Mobile Workstation
Office Of Dg (mss)
HYDERABAD, TELANGANA
Menu
Bid Publish Date
10-Dec-2025, 10:04 am
Bid End Date
26-Dec-2025, 10:00 am
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Centre for Development of Advanced Computing (CDAC) under the Department of Electronics and Information Technology seeks Supply Installation Testing and Commissioning of Mobile Workstations. The tender defines scope including supply, installation, testing, and commissioning at consignee location with a 3-year warranty from final acceptance or post-install completion. The ATC confirms OEM warranty certificates required at delivery. There is an option clause allowing up to 25% quantity variation during contract; delivery timelines use a calculated extension formula with a minimum 30 days. This procurement targets vendors capable of nationwide after-sales support and established Indian service centers.
Key differentiators include a strong emphasis on warranty coverage, post-sales service network in India, and adherence to the option clause mechanics that impact delivery planning and pricing. The absence of BOQ items suggests a broad mobile workstation category rather than a fixed model list, underscoring the need for compliant, configurable configurations.
Product/service names: Mobile Workstations (supply, installation, testing and commissioning)
Quantities/values: Not specified; tender indicates scope for up to 25% variation
EMD/estimated value: Not specified in data; plan per standard procurement practice
Experience: Demonstrated capability in supplying similar mobile workstation solutions
Quality/standards: OEM warranty compliance; ISI/ISO considerations not explicitly stated
Delivery/installation: Installation, commissioning, and training as part of scope; service coverage in India
Option clause allowing up to 25% quantity variation during contract
3-year OEM warranty from final acceptance; certificates required at delivery
Supply, installation, testing and commissioning included; nationwide Indian service support
Not explicitly specified; bidders should align with standard government procurement payments and seek clarity from issuing authority
Delivery period commences from the last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in provided data; bidders should review ATC for LD provisions and performance penalties
Demonstrated experience in supplying mobile workstations with installation and commissioning
ON-GOVERNMENT OR INDIAN PUBLIC SECTOR experience preferred
Ability to provide 3-year OEM warranty and established service centers in India
Office Of Dg (mss)
HYDERABAD, TELANGANA
Bharat Electronics Limited (bel)
GHAZIABAD, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
Rangareddi, TELANGANA
Council Of Scientific And Industrial Research (csir)
Office Of Dg (hr)
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar mobile workstation supply
Financial statements demonstrating financial stability
EMD documentation or security deposit as per policy
Technical bid documents detailing workstation configurations
OEM authorization/authorisation from the original equipment manufacturer
Warranty certificates and servicing capability details
Service center locations near consignee destinations
Key insights about KERALA tender market
Bidders should submit GST and PAN, experience certificates, financial statements, OEM authorization, OEM warranty certificates, and technical bid detailing proposed workstation configuration. Ensure 3-year OEM warranty coverage and Indian service center details. Follow ATC and option clause for quantity variation up to 25% during contract.
Required documents include GST certificate, PAN, experience certificates for similar supplies, financial statements, EMD submission, OEM authorization, technical bid, and service center details in India. OEM warranty certificates must accompany delivery; ensure installation, testing and commissioning plan is included.
The tender specifies mobile workstation supply, installation, testing and commissioning with 3-year OEM warranty. Specific configurations are not listed; bidders must propose IS/ISO-compliant configurations and ensure OEM warranty coverage; ATC terms govern submission and compliance requirements.
Delivery timing follows the last date of the original delivery order; if the option clause is exercised, the extended period is calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
Payment terms are not explicitly stated in the provided data. Bidders should refer to standard government procurement terms and request clarity in the bid response, including milestones for installation acceptance and final payment after commissioning.
Bidders must demonstrate a well-established Installation, Commissioning, Training, Troubleshooting and Maintenance service group in India, with service center locations near consignee destinations and documented service response commitments.
The option clause allows increasing or decreasing bid quantity by up to 25% during contract placement or currency, with delivery time adjustments based on the specified formula; bidders must price accordingly and plan procurement logistics for potential scale-up.
Office Of Dg (ls)
📍 LEH, JAMMU & KASHMIR
Director General Telecom Hq
📍 WEST TRIPURA, TRIPURA
Punjabi University Patiala
📍 PATIALA, PUNJAB
Centre For Development Of Advanced Computing (c-dac)
📍 HYDERABAD, TELANGANA
Sant Longowal Institute Of Engineering And Technology (sliet)
📍 SANGRUR, PUNJAB
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS