TenderDekho Logo
GEM

Tender Notice for Transportation to and Fro Load Unload of DG,Repair Calibration of PUMP INJECTORS,Repair servicing o in EAST GODAVARI, ANDHRA PRADESH

Bid Publish Date

20-Nov-2025, 12:29 pm

Bid End Date

15-Dec-2025, 1:00 pm

EMD

₹20,000

Generate Docs

Progress

Issue20-Nov-2025, 12:29 pm
Corrigendum12-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

174

Category

Repair servicing of CHARGING ALTERNATOR SELF MOTOR

Bid Type

Two Packet Bid

Categories 92

Hindustan Petroleum Corporation Ltd has released a public tender for Transportation to and Fro Load Unload of DG, Repair Calibration of PUMP INJECTORS, Repair servicing of CHARGING ALTERNATOR SELF MOTOR, Charges for RADIATOR cleaning, Foundry charges towards SLEEVES cutting CONNECTING RODS testing CRANK SHAFT testing, Service charges towards TURBOCHARGER repair, Service charges towards ALTERNATOR repair, ENGINE OVERHAULING charges, Supply of 4 way selector switches of Powerol make, Supply of AUX contactors 12v DC and 230v AC, Supply of AMF controller GCU 105, Servicing of DG AMF Panel, Supply of HOSE BREATHER, Supply of PUMP OIL, Supply of CONNECTING ROD, Supply of HOSE RADIATOR, Supply of CLAMP HOSE, Supply of GASKET OIL FILTER, Supply of PISTON, Supply of WASHER SEALING, Supply of OIL SEAL REAR END CRNK AX1004715, Supply of SEAL OIL, Supply of FILTER OIL, Supply of HOSE Lube oil Hose, Supply of SENDER OIL PRESSURE, Supply of LINER CYLINDER, Supply of CLAMP HOSE lube oil Clamp, Supply of BEARING CONN ROD, Supply of SEPARATOR FUEL WATER, Supply of BEARING KIT CRANKSHAFT, Supply of GASKET WATER PUMP, Supply of GASKET ROCKER COVER, Supply of GASKET OIL BASE Suction, Supply of GASKET TURBOCHARGER, Supply of PUMP WATER, Supply of GUIDE VALVE, Supply of SEALANT LIQUID GASKET 72 GRAMS, Supply of SEAL VALVE STEM, Supply of GASKET INLET MANIFOLD, Supply of GASKET EXHAUST MANIFOLD, Supply of WASHER Exhaust Bolt, Supply of CLIP Exhaust Bolt, Supply of SENSOR TEMPERATURE, Supply of RING PISTON COMPRESSION, Supply of CLIP RETAINING, Supply of GEAR SPUR, Supply of SEAL O RING, Supply of GASKET, Supply of TUBE WATER, Supply of THERMOSTAT, Supply of GASKET thermostat, Supply of GASKET OIL BASE, Supply of SEAL RUBBER, Supply of GASKET lube oil inlet, Supply of CLAMP HOSE Lube oil Inlet, Supply of GASKET COVER Valve Cover, Supply of COLLET VALVE LOCK, Supply of SCREW HEX H D, Supply of GASKET FUEL PUMP, Supply of NUT Fuel Pump locknut, Supply of GASKET FLANGE Filter Flange, Supply of BOLT Oil Filter, Supply of HOSE WATER, Supply of WASHER VALVE SPRING, Supply of INHIBITOR CORROSION 10 LITERS, Supply of VALVE EXHAUST, Supply of VALVE INTAKE, Supply of SEAT EXHAUST VALVE, Supply of SEAT INTAKE VALVE, Supply of TURBOCHARGER, Supply of COIL ELECTRICAL, Supply of VALVOLINE PREMIUM BLUE 7800 PLUS 1 10 LTR in EAST GODAVARI, ANDHRA PRADESH. Quantity: 174. Submission Deadline: 15-12-2025 13: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Transportation to and Fro Load Unload of DG , Repair Calibration of PUMP INJECTORS , Repair servicing of CHARGING ALTERNATOR SELF MOTOR , Charges for RADIATOR cleaning , Foundry charges towards SLEEVES cutting CONNECTING RODS testing CRANK SHAFT testing , Service charges towards TURBOCHARGER repair , Service charges towards ALTERNATOR repair , ENGINE OVERHAULING charges , Supply of 4 way selector switches of Powerol make , Supply of AUX contactors 12v DC and 230v AC , Supply of AMF controller GCU 105 , Servicing of DG AMF Panel , Supply of HOSE BREATHER , Supply of PUMP OIL , Supply of CONNECTING ROD , Supply of HOSE RADIATOR , Supply of CLAMP HOSE , Supply of GASKET OIL FILTER , Supply of PISTON , Supply of WASHER SEALING , Supply of OIL SEAL REAR END CRNK AX1004715 , Supply of SEAL OIL , Supply of FILTER OIL , Supply of HOSE Lube oil Hose , Supply of SENDER OIL PRESSURE , Supply of LINER CYLINDER , Supply of CLAMP HOSE lube oil Clamp , Supply of BEARING CONN ROD , Supply of SEPARATOR FUEL WATER , Supply of BEARING KIT CRANKSHAFT , Supply of GASKET WATER PUMP , Supply of GASKET ROCKER COVER , Supply of GASKET OIL BASE Suction , Supply of GASKET TURBOCHARGER , Supply of PUMP WATER , Supply of GUIDE VALVE , Supply of SEALANT LIQUID GASKET 72 GRAMS , Supply of SEAL VALVE STEM , Supply of GASKET INLET MANIFOLD , Supply of GASKET EXHAUST MANIFOLD , Supply of WASHER Exhaust Bolt , Supply of CLIP Exhaust Bolt , Supply of SENSOR TEMPERATURE , Supply of RING PISTON COMPRESSION , Supply of CLIP RETAINING , Supply of GEAR SPUR , Supply of SEAL O RING , Supply of GASKET , Supply of TUBE WATER , Supply of THERMOSTAT , Supply of GASKET thermostat , Supply of GASKET OIL BASE , Supply of SEAL RUBBER , Supply of GASKET lube oil inlet , Supply of CLAMP HOSE Lube oil Inlet , Supply of GASKET COVER Valve Cover , Supply of COLLET VALVE LOCK , Supply of SCREW HEX H D , Supply of GASKET FUEL PUMP , Supply of NUT Fuel Pump locknut , Supply of GASKET FLANGE Filter Flange , Supply of BOLT Oil Filter , Supply of HOSE WATER , Supply of WASHER VALVE SPRING , Supply of INHIBITOR CORROSION 10 LITERS , Supply of VALVE EXHAUST , Supply of VALVE INTAKE , Supply of SEAT EXHAUST VALVE , Supply of SEAT INTAKE VALVE , Supply of TURBOCHARGER , Supply of COIL ELECTRICAL , Supply of VALVOLINE PREMIUM BLUE 7800 PLUS 1 10 LTR

