Bid Publish Date
04-Jul-2026, 3:56 pm
Bid End Date
25-Jul-2026, 3:00 pm
Progress
Quantity
1
Bid Type
Two Packet Bid
Kiru Hep Cvpppl invites bids for the supply of an ATS Panel (Auto Transfer Switch Panel) intended for office facilities and field hostels at the Kiru HEP site (Pathernaki, District Kishtwar). The tender references a supply contract with an option to adjust quantities by up to 25%, and delivery/installation terms align with the original delivery period plus potential extension. A signed integrity pact is required, and bidders must upload relevant certificates as per the ATC. The BOQ lists no items, indicating a focused equipment procurement rather than a broad turnkey package. The opportunity targets vendors with practical ATS expertise and site installation capabilities in a hydro power context.
Product/service: ATS Panel (Auto Transfer Switch Panel) for hydro site power transfer
Quantity: Not specified in BOQ; indicative quantity may vary up to 25% during contract
Estimated value: Not disclosed
Delivery location: Kiru Site, Pathernaki, District Kishtwar
Standards/quality: ATC-compliant; certificate uploads required
Warranty/AMC: Not specified; confirm with bidder during bid clarification
25% quantity variation allowed during contract; adjust quantity at contracted rates
Mandatory integrity pact and certificate uploads; ATC compliance
Delivery/installation scope at Kiru Site; site-specific logistics must be prepared
Not specified in data; bidders should confirm payment terms during bid clarifications and per ATC.
Delivery period tied to the last date of original delivery order; extended time for option quantity as per formula.
Not specified; ensure to seek LD terms during bid submission or ATC.
Experience in supplying and installing ATS/Panel equipment for hydro/utility projects
Ability to deliver to remote site locations (Kishtwar region) and coordinate commissioning
Financial capacity to handle contract with potential 25% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Procurement of ATS Panel (Auto Transfer Switch Panel) for offices and field hostels at Kiru HEP site
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
15
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Kishtwar
Delivery Pincodes
182204
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Abrar Ahmad Mugal | 182204,Kiru HE Project, CVPPPL, Chenab Nagar-II, Kishtwar | Kishtwar | Jammu And Kashmir | 182204 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing ATS/Panel procurement experience
Financial statements or turnover evidence
EMD deposit details (if applicable) or exemption documentation
Technical bid documents and certificates
OEM authorization or authorized distributor letter (if applicable)
Scanned integrity pact signed per buyer policy
Bidders must submit GST registration, PAN, experience certificates for ATS/Panel projects, financial statements, EMD details (if applicable), technical bid, OEM authorizations, and a signed integrity pact. Ensure all certificates are uploaded with the bid as per ATC and Corrigendum.
The Purchaser may increase or decrease the bid quantity by up to 25%, both at contract placement and during the currency at contracted rates. Delivery timelines adapt with an adjusted schedule based on the original delivery period and the option clause.
Delivery/installation is specified for the Kiru Site, Pathernaki, District Kishtwar. Bidders should plan site access, local logistics, and commissioning requirements for hydro power site conditions.
Bidder must upload a scanned, signed integrity pact per the buyer’s policy and ensure compliance with all ATC terms. Certificates and documents must be uploaded with the bid, or the bid may be rejected.
While specific standards are not listed, bidders should expect ATC-compliance, electrical safety certifications, and OEM authorizations. Ensure your ATS panel meets local electrical codes and safety requirements for hydro installations.
Delivery period aligns with the original delivery order date; if an option quantity is exercised, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS