TenderDekho Logo
Active GEM

Indian Army 2 Ton Split AC & Related Equipment Tender Bharatpur/India - IS 550 compliant components 2026

Bid Publish Date

10-Oct-2026, 5:17 pm

Bid End Date

20-Oct-2026, 6:00 pm

Value

₹4,00,000

Progress

Issue10-Oct-2026, 5:17 pm
AwardPending

Key Highlights

  • • CRITICAL: 25% quantity variation allowed at contract placement and during currency
  • • SPECIFIC: SITC scope including installation, testing, commissioning of 5-item package
  • • STANDARD/COMPLIANCE: Verify compatibility with 2 Ton capacity and 5 KVA stabilizer for AC load
  • • ELIGIBILITY: Review ATC for required OEM authorizations and installation capabilities

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a complete air conditioning package: 2 Ton Split Air Conditioner, Voltage Stabilizer 5 KVA for 2 Ton AC, Outdoor Unit Stand, Copper Pipe, and Installation Charge. Estimated value is ₹400,000. The scope covers supply, installation, testing, and commissioning. The tender allows a 25% quantity variation during contract performance. The inclusion of installation and testing differentiates this procurement from simple equipment purchase and requires on-site readiness. Location details are not specified in the tender, indicating nationwide or unspecified venue procurement under army operations. Bidders should ensure the proposed mix aligns with the BOQ’s five items under a single delivery and commissioning workflow.

Technical Specifications & Requirements

  • Products: 2 Ton Split Air Conditioner, Voltage Stabilizer 5 KVA for 2 Ton AC, Outdoor Unit Stand, Copper Pipe
  • Scope: Supply, Installation, Testing and Commissioning (SITC) of all five items
  • Delivery terms: Delivery period tied to Order date with option to extend per quantity variation clause
  • Variants: Five items in one package; no itemized specs listed in BOQ; ATC references may detail brand or model requirements
  • Key requirements: SITC readiness, on-site installation capability, and coordination with military procurement processes
  • Compliance indicators: Ensure compatibility with 2 Ton capacity, stabilizer sizing for 5 KVA, and proper copper piping standards

Terms, Conditions & Eligibility

  • Quantity: Up to 25% variation in ordered quantity at contract rates; extended delivery based on proportional time calculation
  • Delivery: SITC delivery timing linked to original delivery order; extended time calculations apply
  • Scope: Bid price must include all components for SITC of the five items
  • ATC: Buyer-added terms and conditions may restrict substitutions; bidders should review the ATC document for final compliance
  • EMD: Amount not disclosed in summary; bidders should verify ATC for exact EMD and payment terms
  • Documentation: Submit technical bid with evidence of SITC capability and installation manpower; OEM authorizations may be required

Key Specifications

  • Product: 2 Ton Split Air Conditioner

  • Accessory: Voltage Stabilizer 5 KVA for 2 Ton AC

  • Hardware: Outdoor Unit Stand, Copper Pipe

  • Service: Installation, Testing and Commissioning

  • Value: Estimated ₹400,000

Terms & Conditions

  • 25% quantity variation allowed during contract and currency

  • Scope includes SITC: supply, installation, testing, commissioning

  • Delivery timing linked to original order date; extended time rules apply

Important Clauses

Delivery Schedule

Delivery period begins from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days

Payment Terms

Bid price to include all cost components for SITC; EMD and additional payment terms to be clarified in ATC

Penalties/Liquidated Damages

LD provisions not disclosed in provided data; bidders must review ATC for penalties related to delays

Bidder Eligibility

  • Proven capability to execute SITC of air conditioning systems including installation and commissioning

  • Financial capacity to undertake ₹4,00,000 contract value

  • Compliance with OEM authorisation requirements as per ATC

Advertisement

Tender Data

Bid Details

Quantity

63

Category

2 Ton Split Air Conditioner

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

2 Ton Split Air Conditioner , Voltage Stabilizer 5 KVA for 2 Ton AC , Outdoor Unit Stand , Copper Pipe , Installation Charge

Pre-Bid & Qualification

Pre-Bid Date

12-10-2026 17:00:00

Pre-Bid Venue

HQ 40 Arty Div

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

AMBALA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AMBALAAMBALA--715-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10016690.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

2 Ton Split Air Conditioner

2 Ton Split Air Conditioner

7 nos Delivery: 15 days
#2

Voltage Stabilizer 5 KVA for 2 Ton AC

Voltage Stabilizer 5 KVA for 2 Ton AC

7 nos Delivery: 15 days
#3

Outdoor Unit Stand

Outdoor Unit Stand

7 nos Delivery: 15 days
#4

Copper Pipe

Copper Pipe

35 mtr Delivery: 15 days
#5

Installation Charge

Installation Charge

7 nos Delivery: 15 days
Advertisement

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar SITC projects

4

Financial statements (latest) demonstrating capability to undertake ₹4,00,000 value

5

EMD submission as per ATC guidelines (amount not disclosed in summary)

6

Technical bid detailing SITC capability and installation team composition

7

OEM authorisation or dealership certificate (if required by ATC)

8

Tax invoices and service tax/GST compliance documents (as applicable)

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for 2 Ton Split AC tender in India army?

Bidders must review the ATC for exact submission rules, provide SITC capability, manufacturer's authorization if required, and submit GST and PAN docs. The bid should include the full SITC price inclusive of installation, testing and commissioning, with evidence of experience in similar military projects.

What documents are required for Indian Army AC procurement in 2026?

Required documents typically include GST certificate, PAN card, experience certificates for SITC projects, latest financial statements, EMD as per ATC, OEM authorization, and technical bid detailing installation teams. Confirm exact EMD amount in the ATC document before submission.

What are the technical specifications for the 2 Ton AC package?

The tender specifies a 2 Ton Split AC plus a 5 KVA stabilizer, outdoor unit stand, and copper pipes; installation, testing and commissioning are included. Exact model numbers or IS/IEC standards should be confirmed in the ATC and BOQ details.

When is the delivery deadline for this Indian Army tender?

Delivery timelines are tied to the last date of the original delivery order with an option to extend, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days per cycle.

What are the eligibility criteria for this Army procurement?

Eligibility includes demonstrated SITC experience for similar AC installations, financial capacity for ₹4,00,000 value, and OEM authorization if required by the ATC. Bidders should ensure compliance with any brand or specification constraints.

What are the payment terms and penalties for delay?

Payment terms are detailed in the ATC; typical structure includes SITC-inclusive pricing. Penalties or liquidated damages are specified in the ATC; bidders should review for delay percentages and cap thresholds to avoid disputes.

What documents prove installation capability for military projects?

Submit installation team credentials, past SITC project reports, safety compliance records, and OEM certifications if required. Ensure manpower sufficiency and on-site safety plans to meet Indian Army procurement expectations.

Is OEM authorisation mandatory for this procurement?

OEM authorization is often required; verify in the ATC. If mandatory, provide current OEM agreement or authorised dealership documentation along with technical bid to demonstrate compliant supply and service support.

Advertisement