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8611876.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 83 Items Sign in for GEM prices

#1

Transportation to and Fro Load Unload of DG

Transportation to and Fro Load Unload of DG

1 each Delivery: 84 days
#2

Repair Calibration of PUMP INJECTORS

Repair Calibration of PUMP INJECTORS

1 each Delivery: 84 days
#3

Repair servicing of CHARGING ALTERNATOR SELF MOTOR

Repair servicing of CHARGING ALTERNATOR SELF MOTOR

1 each Delivery: 84 days
#4

Charges for RADIATOR cleaning

Charges for RADIATOR cleaning

1 each Delivery: 84 days
#5

Foundry charges towards SLEEVES cutting CONNECTING RODS testing CRANK SHAFT testing

Foundry charges towards SLEEVES cutting CONNECTING RODS testing CRANK SHAFT testing

1 each Delivery: 84 days
#6

Service charges towards TURBOCHARGER repair

Service charges towards TURBOCHARGER repair

1 each Delivery: 84 days
#7

Service charges towards ALTERNATOR repair

Service charges towards ALTERNATOR repair

1 each Delivery: 84 days
#8

ENGINE OVERHAULING charges

ENGINE OVERHAULING charges

1 each Delivery: 84 days
#9

Supply of 4 way selector switches of Powerol make

Supply of 4 way selector switches of Powerol make

5 each Delivery: 84 days
#10

Supply of AUX contactors 12v DC and 230v AC

Supply of AUX contactors 12v DC and 230v AC

5 each Delivery: 84 days
#11

Supply of AMF controller GCU 105

Supply of AMF controller GCU 105

5 each Delivery: 84 days
#12

Servicing of DG AMF Panel

Servicing of DG AMF Panel

5 each Delivery: 84 days
#13

Supply of HOSE BREATHER

Supply of HOSE BREATHER

1 each Delivery: 84 days
#14

Supply of PUMP OIL

Supply of PUMP OIL

1 each Delivery: 84 days
#15

Supply of CONNECTING ROD

Supply of CONNECTING ROD

3 each Delivery: 84 days
#16

Supply of HOSE RADIATOR

Supply of HOSE RADIATOR

1 each Delivery: 84 days
#17

Supply of CLAMP HOSE

Supply of CLAMP HOSE

2 each Delivery: 84 days
#18

Supply of GASKET OIL FILTER

Supply of GASKET OIL FILTER

1 each Delivery: 84 days
#19

Supply of PISTON

Supply of PISTON

3 each Delivery: 84 days
#20

Supply of WASHER SEALING

Supply of WASHER SEALING

8 each Delivery: 84 days
#21

Supply of OIL SEAL REAR END CRNK AX1004715

Supply of OIL SEAL REAR END CRNK AX1004715

1 each Delivery: 84 days
#22

Supply of SEAL OIL

Supply of SEAL OIL

1 each Delivery: 84 days
#23

Supply of FILTER OIL

Supply of FILTER OIL

1 each Delivery: 84 days
#24

Supply of HOSE Lube oil Hose

Supply of HOSE Lube oil Hose

1 each Delivery: 84 days
#25

Supply of SENDER OIL PRESSURE

Supply of SENDER OIL PRESSURE

1 each Delivery: 84 days
#26

Supply of LINER CYLINDER

Supply of LINER CYLINDER

3 each Delivery: 84 days
#27

Supply of CLAMP HOSE lube oil Clamp

Supply of CLAMP HOSE lube oil Clamp

1 each Delivery: 84 days
#28

Supply of BEARING CONN ROD

Supply of BEARING CONN ROD

6 each Delivery: 84 days
#29

Supply of SEPARATOR FUEL WATER

Supply of SEPARATOR FUEL WATER

1 each Delivery: 84 days
#30

Supply of BEARING KIT CRANKSHAFT

Supply of BEARING KIT CRANKSHAFT

1 each Delivery: 84 days
#31

Supply of GASKET WATER PUMP

Supply of GASKET WATER PUMP

1 each Delivery: 84 days
#32

Supply of GASKET ROCKER COVER

Supply of GASKET ROCKER COVER

1 each Delivery: 84 days
#33

Supply of GASKET OIL BASE Suction

Supply of GASKET OIL BASE Suction

1 each Delivery: 84 days
#34

Supply of GASKET TURBOCHARGER

Supply of GASKET TURBOCHARGER

1 each Delivery: 84 days
#35

Supply of PUMP WATER

Supply of PUMP WATER

1 each Delivery: 84 days
#36

Supply of GUIDE VALVE

Supply of GUIDE VALVE

6 each Delivery: 84 days
#37

Supply of SEALANT LIQUID GASKET 72 GRAMS

Supply of SEALANT LIQUID GASKET 72 GRAMS

1 each Delivery: 84 days
#38

Supply of SEAL VALVE STEM

Supply of SEAL VALVE STEM

6 each Delivery: 84 days
#39

Supply of CLAMP HOSE

Supply of CLAMP HOSE

3 each Delivery: 84 days
#40

Supply of GASKET ROCKER COVER

Supply of GASKET ROCKER COVER

1 each Delivery: 84 days
#41

Supply of GASKET INLET MANIFOLD

Supply of GASKET INLET MANIFOLD

1 each Delivery: 84 days
#42

Supply of GASKET EXHAUST MANIFOLD

Supply of GASKET EXHAUST MANIFOLD

1 each Delivery: 84 days
#43

Supply of GASKET EXHAUST MANIFOLD

Supply of GASKET EXHAUST MANIFOLD

1 each Delivery: 84 days
#44

Supply of WASHER Exhaust Bolt

Supply of WASHER Exhaust Bolt

2 each Delivery: 84 days
#45

Supply of CLIP Exhaust Bolt

Supply of CLIP Exhaust Bolt

1 each Delivery: 84 days
#46

Supply of WASHER Exhaust Bolt

Supply of WASHER Exhaust Bolt

2 each Delivery: 84 days
#47

Supply of HOSE RADIATOR

Supply of HOSE RADIATOR

1 each Delivery: 84 days
#48

Supply of SENSOR TEMPERATURE

Supply of SENSOR TEMPERATURE

1 each Delivery: 84 days
#49

Supply of RING PISTON COMPRESSION

Supply of RING PISTON COMPRESSION

3 each Delivery: 84 days
#50

Supply of CLIP RETAINING

Supply of CLIP RETAINING

6 each Delivery: 84 days
#51

Supply of GASKET ROCKER COVER

Supply of GASKET ROCKER COVER

1 each Delivery: 84 days
#52

Supply of GEAR SPUR

Supply of GEAR SPUR

1 each Delivery: 84 days
#53

Supply of SEAL O RING

Supply of SEAL O RING

2 each Delivery: 84 days
#54

Supply of GASKET

Supply of GASKET

1 each Delivery: 84 days
#55

Supply of TUBE WATER

Supply of TUBE WATER

1 each Delivery: 84 days
#56

Supply of THERMOSTAT

Supply of THERMOSTAT

1 each Delivery: 84 days
#57

Supply of GASKET thermostat

Supply of GASKET thermostat

1 each Delivery: 84 days
#58

Supply of GASKET OIL BASE

Supply of GASKET OIL BASE

1 each Delivery: 84 days
#59

Supply of SEAL RUBBER

Supply of SEAL RUBBER

4 each Delivery: 84 days
#60

Supply of GASKET lube oil inlet

Supply of GASKET lube oil inlet

1 each Delivery: 84 days
#61

Supply of CLAMP HOSE Lube oil Inlet

Supply of CLAMP HOSE Lube oil Inlet

2 each Delivery: 84 days
#62

Supply of GASKET COVER Valve Cover

Supply of GASKET COVER Valve Cover

1 each Delivery: 84 days
#63

Supply of COLLET VALVE LOCK

Supply of COLLET VALVE LOCK

12 each Delivery: 84 days
#64

Supply of SEAL OIL

Supply of SEAL OIL

1 each Delivery: 84 days
#65

Supply of SCREW HEX H D

Supply of SCREW HEX H D

4 each Delivery: 84 days
#66

Supply of GASKET FUEL PUMP

Supply of GASKET FUEL PUMP

1 each Delivery: 84 days
#67

Supply of NUT Fuel Pump locknut

Supply of NUT Fuel Pump locknut

2 each Delivery: 84 days
#68

Supply of GASKET OIL FILTER

Supply of GASKET OIL FILTER

1 each Delivery: 84 days
#69

Supply of GASKET FLANGE Filter Flange

Supply of GASKET FLANGE Filter Flange

1 each Delivery: 84 days
#70

Supply of BOLT Oil Filter

Supply of BOLT Oil Filter

3 each Delivery: 84 days
#71

Supply of SEAL OIL

Supply of SEAL OIL

1 each Delivery: 84 days
#72

Supply of GASKET TURBOCHARGER

Supply of GASKET TURBOCHARGER

1 each Delivery: 84 days
#73

Supply of HOSE WATER

Supply of HOSE WATER

1 each Delivery: 84 days
#74

Supply of WASHER VALVE SPRING

Supply of WASHER VALVE SPRING

6 each Delivery: 84 days
#75

Supply of INHIBITOR CORROSION 10 LITERS

Supply of INHIBITOR CORROSION 10 LITERS

1 each Delivery: 84 days
#76

Supply of VALVE EXHAUST

Supply of VALVE EXHAUST

3 each Delivery: 84 days
#77

Supply of VALVE INTAKE

Supply of VALVE INTAKE

3 each Delivery: 84 days
#78

Supply of SEAT EXHAUST VALVE

Supply of SEAT EXHAUST VALVE

3 each Delivery: 84 days
#79

Supply of SEAT INTAKE VALVE

Supply of SEAT INTAKE VALVE

3 each Delivery: 84 days
#80

Supply of TURBOCHARGER

Supply of TURBOCHARGER

1 each Delivery: 84 days
#81

Supply of COIL ELECTRICAL

Supply of COIL ELECTRICAL

1 each Delivery: 84 days
#82

Supply of GASKET TURBOCHARGER

Supply of GASKET TURBOCHARGER

1 each Delivery: 84 days
#83

Supply of VALVOLINE PREMIUM BLUE 7800 PLUS 1 10 LTR

Supply of VALVOLINE PREMIUM BLUE 7800 PLUS 1 10 LTR

1 each Delivery: 84 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

12-Dec-2025

Extended Deadline

15-Dec-2025, 1:00 pm

Opening Date

15-Dec-2025, 1:30 pm

#2

Update

05-Dec-2025

Extended Deadline

12-Dec-2025, 1:00 pm

Opening Date

12-Dec-2025, 1:30 pm