Progress
The Indian Army, Department Of Military Affairs, invites bids for a complete air conditioning package: 2 Ton Split Air Conditioner, Voltage Stabilizer 5 KVA for 2 Ton AC, Outdoor Unit Stand, Copper Pipe, and Installation Charge. Estimated value is ₹400,000. The scope covers supply, installation, testing, and commissioning. The tender allows a 25% quantity variation during contract performance. The inclusion of installation and testing differentiates this procurement from simple equipment purchase and requires on-site readiness. Location details are not specified in the tender, indicating nationwide or unspecified venue procurement under army operations. Bidders should ensure the proposed mix aligns with the BOQ’s five items under a single delivery and commissioning workflow.
Product: 2 Ton Split Air Conditioner
Accessory: Voltage Stabilizer 5 KVA for 2 Ton AC
Hardware: Outdoor Unit Stand, Copper Pipe
Service: Installation, Testing and Commissioning
Value: Estimated ₹400,000
25% quantity variation allowed during contract and currency
Scope includes SITC: supply, installation, testing, commissioning
Delivery timing linked to original order date; extended time rules apply
Delivery period begins from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Bid price to include all cost components for SITC; EMD and additional payment terms to be clarified in ATC
LD provisions not disclosed in provided data; bidders must review ATC for penalties related to delays
Proven capability to execute SITC of air conditioning systems including installation and commissioning
Financial capacity to undertake ₹4,00,000 contract value
Compliance with OEM authorisation requirements as per ATC
Quantity
63
Category
2 Ton Split Air Conditioner
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
2 Ton Split Air Conditioner , Voltage Stabilizer 5 KVA for 2 Ton AC , Outdoor Unit Stand , Copper Pipe , Installation Charge
Pre-Bid Date
12-10-2026 17:00:00
Pre-Bid Venue
HQ 40 Arty Div
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
AMBALA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | AMBALA | AMBALA | - | - | 7 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
2 Ton Split Air Conditioner
2 Ton Split Air Conditioner
Voltage Stabilizer 5 KVA for 2 Ton AC
Voltage Stabilizer 5 KVA for 2 Ton AC
Outdoor Unit Stand
Outdoor Unit Stand
Copper Pipe
Copper Pipe
Installation Charge
Installation Charge
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 2 Ton Split Air Conditioner | 2 Ton Split Air Conditioner | 7 | nos | peruss | 15 | |
| 2 | Voltage Stabilizer 5 KVA for 2 Ton AC | Voltage Stabilizer 5 KVA for 2 Ton AC | 7 | nos | peruss | 15 | |
| 3 | Outdoor Unit Stand | Outdoor Unit Stand | 7 | nos | peruss | 15 | |
| 4 | Copper Pipe | Copper Pipe | 35 | mtr | peruss | 15 | |
| 5 | Installation Charge | Installation Charge | 7 | nos | peruss | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar SITC projects
Financial statements (latest) demonstrating capability to undertake ₹4,00,000 value
EMD submission as per ATC guidelines (amount not disclosed in summary)
Technical bid detailing SITC capability and installation team composition
OEM authorisation or dealership certificate (if required by ATC)
Tax invoices and service tax/GST compliance documents (as applicable)
Key insights about HARYANA tender market
Bidders must review the ATC for exact submission rules, provide SITC capability, manufacturer's authorization if required, and submit GST and PAN docs. The bid should include the full SITC price inclusive of installation, testing and commissioning, with evidence of experience in similar military projects.
Required documents typically include GST certificate, PAN card, experience certificates for SITC projects, latest financial statements, EMD as per ATC, OEM authorization, and technical bid detailing installation teams. Confirm exact EMD amount in the ATC document before submission.
The tender specifies a 2 Ton Split AC plus a 5 KVA stabilizer, outdoor unit stand, and copper pipes; installation, testing and commissioning are included. Exact model numbers or IS/IEC standards should be confirmed in the ATC and BOQ details.
Delivery timelines are tied to the last date of the original delivery order with an option to extend, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days per cycle.
Eligibility includes demonstrated SITC experience for similar AC installations, financial capacity for ₹4,00,000 value, and OEM authorization if required by the ATC. Bidders should ensure compliance with any brand or specification constraints.
Payment terms are detailed in the ATC; typical structure includes SITC-inclusive pricing. Penalties or liquidated damages are specified in the ATC; bidders should review for delay percentages and cap thresholds to avoid disputes.
Submit installation team credentials, past SITC project reports, safety compliance records, and OEM certifications if required. Ensure manpower sufficiency and on-site safety plans to meet Indian Army procurement expectations.
OEM authorization is often required; verify in the ATC. If mandatory, provide current OEM agreement or authorised dealership documentation along with technical bid to demonstrate compliant supply and service support.