TenderDekho Logo
Active GEM

Open Tender for 1RU Router,L3Access Switches POE,1000 Base LX transceivers LC connector sm,Tri-band access point,WL in SOUTH DELHI, DELHI

Bid Publish Date

01-Sep-2026, 11:01 am

Bid End Date

01-Oct-2026, 11:00 am

EMD

₹8,35,000

Value

₹1,67,45,524

Progress

Issue01-Sep-2026, 11:01 am
AwardPending

Public procurement opportunity for Director General Of Civil Defence 1RU Router, L3Access Switches POE, 1000 Base LX transceivers LC connector sm, Tri-band access point, WLC controller support, UTP cable CAT 6, 24 port Patch Panel CAT 6, Information outlets CAT 6, face plate dual port, Patch Cord CAT 6, Optical Fiber Patch Cord, Wire ManagerPatch Chord Minder panel, Supply of Gang Box, 19 RackFloor standing, PVC conduit, UTP CAT 6A or CAT 6 cable or STP Cable, Installation Termination of information outlets, Installation Termination of UTP cables, Performance testing of the laid UTP CAT 6 CAT 6A STP cable, Jack Panel with cable manager, Gang box with Faceplate, floor mount Rack 42U with all accessories, Installation of PVC conduit of OD, 6KVA Online UPS with battery for NOC Rack, Access Switches POE, faceplate dual port, Gang Box, PVC conduit of OD, Laying of UTP CAT 6A CAT 6 cable STP Cable, PVC conduit of OD size PerMeter 32 mm, Technical support in SOUTH DELHI, DELHI. Quantity: 2261 issued by. Submission Deadline: 01-10-2026 11: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

2261

Category

1RU Router

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

81

OEM Avg. Turnover

400

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1RU Router , L3Access Switches POE , 1000 Base LX transceivers LC connector sm , Tri-band access point , WLC controller support , UTP cable CAT 6 , 24 port Patch Panel CAT 6 , Information outlets CAT 6 , face plate dual port , Patch Cord CAT 6 , Optical Fiber Patch Cord , Wire ManagerPatch Chord Minder panel , Supply of Gang Box , 19 RackFloor standing , PVC conduit , UTP CAT 6A or CAT 6 cable or STP Cable , Installation Termination of information outlets , Installation Termination of UTP cables , Performance testing of the laid UTP CAT 6 CAT 6A STP cable , Jack Panel with cable manager , Gang box with Faceplate , floor mount Rack 42U with all accessories , Installation of PVC conduit of OD , 6KVA Online UPS with battery for NOC Rack , Access Switches POE , faceplate dual port , Gang Box , PVC conduit of OD , Laying of UTP CAT 6A CAT 6 cable STP Cable , PVC conduit of OD size PerMeter 32 mm , Technical support

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

62

Pre-Bid & Qualification

Pre-Bid Date

31-08-2026 13:00:00

Pre-Bid Venue

DG-FS,CD & HG , East block-07, Level-07, R.K. Puram, Sector-1, New Delhi

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

New Delhi

Delivery Pincodes

110066

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Yogesh Kumar110066,DIRECTORATE GENERAL - FIRE SERVICE, CIVIL DEFENCE & HOME GUARDS East Block 7 Level 7 R K Puram New Delhi-110066New DelhiDelhi110066290-

Authority Records

MINISTRY OF HOME AFFAIRSHOME DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9733442.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Director General Of Civil Defence

Office Name

Dg Fs Cd Hg Attached Office Of Mha

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 43 Items Sign in for GEM prices

#1

1RU Router

1 NIM slot and 4x 1 Gigabit Ethernet WAN ports 5years warranty Installation and Configuration of Router

2 nos Delivery: 90 days
#2

L3Access Switches POE

Layer 3 manageable 48 Port Switch POE 10 1001000 Mbps 4 SFP Uplink ports slot stacking support 320Gbps better stacking 5year warranty Installation Configuration

2 nos Delivery: 90 days
#3

1000 Base LX transceivers LC connector sm

LC connector sm 5 years warranty for 1000 Base LX transceivers with LC connector sm

4 nos Delivery: 90 days
#4

Tri-band access point

802.11ax 4x4 multiuser multiple input output MUMIMO supporting four spatial streams Supports 2.4 GHz 5 GHz 6 GHz bands PHY data rates up to 7.49 Gbps 5 years warranty installation configratution

14 nos Delivery: 90 days
#5

WLC controller support

WLC controller support upto 250 Aps and 5K clients 5years warranty Installation and Configuration of WLC

1 nos Delivery: 90 days
#6

UTP cable CAT 6

Supply of UTP cable CAT 6 305 Meter Box

2 nos Delivery: 90 days
#7

24 port Patch Panel CAT 6

Supply of 24 port Patch Panel CAT 6 loaded with IO

4 nos Delivery: 90 days
#8

Information outlets CAT 6

Supply of Information outlets CAT 6

87 nos Delivery: 90 days
#9

face plate dual port

Supply of faceplate dual port

87 nos Delivery: 90 days
#10

Patch Cord CAT 6

Supply of Patch Cord CAT 6 1 Meter

87 nos Delivery: 90 days
#11

Patch Cord CAT 6

Supply of Patch Cord CAT 6 2 Meter

87 nos Delivery: 90 days
#12

Optical Fiber Patch Cord

Supply of Optical Fiber Patch Cor SM LC LC Length 3 m

6 nos Delivery: 90 days
#13

Wire ManagerPatch Chord Minder panel

Supply of Wire Manager or Patch Chord Minder panel

4 nos Delivery: 90 days
#14

Supply of Gang Box

Supply of Gang Box

11 nos Delivery: 90 days
#16

19 RackFloor standing

19 Rack Floor standing 800X1000 mm depth 42 U height Front & back door lockable Front glass door toughened 4mm with all accessories

1 nos Delivery: 90 days
#19

PVC conduit

Supply of PVC conduit of OD Per meter 32 MM

190 nos Delivery: 90 days
#20

UTP CAT 6A or CAT 6 cable or STP Cable

Laying of UTP CAT 6A or CAT 6 cable or STP Cable per meter

610 nos Delivery: 90 days
#21

Installation Termination of information outlets

Installation Termination of information outlets including termination of CAT 6A CAT 6 STP cable

87 nos Delivery: 90 days
#22

Installation Termination of UTP cables

Installation Termination of UTP cables on Patch Panel CAT 6 CAT 6A STP Cable with wire Manager

87 nos Delivery: 90 days
#23

Performance testing of the laid UTP CAT 6 CAT 6A STP cable

Performance testing of the laid UTP CAT 6 CAT 6A STP cable Penta scanner report & documentation per node

87 nos Delivery: 90 days
#24

Jack Panel with cable manager

Installation of Jack Panel with cable manager

4 nos Delivery: 90 days
#25

Gang box with Faceplate

Installation of Gang box with Faceplate

11 nos Delivery: 90 days
#26

floor mount Rack 42U with all accessories

Installation of floor mount Rack 42U with all accessories

1 nos Delivery: 90 days
#27

Installation of PVC conduit of OD

Installation of PVC conduit of OD size PerMeter 32 mm

190 nos Delivery: 90 days
#28

6KVA Online UPS with battery for NOC Rack

6KVA Online UPS with battery for NOC Rack5 year warranty Installation of 6KVA UPS with battery1

1 nos Delivery: 90 days
#29

Access Switches POE

Layer 2 manageable 24 Port Switch with POE 10 100 1000 Mbps with 4 SFP Uplink ports and slot for stacking with support for 80Gbps 5year warranty Installation and Configuration

1 nos Delivery: 90 days
#31

UTP cable CAT 6

Supply of UTP cable CAT 6 305 Meter Box

1 box Delivery: 90 days
#32

24 port Patch Panel CAT 6

Supply of 24 port Patch Panel CAT 6 loaded with IO

1 nos Delivery: 90 days
#33

Information outlets CAT 6

Supply of Information outlets CAT 6

17 nos Delivery: 90 days
#34

faceplate dual port

Supply of face plate dual port

17 nos Delivery: 90 days
#35

Patch Cord CAT 6

Supply of Patch Cord CAT 6 1 Meter

17 nos Delivery: 90 days
#36

Patch Cord CAT 6

Supply of Patch Cord CAT 6 2 Meter

17 nos Delivery: 90 days
#37

Wire ManagerPatch Chord Minder panel

Supply of Wire Manager Patch Chord Minder panel

1 nos Delivery: 90 days
#38

Gang Box

Supply of Gang Box

3 nos Delivery: 90 days
#39

PVC conduit of OD

Supply of PVC conduit of OD size Per meter 32 MM

80 mtr Delivery: 90 days
#40

Laying of UTP CAT 6A CAT 6 cable STP Cable

Laying of UTP CAT 6A CAT 6 cable STP Cable per meter

305 mtr Delivery: 90 days
#41

Installation Termination of information outlets

Installation Termination of information outlets including termination of CAT 6A CAT 6 STP cable on IO

17 nos Delivery: 90 days
#42

Installation Termination of UTP cables

Installation Termination of UTP cables on Patch Panel CAT 6 CAT 6A STP Cable with wire Manager

17 nos Delivery: 90 days
#43

Performance testing of the laid UTP CAT 6 CAT 6A STP cable

Performance testing of the laid UTP CAT 6 CAT 6A STP cable Penta scanner report documentationper node

17 nos Delivery: 90 days
#44

Jack Panel with cable manager

Installation of Jack Panel with cable manager

1 nos Delivery: 90 days
#45

Gang box with Faceplate

Installation of Gang box with Faceplate

1 nos Delivery: 90 days
#46

PVC conduit of OD size PerMeter 32 mm

Installation of PVC conduit of OD PerMeter 32 mm

80 mtr Delivery: 90 days
#47

Technical support

technical support man power service for five years

1 person Delivery: 90 days

Categories 49

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer