GEM

Contract Bidding Open For Designing and construction of doubles howe adjoining flat truss,Construction and Installation of Mi in POONCH, JAMMU & KASHMIR

Posted

09 Oct 2025, 06:14 pm

Deadline

22 Oct 2025, 12:00 pm

EMD

₹75,000

Value

₹24,93,000

Progress

Issue09 Oct 2025, 06:14 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4078

Category

Designing and construction of doubles howe adjoining flat truss

Bid Type

Two Packet Bid

Categories 13

Indian Army invites bids for Designing and construction of doubles howe adjoining flat truss, Construction and Installation of Mild Steel Column. , Installation of Structure Purling, Fixing and Installation of Cross Member, Covering, Fixing, Installation of Entire Structure with 0. 63 Millimeter Galvanized Metal Sheet, Construction and Installation of Water Drainage Plan, Painting Entire Structure with 02 Coats of Red Oxide, 02 Coats of Enamel Paint Colour Chosen by User, Construction of Reinforced Cement Concrete Flooring, 12 millimetre wooden tiles approved by user 800 sqft, Designing and Installation of Glass Doors and Windows, Installation of toughen glass door used in heavy duty aluminum frame having size of 4 X 8 feet, Auto soft close machine system for all doors stainless steel handles will be placed, Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex, Installation of Qty 16 x 200 Watt non-masked led lights, Specifications of Synthetic Floor Mats for Badminton Courts are as Under, Quantity of net poles posts 04 Badminton World Federation Specification in POONCH, JAMMU & KASHMIR. Quantity: 4078. Submission Deadline: 22-10-2025 12: 00: 00. Submit your proposal before the deadline.

Bill of Quantities (BOQ) 16 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Designing and construction of doubles howe adjoining flat truss Designing and construction of doubles howe adjoining flat truss 8 nos adjut_16rr 120
2 Construction and Installation of Mild Steel Column. Construction and Installation of Mild Steel Column. 20 nos adjut_16rr 120
3 Installation of Structure Purling Installation of Structure Purling 18 nos adjut_16rr 120
4 Fixing and Installation of Cross Member Fixing and Installation of Cross Member 783 rft adjut_16rr 120
5 Covering, Fixing, Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet Covering, Fixing, Installation of Entire Structure with 0.63 Millimeter Galvanized Metal Sheet 87 nos adjut_16rr 120
6 Construction and Installation of Water Drainage Plan Construction and Installation of Water Drainage Plan 148 rft adjut_16rr 120
7 Painting Entire Structure with 02 Coats of Red Oxide, 02 Coats of Enamel Paint Colour Chosen by User Painting Entire Structure with 02 Coats of Red Oxide, 02 Coats of Enamel Paint Colour Chosen by User 80 ltr adjut_16rr 120
8 Construction of Reinforced Cement Concrete Flooring Construction of Reinforced Cement Concrete Flooring 2,100 sqft adjut_16rr 120
9 12 millimetre wooden tiles approved by user 800 sqft 12 millimetre wooden tiles approved by user 800 sqft 800 sqft adjut_16rr 120
10 Designing and Installation of Glass Doors and Windows Designing and Installation of Glass Doors and Windows 8 nos adjut_16rr 120
11 Installation of toughen glass door used in heavy duty aluminum frame having size of 4 X 8 feet Installation of toughen glass door used in heavy duty aluminum frame having size of 4 x 8 feet 2 nos adjut_16rr 120
12 Auto soft close machine system for all doors stainless steel handles will be placed Auto soft close machine system for all doors stainless steel handles will be placed 1 nos adjut_16rr 120
13 Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex Construction of Reinforced Cement Concrete Brick Wall for Entire Sports Complex 1 nos adjut_16rr 120
14 Installation of Qty 16 x 200 Watt non-masked led lights Installation of Qty 16 x 200 Watt non-masked led lights 16 nos adjut_16rr 120
15 Specifications of Synthetic Floor Mats for Badminton Courts are as Under Specifications of Synthetic Floor Mats for Badminton Courts are as Under 4 nos adjut_16rr 120
16 Quantity of net poles posts 04 Badminton World Federation Specification Quantity of net poles/ posts 04 Badminton World Federation Specification 2 nos adjut_16rr 120

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders