Progress
Quantity
1
Bid Type
Single Packet Bid
Central Water Commission (cwc) invites bids for Turbidity meter (Q3) in SURAT, GUJARAT. Quantity: 1. Submission Deadline: 03-01-2025 11: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Turbidity meter (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
20-Jan-2025, 2:00 pm
Opening Date
20-Jan-2025, 2:30 pm
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | APLAB ENGICHEM PRIVATE LIMITED(MII) Under PMA | Item Categories : Turbidity meter | |
| L2 | LIBRA ENTERPRISES Under PMA | Item Categories : Turbidity meter |
Key insights about GUJARAT tender market
The eligibility requirements include being a registered entity, having at least 3 years of relevant experience, and demonstrating a minimum average annual turnover of 2 Lakh over the past three years.
Essential documentation includes:
To qualify for EMD exemption, bidders must provide valid supporting documents for the relevant category, particularly if classified under MSE.
The necessary technical specifications for the Turbidity Meter include features like a digital LCD display, portability, durability for at least 100,000 readings, and compliance with specified accuracy and standard regulations.
Yes, the Turbidity Meter must conform to standards from organizations such as CPCB, SPCB, CE, BIS, TUV, and NIST.
Bids will be evaluated based on total value and compliance with technical and operational specifications, alongside past performance metrics outlined in the tender.
The precise payment terms will be outlined in the final contract, but all bidders must quote prices that account for applicable GST as per their calculation.
Bidders must include a certificate from the OEM regarding local content and details of production locations to qualify for Preference to Make in India.
Bidders are allowed 2 days for technical clarifications during the evaluation phase, and should refer to the GeM portal for contact details.
Yes, start-ups can also be exempted from turnover requirements if they can meet the quality and technical standards laid out in the tender.
To comply, bidders must provide documentation proving adherence to local content requirements and submit localization certificates as determined by the specifications.
Bids must be submitted electronically through the GeM portal, ensuring all required documents are attached.
The performance security is noted as not required, but bidders should be prepared to meet any relevant documentation stipulations.
Notification of results will be communicated through the GeM portal, and all participating bidders will be informed of the outcome following the evaluation process.
This optimized content structure ensures clarity and easy navigation, providing essential information for potential bidders.
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS