TenderDekho Logo
GEM

Uttar Pradesh Cooperative Sugar Factories Federation Limited Procurement Tender 2026 - 105 Items, EMD ₹1000, Estimated ₹1,948,803

Bid Publish Date

29-Jun-2026, 1:27 pm

Bid End Date

15-Jul-2026, 2:00 pm

EMD

₹1,000

Value

₹19,48,803

Progress

Issue29-Jun-2026, 1:27 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

858

Category

Erection and Fabrication Work C 1

Bid Type

Two Packet Bid

Categories 109

AGITATORS WORM PUMPS AIR WASHER WIND MILL ENERGY PROJECT WATER DISTRIBUTION SLUICE VALVE ANGLE AXLE ALTERNATOR MISCELLANEOUS VALVE SHAFT SUPPLY JAGGERY TUBE CONDENSER ANGLE GLOBE VALVES RING STRUCTURE FABRICATION COMPRESSOR AIR CYLINDERS PERISTALTIC PUMPS PLAY HOUSE TUBE AND FITTING DESERT COOLER BEARINGS MIXERS PARTS AND ACCESSORIES AIR BRAKE HEAT EXCHANGERS STEEL FURNITURE CHANNEL ARC VALVE BI DISTILLATION UNIT TICKETING MACHINE DISTILLATION BANANA FERROUS ALLOY SUPPLY FABRICATION WORK WATER COOLER ELBOW FLANGE HEATER MUSICAL INSTRUMENT PARTS AND ACCESSORIES VACUUM FILTERS MILITARY VEHICLE BED FIRE WATER LINE CRYSTALLIZERS PUMPS COOLER ALUMINIUM ALLOY BUS TERMINAL FLOATING JETTY CENTRIFUGAL MACHINE AIR COMPRESSOR FLUID MECHANICS EQUIPMENT VESSEL COMPRESSED AIR ALUMINIUM PROFILE ARMS PNEUMATIC MACHINERY ROTATING PISTON PUMPS PNEUMATIC VACUUM PNEUMATIC VALVES GATE VALVES VERTICAL COOLER TUBE LIGHT MICROSCOPES AIR INFLATORS BOX VALVE PNEUMATIC TOOLS SANITARY FITTING WATER SUPPLY MATERIAL GEAR SUGAR AIR GENERATOR FUME HOODS ERECTION OF STRUCTURAL RESISTANCE BOX WORM GEAR TURBINE PUMPS EXHAUST SYSTEM SLIDER VALVES PROGRESSIVE CAVITY PUMPS TRANSITION METALS BOILER MOUNTING VALVE STRAINER BIOLOGICAL BATH FABRICATOR WATER TRANSMISSION MACHINE AIR PREHEATER BASKET BEEKEEPING EQUIPMENT CHIMNEY MODBUS VALVE PARTS AND ACCESSORIES ESCRAP WORSHIP MATERIALS STRUCTURE BOILER VALVE HYDRAULIC PEB PIPES VALVE KITS DISTILLATION PLANT METAL PRODUCTS TEE BUSH SCREW COMPRESSORS MANUFACTURING SERVICES MERRY GO ROUND

Tender Overview

Uttar Pradesh Cooperative Sugar Factories Federation Limited seeks procurement under a 105-item BOQ with an estimated value of ₹1,948,803.00 and an EMD of ₹1,000.00. The project scope details are not itemized in the available data; however, the tender includes an option clause allowing quantity adjustments up to 25% during and after contract award. Location and start/end dates are not specified, but bidders should prepare for a multi-item supply and potential ramp-up in orders at contracted rates. AAT terms indicate adherence to the purchaser’s extension methodology, ensuring delivery timelines scale with quantity changes. The absence of explicit product specs requires bidders to anticipate generic procurement of supplies aligned to government-standard practices and the BOQ’s 105 line items. Unique aspects include the option clause and a flexible delivery window linked to the last delivery order date, with minimum extension time of 30 days. This tender is positioned as a government procurement opportunity via GEM under UP federation oversight.

