TenderDekho Logo
GEM

Meja Urja Nigamplimited Insulation Tester, Digital Multimeter & True RMS Clamp Meter Tender 2026 Allahabad Uttar Pradesh

Bid Publish Date

01-Apr-2026, 4:05 pm

Bid End Date

16-Apr-2026, 12:00 pm

Generate Docs

Progress

Issue01-Apr-2026, 4:05 pm
Corrigendum11-Apr-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3

Category

Insulation Tester

Bid Type

Two Packet Bid

Key Highlights

  • Critical brand/model disclosure requirement: bidders must provide exact make and model
  • GST rate and HSN code must be stated by bidders
  • Minimum warranty requirement: 2 years per instrument
  • Interchangeability/Fitment terms binding; no separate certificate required
  • Installation included only for item corresponding to installation (item 10)
  • Payment terms: 100% within 30 days post-installation for applicable items
  • Option clause enabling up to 25% quantity variation during and after contract
  • Must attach stamped technical specifications and all test/acceptance reports

Categories 17

Tender Overview

Meja Urja Nigamplimited (MUNPL) invites bids for the supply of insulation testers, digital multimeters and true RMS clamp meters in Allahabad, Uttar Pradesh. The scope covers supply, installation, testing, commissioning, operator training and any required statutory clearances. The contract allows a quantity variation up to 25% during placement and across the contract period, calculated against the original delivery quantity with a minimum delivery extension of 30 days. Bidders must provide make and model details, GST rate and HSN code, and adhere to the listed ATC requirements. The package includes on-site installation for certain items and 2-year warranty support, with payments within 30 days after delivery and acceptance.

Technical Specifications & Requirements

  • Items: Insulation tester, digital multimeter, true RMS clamp meter (Q3 category)
  • Documentation: Make and model, GST rate, HSN code; stamped technical specifications; test certificates; routine and acceptance reports
  • Warranty: Minimum 2 years per instrument; manufacturer’s warranty to apply
  • Installation: Applicable for item designated as installation-included (item no.10); training of operators included
  • Payment: 100% payment within 30 days after receipt, acceptance and installation at MUNPL site (for applicable item)
  • Compliance: Interchangeability/fitment terms bind supplier; no separate certificate required
  • Delivery/Options: Quantity may increase up to 25% of original bid quantity during contract; delivery period aligned to last delivery order date with minimum 30 days extension
  • Documentation: Ensure all required certificates and test reports are uploaded with bid
  • Risk: MUNPL may procure if supplier fails to supply acceptable quality (risk purchase) if timelines are not met

Terms, Conditions & Eligibility

  • Option Clause: Quantity may be increased up to 25% during contract; delivery timeline extended proportionally with a minimum of 30 days
  • Scope: Supply, installation, testing, commissioning, operator training and statutory clearances (if any)
  • Certificates: Bidders must upload all certificates/documents requested in the Bid Document and ATC/Corrigendum
  • Warranty: Minimum 2 years for each instrument; manufacturer’s warranty applies
  • Interchangeability/Fitment: Applicable to PO; no separate certificate required
  • Tests: Submit all relevant test certificates and routine/acceptance reports
  • Payment: 100% within 30 days after receipt, acceptance and installation at MUNPL site for applicable items
  • Installation: Applicable specifically to item 10
  • Risk Purchase: MUNPL reserves rights to procure from alternative sources if timely delivery fails

Key Specifications

  • Product names: insulation tester, digital multimeter, true RMS clamp meter

  • Quantities: as per bid quantity with ±25% variation allowed

  • Warranty: minimum 2 years per instrument

  • Interchangeability/Fitment: mandatory binding condition

  • Installation: applicable only for item 10 as per ATC

  • Documentation: stamped technical specs, test certificates, routine/acceptance reports

  • Payment: 100% within 30 days after receipt, acceptance and installation at MUNPL site

Terms & Conditions

  • Key Term 1: Option clause allows up to 25% quantity variation during contract

  • Key Term 2: 2-year minimum warranty per instrument; manufacturer warranty applies

  • Key Term 3: 100% payment within 30 days after installation/acceptance at MUNPL site

Important Clauses

Payment Terms

100% payment within 30 days after receipt, acceptance and installation at the MUNPL site (item 10 applicability).

Delivery Schedule

Delivery period commences from the last date of the original delivery order; additional time calculated as (increased quantity / original quantity) × original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Risk purchase rights reserved; supplier non-performance may lead to procurement from alternate sources at supplier's risk.

Bidder Eligibility

  • Provide make and model of offered products

  • Submit stamped technical specifications and required GST/HSN data

  • Demonstrate warranty terms (minimum 2 years) from manufacturer

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Insulation Tester (Q3) , Digital Multimeter (Q3) , true rms clamp meter (Q3)

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9180512.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Insulation Tester,Digital Multimeter,true rms clamp meter

Meja Urja Nigamplimited

ALLAHABAD, UTTAR PRADESH

Posted: 15 May 2026
Closed: 28 May 2026
GEM

Insulation Tester,Insulation Tester,Digital Multimeter,true rms clamp meter

Northern Coalfields Limited

SONBHADRA, UTTAR PRADESH

Posted: 18 November 2025
Closed: 28 November 2025
GEM

Insulation Tester,Insulation Tester,Digital Multimeter,true rms clamp meter

Central Mine Planning And Design Institute Limited

RANCHI, JHARKHAND

Posted: 6 October 2025
Closed: 28 October 2025
GEM

Insulation Tester,Insulation Tester,Digital Multimeter,true rms clamp meter,true rms clamp meter

Northern Coalfields Limited

Posted: 6 May 2025
Closed: 21 May 2025
GEM

Digital Earth Resistance Meter,Insulation Tester,Digital Multimeter,true rms clamp meter

National Institute Of Technology (nit)

SOUTH GOA, GOA

Posted: 8 April 2025
Closed: 26 May 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate and PAN card

2

Make, model, and GST rate/HSN code confirmation

3

Stamped & signed technical specifications

4

OEM authorizations (if applicable)

5

Test Certificates, Routine and Acceptance Reports

6

Installation certificates and operator training documents

7

Evidence of warranty terms from manufacturer

Corrigendum Updates

1 Update
#1

Update

11-Apr-2026

Extended Deadline

16-Apr-2026, 12:00 pm

Opening Date

16-Apr-2026, 12:30 pm

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for insulation tester tender in Allahabad Uttar Pradesh 2026?

Bidders must upload stamped technical specifications, provide make and model, declare GST rate/HSN code, and attach test certificates with the bid. Ensure warranty terms (minimum 2 years) and installation details for item 10. Comply with the 25% quantity variation option and submit all ATC-required documents.

What documents are required for Meja Urja Nigamplimited meter procurement in UP?

Submit GST certificate, PAN, make/model confirmation, stamped technical specs, test certificates, routine/acceptance reports, OEM authorizations (if applicable), and evidence of warranty. Include installation details for item 10 and maintain compliance with interchangeability terms.

What are the warranty requirements for the proposed meters in this tender?

Each instrument must carry a minimum 2-year warranty from the manufacturer. The supplier’s warranty governs replacement/repair during the period, and any extended warranty terms should be clearly described in the bid. Ensure documentation supports warranty coverage for all three instrument categories.

What is the payment term for item 10 installation at MUNPL site?

Payment for item 10 installation is 100% within 30 days after receipt, acceptance and successful installation at the MUNPL site. Ensure installation completion certificates are provided as part of acceptance and that invoices reflect the post-installation verification.

How does the 25% quantity variation clause affect bids in this tender?

The purchaser may increase or decrease the bid quantity up to 25% at contract placement and during the currency. Delivery extensions follow the proportional formula with a minimum 30 days; bidders should price potential variations and plan inventory accordingly.

What certifications and test reports must accompany the bid submission?

Attach all relevant test certificates, routine and acceptance reports, stamped technical specifications, and ensure compliance with ATC requirements. The bid may be rejected if any required certificate or document is missing; GST/HSN details must be provided.

Where can bidders find installation requirements for the meters in UP tender?

Installation is explicitly applicable to item 10 in the scope. Bidders should prepare installation procedures, operator training plans, and ensure on-site deployment meets MUNPL site conditions with acceptance testing documented.

What is the scope of supply for this Meja Urja Nigamplimited tender?

Scope includes supply, installation, testing, commissioning of the meters and training of operators, plus statutory clearances if required. The bid must cover all cost components, with mandatory compliance to the specified terms and ATC stipulations.

Similar Tenders

5 found
Urgent

true rms clamp meter,Insulation Tester,Insulation Tester

Indian Air Force

📍 WEST DELHI, DELHI

Est: ₹1.9 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Digital Multimeter,true rms clamp meter,Insulation Tester,Handheld Digital Infrared Thermometer

Office Of Dg (ace)

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

true rms clamp meter

Uranium Corporation Of India Limited

📍 EAST SINGHBHUM, JHARKHAND

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

true rms clamp meter

West Central Railway

📍 JABALPUR, MADHYA PRADESH

Est: ₹16,885.3
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

true rms clamp meter

South Western Railway

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM