TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs Pathankot Office Equipment Tender 2026 - BLUE STAR AC, Inverter, Wall Clock, Paper Shredder & More

Bid Publish Date

05-Sep-2026, 1:11 pm

Bid End Date

15-Sep-2026, 2:00 pm

Progress

Issue05-Sep-2026, 1:11 pm
AwardPending

Key Highlights

  • Organization requires procurement of multi-category office equipment including a 1 TON BLUE STAR AC with stabilizer and related items
  • Option clause permits ±25% quantity variation and delivery extensions with a calculated duration formula
  • Mandatory bidder onboarding documents: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate
  • Common brands referenced: BLUE STAR, HAVELLs components; no explicit ISI/ISO requirements listed

Tender Overview

The Indian Army, Department Of Military Affairs, Pathankot (Punjab 143534) seeks procurement of a broad office equipment package including BLUE STAR 1 TON AC with stabilizer, roller blinds, paper shredder, wall clock, cloth stands, MICROTEK inverter 1100VA with 200AH battery, electric kettle, serving tray set, Supreme Red cushion chair, wall fans, and office chairs. The tender involves 15 BOQ items with unspecified quantities; however, an option clause allows ±25% quantity adjustments at contracted rates. Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate documents for vendor code creation. Estimated value and EMD are not disclosed. Unique tender scope spans multiple common office appliances suitable for government operational needs. The contract contemplates delivery across the specified location within the extended delivery framework described in option terms.

Technical Specifications & Requirements

  • Product categories include air conditioning (1 TON AC with stabilizer), window/room accessories (roller blinds, wall clock, cloth stands, serving trays), power backup (MICROTEK inverter 1100VA with 200Ah battery), and office furniture including Supreme Red cushion chairs and office chairs, wall fans, and electric kettles.
  • No explicit technical standards are listed; buyers rely on typical government procurement compliance and OEM brand references like BLUE STAR and HAVELLs components.
  • BOQ lists 15 items, but item-wise quantities are not provided; bidders should prepare for multi-item delivery and coordinate with end-user specifications.
  • Delivery terms align with option clause allowing up to 25% quantity variation during contract, with time extensions calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
  • Documentation emphasis on supplier onboarding: PAN, GSTIN, Cancelled Cheque, EFT Mandate.
  • The tender emphasizes standard government procurement practices rather than detailed technical performance metrics.

Terms, Conditions & Eligibility

  • EMD details are not disclosed in the provided data; bidders should verify on official portal for exact amount and payment method.
  • Flexible quantity clause permits ±25% adjustment during contract and extended delivery period as per option clause.
  • Required documents for bid/ Vendor Code Creation: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank.
  • Delivery timeline appears tied to original delivery date with potential extensions as described; ensure alignment with end-user schedule.
  • No explicit warranty, penalties, or payment terms provided in the data; bidders should consult contract terms during bid submission.
  • Compliance with standard government procurement processes and vendor onboarding requirements is implied.

Key Specifications

  • Product/service names: BLUE STAR 1 TON AC with stabilizer, roller blinds, paper shredder, wall clock, cloth stand, cloth stand with wheel, MICROTEK INVERTER 1100VA with 200AH battery, electric kettle, serving tray set, Supreme Red Cushion Chair, wall fan Havells, office chair

  • Quantity: 15 item categories; exact quantities not disclosed

  • EMD/Estimated value: Not disclosed in available data

  • Delivery terms: option clause enables up to 25% quantity variation; delivery duration calculated as (increased quantity ÷ original quantity) × Original delivery period, minimum 30 days

  • Experience/Compliance: no explicit standards; rely on government procurement norms and OEM brand references

Terms & Conditions

  • Quantity variation up to 25% at contract award and during currency with rates fixed

  • Mandatory vendor onboarding documents: PAN, GSTIN, cancelled cheque, EFT mandate

  • Delivery period adjustments follow the option clause with minimum 30-day extension

Important Clauses

Payment Terms

Not specified in data; verify actual terms during bid stage with contract

Delivery Schedule

Delivery may extend per option clause; extended duration formula applies with minimum 30 days

Penalties/Liquidated Damages

Not specified in data; confirm LD terms and performance bonds during bidding

Bidder Eligibility

  • Must provide PAN, GSTIN, cancelled cheque, and EFT mandate

  • Ability to supply multi-item office equipment including HVAC, furniture, and accessories

  • Compliance with government procurement onboarding for vendor code creation

Tender Data

Bid Details

Quantity

29

Category

BLUE STAR 1 TON AC HOT AND COLD WITH STABILIZER

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

BLUE STAR 1 TON AC HOT AND COLD WITH STABILIZER , ROLLER BLINDS , PEN STAND , PAPER SHEREDDER , DOOR BELL , STABILIZER 90V TO 300V , WALL CLOCK , WALL MOUNTEN CLOTH STAND , CLOTH STAND WITH WHEEL , MICROTEK INVERTER 1100VA WITH 200AH BATTERY , ELECTRIC KETTLE , SERVING TRAY SET , SUPREME RED CUSHION CHAIR , WALL FAN HAVELLS , OFFICE CHAIR

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

PATHANKOT

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PATHANKOTPATHANKOT--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9850975.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

BLUE STAR 1 TON AC HOT AND COLD WITH STABILIZER

BLUE STAR 1 TON AC HOT AND COLD WITH STABILIZER

1 nos Delivery: 15 days
#2

ROLLER BLINDS

ROLLER BLINDS

2 nos Delivery: 15 days
#3

PEN STAND

PEN STAND

1 nos Delivery: 15 days
#4

PAPER SHEREDDER

PAPER SHEREDDER

2 nos Delivery: 15 days
#5

DOOR BELL

DOOR BELL

1 nos Delivery: 15 days
#6

STABILIZER 90V TO 300V

STABILIZER 90V TO 300V

1 nos Delivery: 15 days
#7

WALL CLOCK

WALL CLOCK

1 nos Delivery: 15 days
#8

WALL MOUNTEN CLOTH STAND

WALL MOUNTEN CLOTH STAND

1 nos Delivery: 15 days
#9

CLOTH STAND WITH WHEEL

CLOTH STAND WITH WHEEL

2 nos Delivery: 15 days
#10

MICROTEK INVERTER 1100VA WITH 200AH BATTERY

MICROTEK INVERTER 1100VA WITH 200AH BATTERY

2 nos Delivery: 15 days
#11

ELECTRIC KETTLE

ELECTRIC KETTLE

1 nos Delivery: 15 days
#12

SERVING TRAY SET

SERVING TRAY SET

1 nos Delivery: 15 days
#13

SUPREME RED CUSHION CHAIR

SUPREME RED CUSHION CHAIR

10 nos Delivery: 15 days
#14

WALL FAN HAVELLS

WALL FAN HAVELLS

2 nos Delivery: 15 days
#15

OFFICE CHAIR

OFFICE CHAIR

1 nos Delivery: 15 days

Categories 25

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate copy certified by bank

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid on the Indian Army Pathankot office equipment tender in 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate for vendor code creation. Ensure you can supply the 15 item categories, with potential ±25% quantity variation. Verify any EMD amount on the official portal and align delivery timelines with the option clause requirements.

What documents are required for Pathankot procurement of office equipment?

Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. These are essential for vendor code creation and bid submission; ensure copies are legible and match the company details.

What is the delivery extension rule for this Indian Army tender?

Delivery extensions follow the option clause: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is under 30 days, the extension equals the original period; extensions may apply during currency of contract.

Which product categories are included in the Pathankot blue star tender 2026?

The package includes BLUE STAR 1 TON AC with stabilizer, roller blinds, paper shredder, wall clock, cloth stands (including with wheel), MICROTEK inverter 1100VA with 200Ah battery, electric kettle, serving tray set, Supreme Red cushion chair, wall fan (Havells), and office chairs.

Are EMD details specified for the Pathankot procurement tender?

EMD details are not disclosed in the available data; bidders should check the official portal for exact EMD amount, mode of payment, and submission deadline as part of bid preparation.

What are the key eligibility criteria for supplying this equipment?

Eligibility includes the ability to supply diverse office equipment, compliance with vendor onboarding (PAN, GSTIN, EFT mandate), and adherence to government procurement norms. Exact EMD, delivery timelines, and warranty terms should be confirmed in the tender documents before bid submission.

When will delivery be expected after order placement in Pathankot?

Delivery timelines depend on the original delivery schedule; any extensions follow the option clause with a minimum 30 days. Coordinate with end-user timing and ensure readiness for multi-item delivery across the specified Pathankot location.