Technical Specifications & Requirements

  • BOQ has 105 items; no itemwise specifications or units are provided in the data.
  • Estimated value: ₹1,948,803.00; EMD: ₹1,000.00.
  • Option clause permits ±25% quantity change at contract placement and during currency at contracted rates.
  • Delivery period logic ties to the last original delivery date and extended periods; minimum extension 30 days.
  • No explicit product names, standards, or certifications are detailed; bidders should assume standard government procurement compliance and await ATC/file specifics.
  • Attention to ATC document and Buyer Added Terms is essential for compliance.

Terms, Conditions & Eligibility

  • EMD: ₹1,000 (payment mode unspecified in data).
  • Quantity flexibility: ±25% of bid/contract quantity.
  • Delivery timeline: linked to last date of original delivery order; minimum 30 days extension.
  • Bidders must comply with option clause and prepare for extended delivery calculations.
  • No explicit payment terms or warranty conditions provided in the visible data; refer to ATC and tender terms for specifics.

Key Specifications

  • 105-item BOQ; exact items not disclosed

  • Estimated value ₹1,948,803.00

  • EMD ₹1,000.00

  • Option clause: ±25% quantity; extended delivery time formula

  • Delivery period calculated from last date of original delivery order

  • Minimum extension time: 30 days

  • No product standards or certifications specified in data

Terms & Conditions

  • EMD amount and submission mechanism required

  • Quantity adjustment up to 25% during contract

  • Delivery timeline linked to original order date with extensions

  • ATC and Buyer Added Terms govern compliance

  • No explicit product specs provided in current data

Important Clauses

Payment Terms

No explicit payment terms specified; refer to ATC for terms including milestones and invoicing.

Delivery Schedule

Delivery period begins from the last date of original delivery order; extended time follows the option clause with a minimum 30-day extension.

Penalties/Liquidated Damages

Not specified in data; ATC should be consulted for LD and performance penalty details.

Bidder Eligibility

  • Eligibility per GEM government procurement norms

  • Ability to supply 105-item BOQ with possible 25% quantity change

  • Compliance with ATC and Buyer Added Terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9518740.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for Fabrication and Erection Work in JALANDHAR, PUNJAB

N/A

JALANDHAR, PUNJAB

Posted: 20 May 2025
Closed: 26 May 2025
EPROCURE

Contract Bidding Open For FABRICATION AND ERECTION in JALANDHAR, PUNJAB

N/A

JALANDHAR, PUNJAB

Posted: 20 August 2025
Closed: 26 August 2025
EPROCURE

Contract Bidding Open For Fabrication and Erection Job in GURDASPUR, PUNJAB

N/A

GURDASPUR, PUNJAB

Posted: 3 September 2025
Closed: 8 September 2025
EPROCURE

Tender Notice for Fabrication and Erection Job in GURDASPUR, PUNJAB

N/A

GURDASPUR, PUNJAB

Posted: 10 July 2025
Closed: 21 July 2025
EPROCURE

Contract Bidding Open For FABRICATION AND ERECTION in UDAM SINGH NAGAR, UTTARAKHAND

GM (The Kisan Sahkari Chini Mills Ltd. Nadehi)

UDAM SINGH NAGAR, UTTARAKHAND

Posted: 20 June 2026
Closed: 26 June 2026
EPROCURE

Bill of Quantities (BOQ) 105 Items Sign in for GEM prices

#1

Erection and Fabrication Work C 1

Pan/quad bodies ki kamzor shell ko kaatkar hatana. 10/12 mm moti plate se taiyar kar yathasthan lagana. andar aur bahar se double coat welding kar leak/proof water/vacuum trial dena.

12 per ton Delivery: 90 days
#2

Erection and Fabrication Work C 2

Quad evam pan par lage vapour/steam line mein lage 600/1000 mm dia ke right/angle type vapour valves ko dismantle kar valve ki leak/proof marammat karna evam testing uparant punah yathasthan fit karna.

6 per nos Delivery: 90 days
#3

Erection and Fabrication Work C 3

Pan/quad ke vapour pipe ke gale/kamzor vapour pipe bends ko naye fabricate karke badalna 600 mm se 1100 mm dia.

8 per nos Delivery: 90 days
#4

Erection and Fabrication Work C 4

Quad evam pan ke vapour pipes. vapour/exhaust steam lines ko majbooti pradan karne ke liye angle iron athva plate se T/rings banakar support dena.

12 per ring Delivery: 90 days
#5

Erection and Fabrication Work C 5

Vapour cell. semi/kestner. pan va quad bodies ki purani gali steam jackets ko hatakar nikalna. 10/12 mm plate se naya banakar lagana tatha leak/proof trial dena.

20 per varg feet square foot Delivery: 90 days
#6

Erection and Fabrication Work C 6

Pan. quad. vapour shell adi ka fin type cyclone fit karna. naya 8/10 mm plate se banakar fit karna tatha welding kar santoshjanak trial dena.

2 per nos Delivery: 90 days
#7

Erection and Fabrication Work C 7

Quad/pans par sthapit vibhinn steam ke gale/kamzor/leaky valves ko kaatkar/kholkar hatana tatha valve ki vanchhit marammat uparant nirdeshanusar fit karna.

4 per nos Delivery: 90 days
#8

Erection and Fabrication Work C 8

Air cooled/dry seed/vacuum/twin vertical crystallizer ki drive ke kshatigrast/ghise hue worm wheels ki gland housings ke bush badalne ke liye worm wheel evam worm shaft housings ko dismantle kar alag karna. gland housings mein naye gun metal bush lag jane par housings ki fitting uparant uplabdh karaye gaye worm wheel evam worm housings ko poorv ki bhanti fit kar alignment karna.

2 per set Delivery: 90 days
#9

Erection and Fabrication Work C 9

Vacuum crystallizer ke shell ke gale/kamzor bhagon ko kaatkar hatana. nai/Purani plate se shell modkar yathasthan fit karna. andar aur bahar se leak/proof welding karna tatha bahar se vanchhit strengthening karna.

5 per ton Delivery: 90 days
#10

Erection and Fabrication Work C 10

Air/water cooled/vacuum/twin vertical crystallizer ke kshatigrast danton wale worm evam worm wheel ko dismantle kar hatana evam unke sthan par naye worm evam worm wheel fit karna. reduction gear evam motor fit karke alignment karna evam trial dena.

2 per set Delivery: 90 days
#11

Erection and Fabrication Work C 11

Pans/crystallizers par lage vibhinn gutters mein se kamzor gutters ko kaatkar hatana. purani plate se banakar lagana.

24 per varg meter Delivery: 90 days
#12

Erection and Fabrication Work C 12

Air/water cooled crystallizers ki purani/kamzor/tooti hui shaft ko dismantle karna. nai shaft taiyar kar yathasthan lagana evam samast arms lagakar santoshjanak trial dena.

3 per shaft Delivery: 90 days
#13

Erection and Fabrication Work C 13

Air/water cooled crystallizers ki shaft ke gale/kamzor bhag ko kaatkar hatana. M.S. plate se shaft taiyar kar naye pipe ki shaft yathasthan fit karna evam samast arms poorv ki bhanti lagakar santoshjanak trial dena.

4 per shaft Delivery: 90 days
#14

Erection and Fabrication Work C 14

Crystallizers ki drive shaft ke dono taraf dheele hue/ghise gun metal bush bearings ko nikalna. naye bush fit kar trial dena.

3 per nos Delivery: 90 days
#15

Erection and Fabrication Work C 15

Air/water cooled crystallizer ki shaft par lagi kamzor arms ko kaatkar hatana aur M.S. plate/pipe se nai arms fabricate karke shaft par lagakar sucharu trial dena.

24 per arm Delivery: 90 days
#16

Erection and Fabrication Work C 16

Air/water cooled crystallizer ke leaky/kamzor gate valve ko repair karke leak/proof fitting karna.

4 per nos Delivery: 90 days
#17

Erection and Fabrication Work C 17

Spray hetu sthapit MF 35x35 spray pumps ke elliptical suction pipes mein se gale/kamzor section pipes ko dismantle kar hatana. 8/10 mm moti M.S. plate se sample anusar may strainer fabricate kar yathasthan fit kar leak/proof trial dena.

2 per nos Delivery: 90 days
#18

Erection and Fabrication Work C 18

Quad/pans ke condenser mein lage multi/jet spray boxes ki vanchhit marammat karna.

6 per nos Delivery: 90 days
#19

Erection and Fabrication Work C 19

Spray pond ke main header. branch header evam branch lines ke gale/kamzor bhagon ko kaatkar nirdeshanusar nai evam purani plate se taiyar kar yathasthan fit kar leak/proof trial dena.

2 per ton Delivery: 90 days
#20

Erection and Fabrication Work C 20

Common injection header ke kamzor bhag ko kaatkar hatana. naya fabricate kar yathasthan erection kar leak/proof trial dena.

3 per ton Delivery: 90 days
#21

Erection and Fabrication Work C 21

Injection. spray pump ki drive motor ke gale/kamzor resistance box taiyar karna. sabhi internals fit karna. connection kar santoshjanak trial dena.

1 ek job lump sum Delivery: 90 days
#22

Erection and Fabrication Work C 22

Vertical spray pump ke gale/kamzor base frame ko dismantle karna. poorv ke anusar naya bed fabricate kar level karke yathasthan lagana evam pump fit kar alignment kar dena.

1 lump sum Delivery: 90 days
#23

Erection and Fabrication Work C 23

Pans ke gale/kamzor feed distribution headers ko kaatkar hatana tatha unke sthan par nirdeshanusar M.S. plate/pipe se header taiyar kar yathasthan fit kar samast connection poorv ki bhanti kar safal water trial dena.

6 per header Delivery: 90 days
#24

Erection and Fabrication Work C 24

Pan station par syrup/melt evam vibhinn molasses ke bhandaran ke liye bani tanks ki kamzor bottom/side plates ko kaatkar hatana evam nirdeshanusar nai/purani plates lagakar tanks ko taiyar kar samast connection poorv ki bhanti kar safal water trial dena.

40 per varg meter Delivery: 90 days
#25

Erection and Fabrication Work C 25

Pans ke vessels ki internal/bahya plates ki kamzor/gali plates ko badalkar vessels ki vanchhit marammat kar fit karna.

4 per nos Delivery: 90 days
#26

Erection and Fabrication Work C 26

Vacuum filter par sthapit gale/kamzor filtrate receiving tank ko kaatkar hatana tatha purane anusar naya banakar lagana aur safal leak/proof trial dena.

2 per ton Delivery: 90 days
#27

Erection and Fabrication Work C 27

Pans ke andar lagi distributor cones mein se gale/kamzor distributor cones ko hatana. 10 mm moti plate se naya cone banakar lagana.

5 per nos Delivery: 90 days
#28

Erection and Fabrication Work C 28

Pans ke bahar grain/massecuite ko gutter mein girane ke liye lage full cone mein se gale full cone ko naye se badalna.

6 per nos Delivery: 90 days
#29

Erection and Fabrication Work C 29

Pans ke gale/kamzor vessels ko kaatkar hatana. purane anusar naya banakar lagana evam leak/proof trial dena.

4 per nos Delivery: 90 days
#30

Erection and Fabrication Work C 30

Pans ke discharge valves ko dismantle kar vanchhit marammat karna evam fitting aur erection kar leak/proof trial dena.

4 per nos Delivery: 90 days
#31

Erection and Fabrication Work C 31

Sugar melter ke gale hue bottom cone ko kaatkar hatana tatha naya cone banakar yathasthan fit karna.

1 per nos Delivery: 90 days
#32

Erection and Fabrication Work C 32

Hoppers ki gali/kamzor trough ko 4.0/5.0 mm moti plate se badalna evam side mein angle aur support lagana.

90 per varg meter Delivery: 90 days
#33

Erection and Fabrication Work C 33

Centrifugal machines ke ghise/kamzor hood ko kaatkar hatana tatha 5/6 mm moti plate se poorv ke anusar taiyar kar yathasthan fit karna.

5 per nos Delivery: 90 days
#34

Erection and Fabrication Work C 34

Vibhinn sthan ki tanks jo gal gayi hain unhe dismantle karna tatha 6.0/8.0 mm moti nai/purani plate se purane anusar tank banana. yathasthan fit karna. poorv ki bhanti samast connection kar safal trial dena.

3 per ton Delivery: 90 days
#35

Erection and Fabrication Work C 35

Continuous centrifugal machines ke kamzor top cover ko hatakar sample anusar naye cover poorv ki bhanti taiyar kar safal trial dena.

5 per cover Delivery: 90 days
#36

Erection and Fabrication Work C 36

Continuous centrifugal machines ki monitor casings ke kamzor hisson ko kaatkar unke sthan par nai plate lagakar monitor casings ki vanchhit marammat karna.

6 per casing Delivery: 90 days
#37

Erection and Fabrication Work C 37

Sugar hopper ke gale/kamzor base channel ko kaatkar hatana tatha naya channel fit karke samast welding karya poorn kar santoshjanak trial dena.

2 lump sum Delivery: 90 days
#38

Erection and Fabrication Work C 38

Magma mixer ki gali hui shell ko kaatkar hatana tatha 6.0/8.0 mm moti M.S. plate se fabricate kar poorv ki bhanti shell/body lagana. andar aur bahar se welding karna.

3 per ton Delivery: 90 days
#39

Erection and Fabrication Work C 39

Centrifugal machines se nikalne wale molasses ke gale/kamzor gutters ko kaatkar hatana. nirdeshanusar nai/purani plate se gutter taiyar kar yathasthan fit kar leak/proof trial dena.

30 per varg meter Delivery: 90 days
#40

Erection and Fabrication Work C 40

Thande/garam pani ke overhead tanks ki gali/kamzor bottom/side plates ko kaatkar hatana tatha nirdeshanusar nai/purani plate se tank taiyar karna. avashyaktaanusar strengthening karna evam water filling test dena.

3 per ton Delivery: 90 days
#41

Erection and Fabrication Work C 41

B/C continuous centrifugal machines ki casing mein lage molasses drain pipes mein se gale/kamzor drain pipes ko kaatkar hatana evam purane anusar naye pipes lagakar leak/proof trial dena.

5 per machine Delivery: 90 days
#42

Erection and Fabrication Work C 42

A centrifugal machines mein massecuite lene ke liye pugmill gate valves ke neeche lage hanging chutes mein se kamzor chutes ko naye banakar badalna.

5 per nos Delivery: 90 days
#43

Erection and Fabrication Work C 43

Hopper No. 3/4 ki decking trough ki gali/kamzor top air plates ko nai se badalna.

2 lump sum Delivery: 90 days
#44

Erection and Fabrication Work C 44

Centrifugal A/B/C machines ke neeche lage gale/kamzor hanging chutes ko kaatkar hatana. sample anusar nai/purani plate se banakar lagana.

6 per nos Delivery: 90 days
#45

Erection and Fabrication Work C 45

Plant ke andar vibhinn sthanon par lage pipes ke kamzor headers ko badalne ke liye naye header poorv ke anusar banakar yathasthan fit karna tatha samast connection kar leak/proof trial dena.

15 per header Delivery: 90 days
#46

Erection and Fabrication Work C 46

Vibhinn vessels ki gali/kamzor juice/steam/gas coils ko kaatkar hatana. sample/nirdeshanusar coils fabricate kar yathasthan fit karna. poorv ki bhanti samast connection karna evam santoshjanak trial dena.

12 per inch dia feet lambai Delivery: 90 days
#47

Erection and Fabrication Work C 47

A/B/C machines ke pugmill/magma mixers ki purani tedhi shafts ko nikalna. kate bhagon ko welding kar machining karana. shafts ko seedha karna tatha poorv ki bhanti fit kar arms lagakar santoshjanak trial dena.

4 per shaft Delivery: 90 days
#48

Erection and Fabrication Work C 48

Air compressor hetu naye water cooler ko purane ke anusar fabricate kar fit karna.

2 per cooler Delivery: 90 days
#49

Erection and Fabrication Work C 49

Super heater wash water system ke heating vessel ki samast tubes ko nikalna. nai tube daalkar expand karna. hydraulic test dena evam yathasthan fit karna.

1 lumpsum Delivery: 90 days
#50

Erection and Fabrication Work C 50

Vividh golakar. ayatakaar. vargakaar. vapor pipe ityadi ki purani plate ko kaatkar seedha karna evam nirdeshit sthan par lagana evam samast welding karna.

2 per ton Delivery: 90 days
#51

Erection and Fabrication Work C 51

Continuous centrifugal machine ki casing mein lagi kamzor taper baffle plate ko kaatkar hatana va nai 5 mm plate se fabricate karke lagana.

4 per machine Delivery: 90 days
#52

Erection and Fabrication Work C 52

1/2Inch se 6Inch dia ki MS/SS pipe lines ki may bend. flange dismantling

12 pid per foot lambai Delivery: 90 days
#53

Erection and Fabrication Work C 53

a/ Flange. dismantling. fabrication evam erection.

