Central Railway Self-Contained Drinking Water Cooler Tender IS 1475 V3 2025 Rajasthan/India
Central Railway
THANE, MAHARASHTRA
Menu
Bid Publish Date
13-Dec-2025, 11:06 am
Bid End Date
23-Dec-2025, 12:00 pm
Location
Progress
Quantity
5
Bid Type
Single Packet Bid
The South East Central Railway (Indian Railways) procurement project targets Self-Contained Drinking Water Coolers (V3) meeting IS 1475 standards, located in Raipur, Chhattisgarh (492001). The scope covers Supply, Installation, Testing and Commissioning of the cooling units, with the option for quantity variation up to 25% at contracted rates. The contract emphasises post-acceptance inspection by the consignee, and delivery timelines are linked to the original delivery order, with potential extensions as per the option clause. No BOQ items are listed, indicating a potentially framework or multi-quantity purchase. The ATC terms and inspection modalities indicate a focus on OEM GC/TC compliance and pre/post-dispatch controls. This tender requires bidders to align with Indian Railways procurement standards and delivery coordination at the consignee site.
Self-Contained Drinking Water Cooler (V3) Microsoft IS 1475 compliance
Quantity/Scope: Supply, Installation, Testing and Commissioning
Inspection: Post-receipt by consignee; OEM GC & TC alignment
Delivery: As per original delivery period; extension clauses apply
Quality: OEM warranty and IS 1475 V3 compliance documentation
Option clause allows quantity variation up to 25% with revised delivery time
Delivery period linked to original order date; extensions require calculation
Post-receipt inspection at consignee site; pre-dispatch only if ATC selects
Not explicitly stated; bidders should anticipate Railways standard payment on acceptance or milestone-based terms per contract.
Delivery starts from last date of original delivery order; increased quantity delivery time = (Increased/Original) × Original period, minimum 30 days.
Not specified in data; expect standard Railways LD provisions in ATC and contract.
Experience in supplying/commissioning IS 1475 V3 compliant drinking water coolers
Turnover and financial stability aligned with project scale (Railways procurement norms)
Compliance with OEM authorizations and ISI/IS 1475 documentation
Central Railway
THANE, MAHARASHTRA
Madhya Pradesh State Agricultural Marketing Board (mpsamb) - Mandi Board
UJJAIN, MADHYA PRADESH
University Library Veer Narmad South Gujarat University
SURAT, GUJARAT
Lic - Life Insurance Corporation Of India
UDAIPUR, RAJASTHAN
Eastern Railway
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates for similar IS 1475 V3 drinking water cooler supply
Financial statements (last 2-3 years)
EMD/Security deposit documents as applicable
Technical bid documents demonstrating compliance with IS 1475 V3
OEM authorizations or dealership certificates
Manufacturing/installation capabilities and past project references
Key insights about CHHATTISGARH tender market
Bidders should submit GST, PAN, experience certificates, financial statements, EMD, technical bid and OEM authorizations. Provide IS 1475 V3 compliance proof, post-dispatch inspection readiness, and confirm supply, installation, testing and commissioning scope. Ensure delivery timelines align with original order dates and extension rules.
Required documents include GST registration, PAN, two to three years of financial statements, experience certificates for similar projects, OEM authorization, technical compliance certificates for IS 1475 V3, and EMD/safety deposit as applicable. Prepare soft and hard copies for submission.
Specifically, self-contained drinking water coolers must comply with IS 1475 V3 standard. Provide OEM GC/TC, installation-ready units, and performance data. The scope covers supply, installation, testing and commissioning; post-receipt inspection confirms conformity at consignee site.
Delivery period starts from the last date of the original delivery order. If the quantity increases by 25%, the new delivery time is (Increased/Original) × Original period, with a minimum of 30 days. Extensions may be allowed under the option clause.
Post-receipt inspection will be conducted at the consignee site by the nominated inspection authority or OEM-based verification. Pre-dispatch inspection may occur only if selected in ATC. Ensure GC/TC alignment and conformity with IS 1475 V3 prior to dispatch.
Explicit payment terms are not stated; bidders should be prepared for Railways’ standard payment on acceptance or milestone-based settlement as per contract, with reference to delivery acceptance and performance milestones included in the ATC.
The bid must cover Supply, Installation, Testing and Commissioning of Self-Contained Drinking Water Coolers (V3). The bid price should include all cost components, with delivery aligned to the original delivery period and compliant with IS 1475 V3.
Eligibility includes prior experience with IS 1475 V3 coolers, valid GST and PAN, financial capacity, OEM authorization, and the ability to meet post-dispatch inspection requirements. Bidders must comply with IS 1475 V3 and provide related certification and documentation.
Rural Development Department
📍 SAMASTIPUR, BIHAR
N/a
N/a
📍 AZAMGARH, UTTAR PRADESH
National Institute Of Technology (nit)
📍 JAIPUR, RAJASTHAN
N/a
📍 VADODARA, GUJARAT
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS