TenderDekho Logo
Closed GEM

Contract Bidding Open For Earthwork Excavation,Sand Filling,Back Filling,PCC,RCC Sub structure,RCC super structure,Shuttering in EAST SINGHBHUM, JHARKHAND

Bid Publish Date

19-Apr-2025, 10:26 am

Bid End Date

12-May-2025, 11:00 am

EMD

₹15,000

Value

₹14,61,495

Progress

Issue19-Apr-2025, 10:26 am
Technical05-Nov-2025, 1:05 pm
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

4182

Bid Type

Two Packet Bid

Categories 106

Uranium Corporation Of India Limited announces a tender for Earthwork Excavation, Sand Filling, Back Filling, PCC, RCC Sub structure, RCC super structure, Shuttering, Steel reinforcement, Brick work in Foundation, Brick work Super Structure, Half brick, 15mm plaster, 12mm plaster, 6 mm plaster, neat cement punning, MS sheet door, White washing, Acrylic Smooth exterior paint, Synthetic enamel paint, Making plinth protection, PVC rain water pipe, Chemical emulsion, Diluting and injecting chemical emulsion, Cutting holes in EAST SINGHBHUM, JHARKHAND. Quantity: 4182. Submission Deadline: 12-05-2025 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Earthwork Excavation , Sand Filling , Back Filling , PCC , RCC Sub structure , RCC super structure , Shuttering , Steel reinforcement , Brick work in Foundation , Brick work Super Structure , Half brick , 15mm plaster , 12mm plaster , 6 mm plaster , neat cement punning , MS sheet door , White washing , Acrylic Smooth exterior paint , Synthetic enamel paint , Making plinth protection , PVC rain water pipe , Chemical emulsion , Diluting and injecting chemical emulsion , Cutting holes

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7669104.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Earthwork Excavation

Earthwork in excavation in the following types of soil and rock up to and including 1.5 mtr Lead including bailing or pumping out any water accumulating inside the excavated pit or trench shoring strutting as directed by Engineer adequate protection to be taken during excavation or drilling or blasting transporting the excavated soil for all lead &stacking selectively including disposing off the rubbish rock fragments excess spoils etc lead upto 100 Mtrs in the area as directed by the Engineer all complete as per drawing specification and direction of the Engineer All types of soil

77 cum Delivery: 180 days
#2

Sand Filling

Supplying and filling in plinth with sand under floors including watering ramming consolidating and dressing complete as per direction of Engineer in charge

4 cum Delivery: 180 days
#3

Back Filling

Earth work in back filling with available earth including watering and compaction at all elevations around foundations walls wells tunnels pits culverts trenches road approaches and in plinth filling and area filling as per specifications and drawings and as directed by the Engineer with selected spoil within a lead of 100 mtr

86 cum Delivery: 180 days
#4

PCC

Supply mix place in position compact and cure cement concrete 1 cement 3 coarse sand 6 graded stone aggregate 20 mm nominal size below foundations walls wells pits trenches etc and in basin lining as per specifications drawings and directions of the Engineer and including cost of centring and shuttering cement and compaction of base

57 cum Delivery: 180 days
#5

RCC Sub structure

Supply mix place in position compact and cure reinforced cement concrete 1 cement 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size below foundations walls wells pits trenches etc and in basin lining as per specifications drawings and directions of the Engineer and including cost of centring and shuttering and cement but excluding cost of reinforcement

9 cum Delivery: 180 days
#6

RCC super structure

Supply mix place in position compact & cure reinforced cement concrete 1 cement 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size in super structure walls roofs column beam etc as per specifications drawings and directions of the Engineer and including cost of centring and shuttering and cement but excluding cost of reinforcement

17 cum Delivery: 180 days
#7

Shuttering

Centering and shuttering including strutting propping etc and removal of form for Suspended floors roofs landings balconies and access platform columns walls etc Complete as per direction of EIC

190 sqm Delivery: 180 days
#8

Steel reinforcement

Steel reinforcement for RCC work including straightening cutting bending placing in position and binding all complete upto any level above or below plinth as per direction of EIC including welding if required TMT bars

2,730 kg Delivery: 180 days
#9

Brick work in Foundation

Supply and laying in position brick work with designate 75 bricks compressive strength not less than 75 Kg per SqCm in foundation plinth etc in cement coarse sand mortar 1 isto 6 including mixing mortar laying bricks raking joints curing etc complete with all materials and labour as per drawings and specifications including cost of cement

4 cum Delivery: 180 days
#10

Brick work Super Structure

Supply and laying in position brick work with designate 75 bricks compressive strength not less than 75 Kg per SqCm in super structure etc in cement coarse sand mortar 1 isto 6 including mixing mortar laying bricks raking joints curing etc complete with all materials and labour as per drawings and specifications including cost of cement

24 cum Delivery: 180 days
#11

Half brick

Half brick masonry with common burnt clay FPS non modular bricks of class designation 7.5 in superstructure above plinth level up to floor V level Cement mortar 1 cement 4 coarse sand all complete as per direction of engineer in charge including cost of all materials labours etc

8 sqm Delivery: 180 days
#12

15mm plaster

Minimum 15mm thick plastering with 1cement 6 coarse sand to all faces of walls channels in roof and other structures at various elevations including mixing laying finishing curing and necessary scaffolding work complete as per drawings specifications and instructions of the Engineer with all materials and labours including cost of cement

119 sqm Delivery: 180 days
#13

12mm plaster

12mm thick plastering with 1cement 6 coarse sand to all faces of walls channels in roof and other structures at various elevations including hacking the surface mixing laying finishing curing and necessary scaffolding work complete as per drawings specifications and instructions of the Engr with all materials and labours including cost of cement

170 sqm Delivery: 180 days
#14

6 mm plaster

6 mm cement plaster of mix 1 cement 3 fine sand at various elevations including hacking the surface mixing laying finishing curing and necessary scaffolding work complete as per drawings specifications and instructions of the Engr with all materials and labours including cost of cement

90 sqm Delivery: 180 days
#15

neat cement punning

Providing neat cement punning including curing carriage of water with all leads and lifts as per building specification and direction of EIC

35 sqm Delivery: 180 days
#16

MS sheet door

Providing and fixing 1mm thick MS sheet door with frame of 40 into 40 into 6 mm angle iron and 3 mm MS gusset plates at the junctions and corners all necessary fittings complete including applying a priming coat of approved steel primer all complete as per direction of EIC Using MS angels 40 into 40 into 6 mm for diagonal braces

6 sqm Delivery: 180 days
#17

White washing

White washing three or more coats over new surface with apprived quality of lime including cost of cleaning surface thoroughly and removing the scales of smokeand mosh marks with jhama rubbing scaffolding washing of floors and taxes all complete as per building specification and direction of EIC

193 sqm Delivery: 180 days
#18

Acrylic Smooth exterior paint

Finishing walls with Acrylic Smooth exterior paint of required shade New work Two or more coat applied at the rate 1.67 ltr per 10 sqm over and including priming coat of exterior primer applied at the rate 2.20 kg per 10 sqm scaffolding cost of all materials complete as per direction of Engineer

170 sqm Delivery: 180 days
#19

Synthetic enamel paint

Painting with synthetic enamel paint of approved brand and manufacturer of required colour to give an even shade two or more coats on new or old work over a priming coat complete as per specification and direction of EIC

8 sqm Delivery: 180 days
#20

Making plinth protection

Making plinth protection 50mm thick of cement concrete 1 cement 3 coarse sand zone III 6 graded stone aggregate 20 mm nominal size over 75mm thick bed of dry brick ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including necessary excavation levelling and dressing and finishing the top smooth

70 sqm Delivery: 180 days
#21

PVC rain water pipe

Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A including bend shoes etc and jointing with seal ring conforming to IS 5382 leaving 10 mm gap for thermal expansion Single socketed pipes 110 mm diameter

24 rm Delivery: 180 days
#22

Chemical emulsion

Supplying chemical emulsion in sealed containers including delivery as specified Chlorpyriphos per Lindane emulsifiable concentrate of 20 percent

25 ltr Delivery: 180 days
#23

Diluting and injecting chemical emulsion

Diluting and injecting chemical emulsion for POST CONSTRUCTIONAL anti termite treatment excluding the cost of chemical emulsion Along external wall where the apron is not provided or and along internal wall using chemical emulsion at the rate 7.5 litres per sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall and rodding etc complete With Chlorpyriphos per Lindane EC 20 percent with 1percent concentration all complete as per directionof EIC

64 rm Delivery: 180 days
#24

Cutting holes

Cutting holes of required size in brick masonry wall for fixing of exhaust fan including providing and fixing 300 mm dia PVC pipe conforming BIS 12818 and making good the same etc complete as per direction of EIC

2 each Delivery: 180 days

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
K.G. ENTERPRISES   Under PMA
-11-05-2025 13:05:05
2
M/S. V.K. ENTERPRISES   Under PMA
-11-05-2025 21:22:40
3
MANORANJAN KUMAR CONSTRUCTION PRIVATE LIMITED   Under PMA
-11-05-2025 18:55:16
4
MS A.K.ENTERPRISES   Under PMA
-11-05-2025 14:36:55
5
PRAKASH KUMAR SINGH   Under PMA
-12-05-2025 07:35:36
6
RAMLAL SINGH AND SONS   Under PMA
-12-05-2025 09:47:02

Financial Results

Rank Seller Price Item
L1
MANORANJAN KUMAR CONSTRUCTION PRIVATE LIMITED(MII)   Under PMA
Item Categories : Earthwork Excavation,Sand Filling,Back Filling,PCC,RCC Sub structure,RCC super structure,Shuttering
L2
MS A.K.ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Earthwork Excavation,Sand Filling,Back Filling,PCC,RCC Sub structure,RCC super structure,Shuttering
L3
PRAKASH KUMAR SINGH (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Earthwork Excavation,Sand Filling,Back Filling,PCC,RCC Sub structure,RCC super structure,Shuttering
L4
K.G. ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Earthwork Excavation,Sand Filling,Back Filling,PCC,RCC Sub structure,RCC super structure,Shuttering

Frequently Asked Questions

Key insights about JHARKHAND tender market

What are the eligibility requirements for the GEM/2025/B/6077710 tender?

The eligibility requirements include being a registered entity in civil construction, possessing relevant licenses, and having at least three years of experience in similar construction projects. Additionally, bidders must demonstrate compliance with local procurement rules and regulations.

What certifications are required for bidders participating in this construction tender?

Bidders are required to provide copies of necessary certificates including but not limited to:

  • GST Registration Certificate
  • PAN Card
  • Registration under relevant state and central tax authorities
  • Proof of experience through past project completions and quality assurance certificates.
How is the registration process for submitting a bid carried out?

To register for bidding, contractors need to submit an online application through the specified portal, including all required documentation as outlined in the tender. Each bidder must ensure that they provide accurate information and comply with submission formats specified to avoid disqualification.

What are the Earnest Money Deposit (EMD) and performance security requirements?

The EMD for this tender must be submitted as a bank guarantee or demand draft, which will be retained until the conclusion of the bidding process. A performance security of 5-10% of the contract value is also mandatory post-award, ensuring that the contractor meets the terms of the contract.

Will there be any additional benefits available for MSEs or startups?

Yes, the tender includes benefits for MSEs and special provisions tailored for startups, providing support in terms of reduced eligibility criteria and additional points during the evaluation process. This initiative promotes participation from smaller entities to enhance competition and drive local economic growth.