TenderDekho Logo
Closed GEM

Government Tender Published for Suppy of complete CCTV system excluding Cameras,WP Fixed Perimeter 5MP IP Indoor outdoor Cameras,WP in DIBRUGARH, ASSAM

Bid Publish Date

31-Jul-2026, 12:52 pm

Bid End Date

25-Aug-2026, 3:00 pm

EMD

₹6,09,463

Progress

Issue31-Jul-2026, 12:52 pm
Corrigendum31-Jul-2026
AwardPending

A tender has been published for Assam Valley Fertilizer And Chemical Company Ltd Suppy of complete CCTV system excluding Cameras, WP Fixed Perimeter 5MP IP Indoor outdoor Cameras, WP PTZ 5MP IP Indoor outdoor Cameras, Erection Commissioning Testing Trial Run Inspection TPI charges Training Engineering Programming Documentation Transportation Licence any Civil work Handover and any other service for CCTV system, Mandatory Spares, Any other cost Hardware Software or Service which is not mentioned in tender document but required for completion of CCTV system in DIBRUGARH, ASSAM. Quantity: 64 by. Submission Deadline: 25-08-2026 15: 00: 00. Check eligibility and apply.

Authority & Contact

Tender Data

Bid Details

Quantity

64

Category

Suppy of complete CCTV system excluding Cameras

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

91

OEM Avg. Turnover

500

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Suppy of complete CCTV system excluding Cameras , WP Fixed Perimeter 5MP IP Indoor outdoor Cameras , WP PTZ 5MP IP Indoor outdoor Cameras , Erection Commissioning Testing Trial Run Inspection TPI charges Training Engineering Programming Documentation Transportation Licence any Civil work Handover and any other service for CCTV system , Mandatory Spares , Any other cost Hardware Software or Service which is not mentioned in tender document but required for completion of CCTV system

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

39

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Dibrugarh

Delivery Pincodes

786623

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sunil Singh Negi786623,AVFCCL Office, C/o BVFCL NamrupDibrugarhAssam786623160-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9689428.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Suppy of complete CCTV system excluding Cameras

Suppy of complete CCTV system excluding Cameras

1 lot Delivery: 60 days
#2

WP Fixed Perimeter 5MP IP Indoor outdoor Cameras

WP Fixed Perimeter 5MP IP Indoor outdoor Cameras

45 nos Delivery: 60 days
#3

WP PTZ 5MP IP Indoor outdoor Cameras

WP PTZ 5MP IP Indoor outdoor Cameras

15 nos Delivery: 60 days
#4

Erection Commissioning Testing Trial Run Inspection TPI charges Training Engineering Programming Documentation Transportation Licence any Civil work Handover and any other service for CCTV system

Erection Commissioning Testing Trial Run Inspection TPI charges Training Engineering Programming Documentation Transportation Licence any Civil work Handover and any other service for CCTV system

1 lot Delivery: 60 days
#5

Mandatory Spares

Mandatory Spares

1 lot Delivery: 60 days
#6

Any other cost Hardware Software or Service which is not mentioned in tender document but required for completion of CCTV system

Any other cost Hardware Software or Service which is not mentioned in tender document but required for completion of CCTV system

1 lot Delivery: 60 days

Categories 15

Corrigendum Updates

1 Update
#1

Update

31-Jul-2026

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer