Bid Publish Date
31-Mar-2026, 4:51 pm
Bid End Date
24-Apr-2026, 5:00 pm
Location
Progress
RABharat Electronics Limited (Department of Defence Production) in Ghaziabad, Uttar Pradesh seeks a Split Air Conditioner – Wall Mount Type (V3) that is ISI Marked to IS 1391 (Part 2). The tender scope covers supply with an option to increase quantity up to 25% of bid quantity during contract, at contracted rates. Delivery location is I.G. Stores, BEL, Site IV, Sahibabad, Ghaziabad 201010; installation and commissioning, if included, must be performed by OEM/OEM-certified resources. A data sheet must accompany the bid, and GST is the bidder’s responsibility with reimbursement as per actuals or applicable rates (whichever is lower). The bid requires OEM authorization wherever distributors bid. The tender emphasizes non-toxicity of materials and proper invoicing in consignee name with GSTIN. Unique terms emphasize verification of technical parameters against the data sheet.
Product: Split air conditioner, wall mount, V3 ISI Marked to IS 1391 (Part 2)
Data sheet must match bid offering and be uploaded
Installation/commissioning by OEM or OEM-certified resource
Distributors must provide Manufacturer Authorization
Non-toxic materials; MSDS available if toxic materials are present
Invoice to be raised in consignee name with GSTIN
Option to increase quantity up to 25% during contract at contracted rates
Delivery terms begin from last date of original delivery order; extension rules apply
GST payable by bidder; reimbursement as per actuals or applicable lower rate
GST handling by bidder; reimbursement at actuals or lower applicable rate; payment terms to be finalized with offer
Delivery starts after original delivery order; additional time via formula (quantity-based) with minimum 30 days
Not specified in available terms; standard BEL supplier penalties to apply per contract
Authorized OEM/ODM capability or OEM-certified reseller presence
Ability to upload accurate ISI IS 1391 (Part 2) data sheet
GSTIN and PAN validity; financial capability to fulfill upfront or advance payments
Start
23-Aug-2026, 11:00 am
End
31-Aug-2026, 10:00 am
Duration: 191 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
24-Apr-2026, 11:30 am
Opening Date
24-Apr-2026, 12:00 pm
Extended Deadline
17-Apr-2026, 11:30 am
Opening Date
17-Apr-2026, 12:00 pm
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Data Sheet of offered product
Manufacturer/OEM Authorization form with details
Vendor code creation documents as applicable
Any additional OEM certifications or compliance documents
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization if bidding via a distributor. Upload the product data sheet with exact ISI 1391 (Part 2) V3 specs and ensure OEM installation capability. Ensure GST handling aligns with local rules and tender terms. Delivery is to BEL Sahibabad address.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, data sheet for offered AC model, OEM authorization, and vendor code creation documents. Ensure data sheet matches the requested ISI Marked standard and that installation is feasible via OEM-certified resources.
The product must be ISI Marked to IS 1391 (Part 2) with V3 designation. This requires manufacturer certification, data-sheet alignment with the standard, and OEM installation capability. Verify all parameters against the data sheet before submission.
Delivery and installation must be performed at I.G. Stores, BEL, Site IV, Industrial Area, Bharat Nagar Post, Sahibabad, Ghaziabad 201010. Ensure transport packaging and safe handling to meet BEL requirements and GST invoicing norms.
BEL reserves the right to increase or decrease bid quantity up to 25% at contract placement and during currency at contracted rates. Additional time is calculated by (additional quantity ÷ original quantity) × original delivery period, minimum 30 days, with potential extension up to the original delivery period.
Installation must be performed by the OEM or an OEM-certified resource or OEM-authorized reseller. This ensures proper commissioning and testing per ISI compliance. Ensure technicians are trained for on-site configuration and provide post-installation support as per contract.
Bid responses require GST handling by the bidder; BEL will reimburse per actuals or the lower applicable rate. Invoices must be raised in the consignee’s name with the consignee GSTIN to ensure timely processing and tax compliance.
The data sheet must precisely reflect offered AC specifications and be uploaded with the bid. BEL cross-checks the data sheet against actual product parameters; any mismatch may lead to bid rejection or disqualification from the procurement process.