Insulation Tester,Digital Multimeter,true rms clamp meter
Meja Urja Nigamplimited
ALLAHABAD, UTTAR PRADESH
Bid Publish Date
01-Apr-2026, 4:05 pm
Bid End Date
16-Apr-2026, 12:00 pm
Location
Progress
Quantity
3
Category
Insulation Tester
Bid Type
Two Packet Bid
Meja Urja Nigamplimited (MUNPL) invites bids for the supply of insulation testers, digital multimeters and true RMS clamp meters in Allahabad, Uttar Pradesh. The scope covers supply, installation, testing, commissioning, operator training and any required statutory clearances. The contract allows a quantity variation up to 25% during placement and across the contract period, calculated against the original delivery quantity with a minimum delivery extension of 30 days. Bidders must provide make and model details, GST rate and HSN code, and adhere to the listed ATC requirements. The package includes on-site installation for certain items and 2-year warranty support, with payments within 30 days after delivery and acceptance.
Product names: insulation tester, digital multimeter, true RMS clamp meter
Quantities: as per bid quantity with ±25% variation allowed
Warranty: minimum 2 years per instrument
Interchangeability/Fitment: mandatory binding condition
Installation: applicable only for item 10 as per ATC
Documentation: stamped technical specs, test certificates, routine/acceptance reports
Payment: 100% within 30 days after receipt, acceptance and installation at MUNPL site
Key Term 1: Option clause allows up to 25% quantity variation during contract
Key Term 2: 2-year minimum warranty per instrument; manufacturer warranty applies
Key Term 3: 100% payment within 30 days after installation/acceptance at MUNPL site
100% payment within 30 days after receipt, acceptance and installation at the MUNPL site (item 10 applicability).
Delivery period commences from the last date of the original delivery order; additional time calculated as (increased quantity / original quantity) × original delivery period, minimum 30 days.
Risk purchase rights reserved; supplier non-performance may lead to procurement from alternate sources at supplier's risk.
Provide make and model of offered products
Submit stamped technical specifications and required GST/HSN data
Demonstrate warranty terms (minimum 2 years) from manufacturer
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Insulation Tester (Q3) , Digital Multimeter (Q3) , true rms clamp meter (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Meja Urja Nigamplimited
ALLAHABAD, UTTAR PRADESH
Northern Coalfields Limited
SONBHADRA, UTTAR PRADESH
Central Mine Planning And Design Institute Limited
RANCHI, JHARKHAND
Northern Coalfields Limited
National Institute Of Technology (nit)
SOUTH GOA, GOA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate and PAN card
Make, model, and GST rate/HSN code confirmation
Stamped & signed technical specifications
OEM authorizations (if applicable)
Test Certificates, Routine and Acceptance Reports
Installation certificates and operator training documents
Evidence of warranty terms from manufacturer
Extended Deadline
16-Apr-2026, 12:00 pm
Opening Date
16-Apr-2026, 12:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must upload stamped technical specifications, provide make and model, declare GST rate/HSN code, and attach test certificates with the bid. Ensure warranty terms (minimum 2 years) and installation details for item 10. Comply with the 25% quantity variation option and submit all ATC-required documents.
Submit GST certificate, PAN, make/model confirmation, stamped technical specs, test certificates, routine/acceptance reports, OEM authorizations (if applicable), and evidence of warranty. Include installation details for item 10 and maintain compliance with interchangeability terms.
Each instrument must carry a minimum 2-year warranty from the manufacturer. The supplier’s warranty governs replacement/repair during the period, and any extended warranty terms should be clearly described in the bid. Ensure documentation supports warranty coverage for all three instrument categories.
Payment for item 10 installation is 100% within 30 days after receipt, acceptance and successful installation at the MUNPL site. Ensure installation completion certificates are provided as part of acceptance and that invoices reflect the post-installation verification.
The purchaser may increase or decrease the bid quantity up to 25% at contract placement and during the currency. Delivery extensions follow the proportional formula with a minimum 30 days; bidders should price potential variations and plan inventory accordingly.
Attach all relevant test certificates, routine and acceptance reports, stamped technical specifications, and ensure compliance with ATC requirements. The bid may be rejected if any required certificate or document is missing; GST/HSN details must be provided.
Installation is explicitly applicable to item 10 in the scope. Bidders should prepare installation procedures, operator training plans, and ensure on-site deployment meets MUNPL site conditions with acceptance testing documented.
Scope includes supply, installation, testing, commissioning of the meters and training of operators, plus statutory clearances if required. The bid must cover all cost components, with mandatory compliance to the specified terms and ATC stipulations.
Indian Air Force
📍 WEST DELHI, DELHI
Office Of Dg (ace)
📍 CHENNAI, TAMIL NADU
Uranium Corporation Of India Limited
📍 EAST SINGHBHUM, JHARKHAND
West Central Railway
📍 JABALPUR, MADHYA PRADESH
South Western Railway
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS