation per tender documentation.
Scope includes supply, installation, testing, commissioning, and training of operators, along with providing any statutory clearances needed for the five listed items: dehumidifier, wall panels, wall fan, PVC roll, and generator change over.