16 pid per nag Delivery: 90 days
#54

Erection and Fabrication Work C 54

b/ Bend. dismantling. fabrication evam erection.

16 pid per nag Delivery: 90 days
#55

Erection and Fabrication Work C 55

c/ Nipple. dismantling. fabrication evam erection.

16 pid per nag Delivery: 90 days
#56

Erection and Fabrication Work C 56

d/ Cross. dismantling. fabrication evam erection.

16 pid per nag Delivery: 90 days
#57

Erection and Fabrication Work C 57

e/ Tee. dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#58

Erection and Fabrication Work C 58

f/ Blind. dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#59

Erection and Fabrication Work C 59

g/ Elbow. dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#60

Erection and Fabrication Work C 60

6Inch se 12Inch tak ke Bend S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#61

Erection and Fabrication Work C 61

6Inch se 12Inch tak ke Nipple S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#62

Erection and Fabrication Work C 62

6Inch se 12Inch tak ke Cross S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#63

Erection and Fabrication Work C 63

6Inch se 12Inch tak ke Tee S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#64

Erection and Fabrication Work C 64

6Inch se 12Inch tak ke Blind S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#65

Erection and Fabrication Work C 65

6Inch se 12Inch tak ke Reducer S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#66

Erection and Fabrication Work C 66

6Inch se 12Inch tak ke Elbow S.S. ke dismantling. fabrication evam erection.

12 pid per nag Delivery: 90 days
#67

Erection and Fabrication Work C 67

1/2Inch se 12Inch tak ke valves ka dismantling karna.

12 pid per nag Delivery: 90 days
#68

Erection and Fabrication Work C 68

1/2Inch se 12Inch tak ke valves ki fitting karna.

12 pid per nag Delivery: 90 days
#69

Erection and Fabrication Work C 69

12Inch dia se adhik dia ke valves ka dismantling.

8 pid per nag Delivery: 90 days
#70

Erection and Fabrication Work C 70

12Inch dia se adhik dia ke valves ki fitting.

8 pid per nag Delivery: 90 days
#71

Erection and Fabrication Work C 71

12Inch dia se adhik ke Nipple ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#72

Erection and Fabrication Work C 72

12Inch dia se adhik ke Bend ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#73

Erection and Fabrication Work C 73

12Inch dia se adhik ke Reducer ka dismantling. fabrication evam erection.

8 pid per nag Delivery: 90 days
#74

Erection and Fabrication Work C 74

12Inch dia se adhik ke Tee ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#75

Erection and Fabrication Work C 75

12Inch dia se adhik ke Blind ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#76

Erection and Fabrication Work C 76

12Inch dia se adhik ke Elbow ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#77

Erection and Fabrication Work C 77

12Inch dia se adhik ke Flange ka dismantling. fabrication evam erection.

10 pid per nag Delivery: 90 days
#78

Erection and Fabrication Work C 78

12Inch dia se adhik dia ke M.S. pipe may flange ka dismantling.

6 per ton Delivery: 90 days
#79

Erection and Fabrication Work C 79

12Inch dia se adhik dia ke M.S. pipe may flange ka fabrication evam erection.

6 per ton Delivery: 90 days
#80

Erection and Fabrication Work C 80

Purane platform ka dismantling karna.

3 per ton Delivery: 90 days
#81

Erection and Fabrication Work C 81

Purane platform ka fabrication evam erection karna.

3 per ton Delivery: 90 days
#82

Erection and Fabrication Work C 82

Heavy structure dismantling.

4 per ton Delivery: 90 days
#83

Erection and Fabrication Work C 83

Heavy structure fabrication aur erection.

4 per ton Delivery: 90 days
#84

Erection and Fabrication Work C 84

3 HP se 30 HP tak motor pump/reduction gear motor ke bedon ka fabrication aur erection sahit alignment.

10 per hp horse power Delivery: 90 days
#85

Erection and Fabrication Work C 85

30 HP se upar motor pump/reduction gear motor ke bedon ka fabrication aur erection sahit alignment.

10 per hp horse power Delivery: 90 days
#86

Erection and Fabrication Work C 86

Juice Clarifier ki gali chhat/side ko kaatkar hatana. nirdeshanusaar nai/purani plate se chhat bana kar leak proof jal bharav trial dena Dismantling.

2 per ton Delivery: 90 days
#87

Erection and Fabrication Work C 87

Juice Clarifier ki gali chhat/side ko kaatkar hatana. nirdeshanusaar nai/purani plate se chhat bana kar leak proof jal bharav trial dena Fabrication.

3 per ton Delivery: 90 days
#88

Erection and Fabrication Work C 88

Juice Clarifier ki gali chhat/side ko kaatkar hatana. nirdeshanusaar nai/purani plate se chhat bana kar leak proof jal bharav trial dena Erection.

3 per ton Delivery: 90 days
#89

Erection and Fabrication Work C 89

Mud Mixer ke gale/kamjor scroll/conveyor ko kaatkar hatana. sample anusaar naya fabricate kar erection karna evam trial dena.

1 ek nag Delivery: 90 days
#90

Erection and Fabrication Work C 90

Panon ke gale/kamjor down take ko kaatkar hatana tatha 8/10 mm plate se naya bana kar lagana tatha leak proof welding karna.

2 per nag Delivery: 90 days
#91

Erection and Fabrication Work C 91

Panon ke gale/kamjor juice distributor ko kaatkar hatana tatha sample anusaar 6/8 mm plate se naya bana kar lagana tatha santoshjanak welding karna.

2 per nag Delivery: 90 days
#92

Erection and Fabrication Work C 92

Panon ki kamjor shell ko badalne ke liye pehle se pan ke andar lagi support ko kaatkar hatana tatha nayi shell lagane ke baad punah nai/purani support ko lagakar welding karna.

1 per nag Delivery: 90 days
#93

Erection and Fabrication Work C 93

N.K. 1100/1300 ke C/F machine ke gale foundation channel jo gal gaye hain. unhe 250 mm channel se bana kar vapor line level karna.

2 per machine Delivery: 90 days
#94

Erection and Fabrication Work C 94

Crystallizers ke gale/kamjor oil guards ko kaatkar hatana. nai/purani plate se fabricate kar lagana.

6 per nag Delivery: 90 days
#95

Erection and Fabrication Work C 95

Centrifugal machines C/Type ke gale/kamjor sheere ke side cover ko kaatkar hatana. nai plate se sample anusaar taiyar kar purvavat fit karna evam sampoorn welding karna.

4 per nag Delivery: 90 days
#96

Erection and Fabrication Work C 96

Vertical injection pump ki N.R.V. sheet jo kat/gal gayi hai use nai plate se bana kar lagana evam iski rod ki setting kar lagana aur leak proof trial dena.

1 lumpsum Delivery: 90 days
#97

Erection and Fabrication Work C 97

Hopper No. 04 ki modification karke chute bana kar taiyar karna.

1 lumpsum Delivery: 90 days
#98

Erection and Fabrication Work C 98

Injection channel mein sthapit MS angle ki gali/kamjor jaliyon ko channel se nikalna aur nai MS channel va sariya se nai jali bana kar channel mein fit karna.

2 per nag Delivery: 90 days
#99

Erection and Fabrication Work C 99

Quad body ke kamjor taper ko kaatkar hatana. 12/16 mm moti MS plate se fabricate karna. sampoorn welding karke santoshjanak leak proof trial dena.

1 per body Delivery: 90 days
#100

Erection and Fabrication Work C 100

Quad/Vapor Cell/Panon ki calendria mein steam inlet par lagi gali/kamjor MS jali ko kaatkar hatana. 6/8 mm moti plate se jali taiyar kar lagana tatha sampoorn welding karna.

2 per body Delivery: 90 days
#101

Erection and Fabrication Work C 101

Quad Body/Vapor Cell ke gale/kamjor down/take pipe ko kaatkar hatana. nai 8/10 mm moti plate se pipe taiyar karke lagana tatha cone aur distributor sahit sabhi connection purvavat karke welding karna tatha leak proof trial dena.

1 per nag Delivery: 90 days
#102

Erection and Fabrication Work C 102

Pan ke kamjor save valve ki purani 12 mm plate se ring bana kar lagana evam top par plate kaatkar strengthening karna.

2 per nag Delivery: 90 days
#103

Erection and Fabrication Work C 103

Is mill samiti mein 45000 quintal ke teen sheera tank sthapit hain. In teeno sheera tank ki cooling coil 2 1/2 Inch ko kholkar neeche utaar kar saaf karna evam gali pipe line ko kaatkar nai coil banakar taiyar karna. Complete hone ke uparant un coils ko tank par fit karna tatha cooling hetu pump evam motor bed banakar tubewell ki line mein fit kar santoshjanak trial dena.

3 per nag Delivery: 90 days
#104

Erection and Fabrication Work C 104

Cane unloader par sthapit kate evam kharab hue rail ko kaatkar utaarna tatha mill samiti dwara uplabdh karaye gaye rail ko apne sansadhanon se chadhakar ukt sthan par weld kar safaltapoorvak trial dena.

40 per meter Delivery: 90 days
#105

Erection and Fabrication Work C 105

Is mill samiti mein sthapit 30 ton evam 20 ton ki chimney ke kuch shell gal gaye hain. Ukt gale/kate shell ko kaatkar apne sansadhanon se utaarna evam 10 se 12 mm plate se shell banakar apne sansadhanon se erection kar safaltapoorvak trial dena.

2 per shell chimney Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (similar procurement work)

4

Financial statements (audited, if available)

5

EMD submission proof (DD/online payment receipts)

6

Technical bid documents (compliance lists, declarations)

7

OEM authorizations (if applicable to items)

8

Any ATC/ATG compliance certificates attached in the buyer document

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for UP sugar federation procurement 2026 in GEM

Bidders should register on GEM, download ATC, and prepare 105-item BOQ submissions. Ensure EMD of ₹1,000 is paid online or via DD, and attach GST, PAN, experience certificates, financials, and OEM authorizations. Comply with the option clause for ±25% quantity adjustments and delivery extensions, then submit technical and financial bids by the stated, but not provided, deadline.

What documents are required for UP采购 tender 2026 in GEM

Required documents include GST registration, PAN, audited financial statements, experience certificates for similar procurements, EMD proof, technical bid documents,OEM authorizations, and ATC compliance. Ensure all documents are current and match the bidder profile; upload scans in the bid submission portal as per ATC guidance.

What are the delivery extension terms in UP sugar federation tender

The contract permits quantity increases up to 25% and additional delivery time calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days. If original period is under 30 days, extension equals the original period; extension may precede again within contracted rates.

What is the EMD amount for the UP procurement 2026

The EMD amount is ₹1,000. Submit via online payment or an approved demand draft, as specified in the ATC document. Ensure EMD accompanies the bid to avoid rejection; confirm payment mode in the bid submission portal.

Are item specifications available for the UP 105-item tender

Public data shows no explicit item-wise specifications; bidders should prepare to meet generic government procurement standards and await the ATC file for detailed product names, units, and quality requirements. Propose standard compliance and warranty expectations pending further specification release.

What standards or certifications are required for the UP bid

No specific standards are listed in the available data. Bidders should monitor the ATC for mandated certifications and align offerings with typical government procurement norms, including GST compliance, PAN validity, and OEM authorizations where applicable.

Similar Tenders

5 found
Urgent

Erection and Fabrication Work D 1,Erection and Fabrication Work D 2,Erection and Fabrication Work D

N/a

📍 MUZAFFARNAGAR, UTTAR PRADESH

Est: ₹3.1 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Erection and Fabrication Work B 1,Erection and Fabrication Work B 2,Erection and Fabrication Work B

N/a

📍 MUZAFFARNAGAR, UTTAR PRADESH

EMD: ₹96
Est: ₹17.4 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Uttar Pradesh Cooperative Sugar Factories Federation Limited Erection and Fabrication Works Tender 2026 - 66 Items, ₹1.66 Million, EMD ₹240

N/a

📍 MUZAFFARNAGAR, UTTAR PRADESH

EMD: ₹240
Est: ₹16.6 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

SUPPLY, ERECTION, INSTALLATION, COMMISSIONING AND OTHER WORKS WITH OPERATION AND MAINTENANCE OF MOR

N/a

📍 MUZAFFARNAGAR, UTTAR PRADESH

EMD: ₹2.9 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Mechanical Fabrication 1,Mechanical Fabrication 2,Mechanical Fabrication 3,Mechanical Fabrication 4

N/a

📍 BIJNOR, UTTAR PRADESH

EMD: ₹875
Est: ₹6.6 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM