Progress
State Institute Of Rural Development (SIRD), Jharkhand, seeks procurement of Foam Mattress (V3), Wooden Bed with storage (V2), and Synthetic Pillows (PAC Only) for deployment in Ranchi, Jharkhand. The contract covers supply, installation, testing, and commissioning, with quantities and total estimated value undisclosed. Key differentiators include adherence to specified construction and material standards across mattress layers, densities, top cover fabrics, and full bed furniture packaging. The scope emphasizes advance samples, test reports from AHSP/NABL/ILAC-accredited labs, and mandatory OEM authorization where applicable. The buyer reserves option to adjust quantities by ±25% and requires BIS/IS-compliant, if stated, with a focus on certified performance and reliability.
Product categories: Foam Mattress (V3), Wooden Bed with Storage (V2), Pillows - Synthetic (PAC)
Thickness tolerances: Top/Core/Bottom layers ± 2 mm; Quilting thickness ± 2 mm
Dimensions tolerance: overall dimensions ± 15 mm
Layer material requirements: specify materials for Top, Core1, Core2, Bottom layers (exact polymers or foam grades to be provided in bid line items)
Densities: density values for Top, Core1, Core2, Bottom layers (numerical specs required)
Top design and Mattress Cover fabric composition to be detailed
Bed features: headboard/footboard presence; storage type; mattress support beams/materials
Warranty term: duration stated in months/years (exact value to be confirmed in bid)
Test reports: AHSP/NABL/ILAC accredited or Central Government Lab conformity proof
Advance Sample: supplier to provide advance samples for buyer approval before supply
Option clause allows ±25% quantity variation during contract; delivery schedule adjusts accordingly
Scope includes Supply, Installation, Testing and Commissioning; all costs must be in bid price
OEM authorization required for non-manufacturer bidders; distributor/agent must provide certificate
Turnover criteria apply to bidder and OEM; must be supported by audited statements or CA certificate
Delivery timeline tied to last delivery order date; extended period depends on option exercise
Test reports from designated labs are mandatory to prove conformity
Payment terms defined in buyer terms; exact percentages and milestones to be confirmed in bid document
Delivery period may extend based on option clause; delivery starts from last date of original delivery order
Penalties or LD terms to be specified in terms; ensure compliance with delivery deadlines and quality conformity
Bidder must demonstrate 3+ years of experience in supply/installation of similar office furniture or bedding
Minimum average annual turnover as indicated in bid document, supported by audited statements
OEM authorization required for non-manufacturers; distributors must provide valid authorization and contact details
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DHANBAD SALES Under PMA | Make : GODREJ INTERIO Model : GODREJ HERO SINGLE MATTRESS 4 INCH | 31-10-2025 16:40:10 | |
| 2 | HORIZON Under PMA | Make : GODREJ INTERIO Model : GODREJ HERO SINGLE MATTRESS 4 INCH | 31-10-2025 14:39:38 | |
| 3 | KOLKATA INTERIORS PRIVATE LIMITED Under PMA | Make : GODREJ INTERIO Model : GODREJ HERO SINGLE MATTRESS 4 INCH | 31-10-2025 12:14:10 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | KOLKATA INTERIORS PRIVATE LIMITED Under PMA | Item Categories : Foam Mattress (V3),Single / Double Wooden Bed with/without Storage (V2),Pillows - Synthetic | |
| L2 | HORIZON Under PMA | Item Categories : Foam Mattress (V3),Single / Double Wooden Bed with/without Storage (V2),Pillows - Synthetic | |
| L3 | DHANBAD SALES Under PMA | Item Categories : Foam Mattress (V3),Single / Double Wooden Bed with/without Storage (V2),Pillows - Synthetic |
Quantity
114
Category
Single / Double Wooden Bed with/without Storage (V2)
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
8
OEM Avg. Turnover
60
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Foam Mattress (V3) (Q3) ( PAC Only ) , Single / Double Wooden Bed with/without Storage (V2) (Q2) ( PAC Only ) , Pillows - Synthetic (Q3) ( PAC Only )
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
31-Oct-2025, 12:30 pm
Opening Date
31-Oct-2025, 1:00 pm
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover for last 3 years
Experience certificates on similar supply projects
EMD/Security deposit proof
Technical bid documents demonstrating compliance with specifications
OEM authorization / Manufacturer authorization certificate
Authorisation Form/Certificate for distributors (if applicable)
Test reports from AHSP/NABL/ILAC accredited labs or Central Government Lab (conformity proof)
Advance sample submission commitment (if requested)
| Category | Specification | Requirement |
|---|---|---|
| Construction | Number of Layers | Two Layers |
| Construction | Thickness of Top Layer (Tolerance :- ± 2 mm) | 50 mm |
| Construction | Thickness of Core Layer 1 (Tolerance :- ± 2 mm) | Not Applicable |
| Construction | Thickness of Core Layer 2 (Tolerance :- ± 2 mm) | Not Applicable |
| Construction | Thickness of Bottom Layer (Tolerance :- ± 2 mm) | 50 mm |
| Material | Material of Top Layer | PU Foam |
| Material | Material of Core Layer 1 | Not Applicable |
| Material | Material of Core Layer 2 | Not Applicable |
| Material | Material of Bottom Layer | PU Foam |
| Density | Top Layer Density | 28 kg/m³ |
| Density | Core Layer 1 Density | Not Applicable |
| Density | Core Layer 2 Density | Not Applicable |
| Density | Bottom Layer Density | 28 kg/m³ |
| Quilting Foam | Quilting | Both Side Quilting (Double Sided) |
| Quilting Foam | Thickness of Quilting (± 2 mm) | 8 mm |
| Top Design | Mattress Top | Box Top |
| Mattress Cover | Mattress Cover Fabric Composition | Polyester |
| Dimension | Dimensions (Tolerance ±15 mm) | 1829 mm x 914 mm |
| Warranty | Warranty (In Years) | 1, 2, 3, 4, 5 Or higher |
Key insights about JHARKHAND tender market
Bidders must submit GST, PAN, turnover proofs, and experience certificates; provide OEM authorization; include EMD/Security deposit; deliver advance sample for buyer approval; ensure conformity with AHSP/NABL/ILAC test reports and supply/install/commissioning scope.
Required documents include GST certificate, PAN, audited turnover for last 3 years, experience certificates for similar work, OEM authorization, EMD proof, technical bid, and test reports from AHSP/NABL/ILAC or Central Government Lab.
Specifications cover layer counts, ±2 mm thickness tolerances for top/core/bottom, densities per layer, quilting thickness ±2 mm, mattress cover fabric composition, and overall dimensions within ±15 mm, with test reports confirming conformity.
Advance samples must be provided before commencement of supply; they will be reviewed by the buyer for conformity to specified mattress and bed design, material, and finish; approval is a prerequisite for release of formal order.
Scope includes Supply, Installation, Testing and Commissioning of foam mattresses, wooden beds with storage, and synthetic pillows; all costs must be included in the bid price; option-based quantity adjustments up to 25% are allowed.
Yes. If bidding as an authorized distributor, provide OEM authorization certificate with full contact details and ensure compliance with the original manufacturer’s specifications and warranty terms.
Conformity proof must come from AHSP, NABL/ILAC accredited labs or Central Government Lab; test reports should verify material composition, densities, and overall mattress/bed performance in line with specification requirements.
Delivery begins after the last date of the original delivery order; quantity may be adjusted by ±25% during contract; additional time is calculated by (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.