Progress
Heavy Engineering Corporation Limited invites bids for the supply of goods at the Custody Stores, Foundry Forge Plant, Ranchi, Jharkhand 829205. The scope covers delivery to Plant Plaza Road, Ranchi 834004 with a flexible quantity clause allowing a 25% increase/decrease at contracted rates. Required bidder documentation includes PAN, GSTIN, Cancelled Cheque, and EFT Mandate. OEM authorization is mandatory for distributors, with full bid submission to include Manufacturer/Original Equipment details. This tender emphasizes timely delivery and contract termination rights for non-compliance. Unique aspects include material acceptance terms and termination triggers tied to delivery performance. The absence of BOQ items suggests framework or goods categories yet to be defined by the purchaser.
Quantity variation up to 25% during contract with adjusted delivery time.
Delivery address: Custody Stores, Foundry Forge Plant, Ranchi 834004.
Mandatory bidder documents: PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization.
Not explicitly specified in data; confirm in final tender. Expect standard GEM terms possibly including milestone or COD/LC.
Delivery period calculated from original delivery date; extended period for increased quantity follows (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Termination rights exist for non-delivery or default; LD provisions not detailed in data; verify in final documents.
Must possess PAN and GSTIN registration
Authorized distributor must provide Manufacturer Authorization/OEM details
Capability to deliver goods to Ranchi, Jharkhand 834004 within stipulated period
Quantity
1
Bid Type
Service
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
1 years
Tender Category
Goods
Bid To RA
No
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Ranchi
Delivery Pincodes
834004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Usha | 834004,FP PURCHASE DEPT FFP ADM BUILDING HEAVY ENGGINEERING CORPORATION LTD DHURWA RANCHI | Ranchi | Jharkhand | 834004 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
10-Sep-2026, 7:30 am
Opening Date
11-Sep-2026, 7:30 am
Extended Deadline
07-Sep-2026, 7:30 am
Opening Date
08-Sep-2026, 7:30 am
PAN Card
GSTIN Certificate
Cancelled Cheque
EFT Mandate (certified by Bank)
OEM Authorization/Manufacturer Authorization for distributors
Any bid-specific TAM or certificate as required by terms
Key insights about JHARKHAND tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide OEM authorization if acting through a distributor. Ensure delivery to Custody Stores, Foundry Forge Plant, Ranchi 834004 within the quoted period and comply with the 25% quantity variation clause.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization. Include any other bid-specific certificates or financial statements as requested. Ensure the bid packet clearly identifies the organization and product scope, with delivery address confirmed in Ranchi.
Delivery must reach Custody Stores, Foundry Forge Plant, Ranchi 834004; original delivery schedule applies, with potential extension based on the 25% quantity variation formula, minimum 30 days extension where applicable.
Authorized distributors must furnish Manufacturer Authorization/Certificate detailing OEM name, contact, and scope. This ensures the bidder is empowered to supply the goods to Heavy Engineering Corporation Limited from Ranchi.
EMD terms are not stated; bidders should prepare standard EMD documentation per GEM guidelines and be ready to comply with payment terms once published, typically linked to delivery milestones and acceptance tests.
Purchaser may increase/decrease quantity up to 25% at contracted rates; delivery period extends proportionally using the specified formula, with a minimum of 30 days, allowing flexibility in order size.
Scope states 'Only supply of Goods' without BOQ items; bidders should anticipate a procurement of various goods to be defined by the purchaser and prepare generic supply capabilities accordingly.
Delivery and installation (if applicable) must occur at Heavy Engineering Corporation Limited, Custody Stores, Foundry Forge Plant, Plant Plaza Road, Ranchi 834004, Jharkhand.