Bid Publish Date
08-Oct-2026, 12:16 pm
Bid End Date
29-Oct-2026, 12:00 pm
Value
₹1,14,900
Location
Progress
Ai Engineering Services Limited invites bids for ISI marked safety footwear compliant with IS 15298 (Part 2), under a GeM procurement framework in India. Estimated value listed at ₹114,900.00 with no BOQ items provided. A mandatory sample pair must be approved by AIESL prior to bulk supply, and delivery must occur within 30 days of contract release. The order quantity may adjust up to ±25% during the contract period. This procurement emphasizes conformity to stated ISI standards and supplier accountability for sizing, replacements, and post-supply support.
Product: ISI marked safety footwear
Standard: IS 15298 (Part 2) compliant
Sample: 1 pair required for approval prior to bulk supply
Delivery: 30 days from contract release
Warranty/Replacement: free of cost for damaged/incorrect-size footwear
Documentation: GST, PAN, MSME (if applicable), Cancelled cheque
Quantity may vary by ±25% during contract; delivery timing follows proportionate extension rule
Mandatory sample approval before bulk supply; bulk items must match sample
Defective or incorrect-size footwear replaced at supplier’s expense, including transport
Complete quantity within 30 days from contract release; extended time may apply via option clause with minimum 30 days rules
One sample pair of safety shoes must be approved by AIESL before bulk supply
Damaged or incorrect-size footwear to be replaced free of cost, including transportation
Must supply ISI marked safety footwear compliant with IS 15298 (Part 2)
Submit GST, PAN, and MSME certificate (if applicable)
Provide sample approval and maintain quality conformance with tender conditions
Quantity
100
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Safety Footwear (V3) ISI marked to IS 15298 (Part 2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Thiruvananthapuram
Delivery Pincodes
695007
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kethavath Suvarchala Bai | 695007,AI Engineering Services Limited MRO , OPP KSEB , CHACKAI , Thiruvananthapuram (TRV), Kerala Pin Code 695007 Off: 0471-2787116 | Thiruvananthapuram | Kerala | 695007 | 100 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
PAN Card
MSME Certificate (if applicable)
Cancelled cheque
Technical bid document (duly filled and signed)
OEM authorization (if required by terms)
Any previous compliance certificates for IS 15298 (Part 2) safety footwear
Key insights about KERALA tender market
Bidders must submit the filled tender document, GSTIN, PAN, MSME (if applicable), and cancelled cheque. A single sample pair must be approved by AIESL before bulk supply, and the complete quantity is due within 30 days of contract release. Ensure ISI IS 15298 Part 2 compliance and GeM ATC adherence.
Required documents include GST registration, PAN card, MSME certificate (if applicable), cancelled cheque, and the technical bid with signatory. Also provide any OEM authorizations and evidence of ISI/IS 15298 compliance for safety footwear.
Delivery must be completed within 30 days from contract release. The policy allows a ±25% quantity variation during the contract, with delivery extensions calculated and subject to minimum 30 days increments.
Footwear must be ISI marked and conform to IS 15298 (Part 2). Ensure the sample footwear matches the approved design, and replacement footwear adheres to same IS 15298 specifications and testing requirements.
The purchaser may increase or decrease quantity by up to 25% of bid quantity at contract placement and during the currency, with the extended delivery period computed as (Additional quantity ÷ Original quantity) × Original days, minimum 30 days.
AIESL approves the one sample pair prior to bulk supply. Bulk orders must replicate the approved sample in fit, size range, and ISI 15298 (Part 2) compliance; deviations are not permitted without re-approval.
Any damaged or incorrect-size footwear must be replaced by the supplier at no cost, including transport and incidental charges; ensure prompt collection and redelivery of corrected items per order timelines.
Queries should be directed to [email protected] or phone +91-7593844826; refer to the GeM uploaded ATC for additional terms and conditions applicable to the bid.