TenderDekho Logo
GEM

Contract Bidding Open For Bearing,ChainCoupling,Axle,Check,Washer,Cylinder,Water,Assembly,Handle,Hack Saw,GI Pipe 10 Feet,Con in KHERI, UTTAR PRADESH

Bid Publish Date

07-Jul-2026, 1:42 pm

Bid End Date

22-Jul-2026, 2:00 pm

EMD

₹3,13,193

Value

₹62,63,864

Progress

Issue07-Jul-2026, 1:42 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

21030

Category

ChainCoupling

Bid Type

Two Packet Bid

N/a has released a public tender for Bearing, ChainCoupling, Axle, Check, Washer, Cylinder, Water, Assembly, Handle, Hack Saw, GI Pipe 10 Feet, Connection, Plate, GI, Nut Bolt 4 Soot, Nut Bolt 2 Soot, Pressure, Hexa Coupling, Upper, Plunger Rod, D Joint CI, DJoint CI, Ring, Rubber Ring, Nut-Bolt MS, Nut Bolt For Summer, Rubber Packing Summer Pipe, GREECE, Washer MS, Pipe PVC, Pipe UPVC, Pipe GI, Socket PVC, Socket GI, Socket Upvc, Elbow PVC, Elbow GI, Elbow uPVC, Tee PVC, TEE GI, Tee uPVC, Reducer Socket PVC, Reducer Socket GI, Reducer Socket Upvc, Reducer Tee PVC, Reducer Tee GI, Reducer Tee uPVC, Cap PVC, Plug GI, Cap uPVC, Gate Valve CI, Gate Valve Brass, Ball Valve uPVC, Valve, Cock PVC, PVC, Lead Pipe PVC, Waste Pipe, Elbow Brass, Brass Socket FTA, Ferrule Brass FTA, Brass Socket MTA, Jali PVC For Wash Basin, Union Socket cPVC, Union Socket GI, Ferrule Brass, M-Seal, Solvant uPVC, Hook, HOOK, HOOKS, 1. 25 INCH, Hook MS, Silk Tube, Nipple GI in KHERI, UTTAR PRADESH. Quantity: 21030. Submission Deadline: 22-07-2026 14: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bearing , ChainCoupling , Axle , Check , Washer , Cylinder , Water , Assembly , Handle , Hack Saw , GI Pipe 10 Feet , Connection , Plate , GI , Nut Bolt 4 Soot , Nut Bolt 2 Soot , Pressure , Hexa Coupling , Upper , Plunger Rod , D Joint CI , DJoint CI , Ring , Rubber Ring , Nut-Bolt MS , Nut Bolt For Summer , Rubber Packing Summer Pipe , GREECE , Washer MS , Pipe PVC , Pipe UPVC , Pipe GI , Socket PVC , Socket GI , Socket Upvc , Elbow PVC , Elbow GI , Elbow uPVC , Tee PVC , TEE GI , Tee uPVC , Reducer Socket PVC , Reducer Socket GI , Reducer Socket Upvc , Reducer Tee PVC , Reducer Tee GI , Reducer Tee uPVC , Cap PVC , Plug GI , Cap uPVC , Gate Valve CI , Gate Valve Brass , Ball Valve uPVC , Valve , Cock PVC , PVC , Lead Pipe PVC , Waste Pipe , Elbow Brass , Brass Socket FTA , Ferrule Brass FTA , Brass Socket MTA , Jali PVC For Wash Basin , Union Socket cPVC , Union Socket GI , Ferrule Brass , M-Seal , Solvant uPVC , Hook , HOOK , HOOKS , 1.25 INCH , Hook MS , Silk Tube , Nipple GI

Authority Records

URBAN DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9560496.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Sluice valve,Sluice valve,Reflex valve,Sluice valve,Sluice valve,Delivery Valve,BRASS GOOLI VALVE,C

N/a

KHERI, UTTAR PRADESH

Posted: 17 December 2025
Closed: 1 January 2026
GEM

BOLT,SOOT VASHER,ANGEL VALVA PVC,BALVE FOR TROOLY TANKER,BALVE FOR TROOLY TANKKER,BALVE FOR TROOLY

N/a

KHERI, UTTAR PRADESH

Posted: 6 May 2025
Closed: 30 May 2025
GEM

PIPE GI,METAL SARIA,SOCKET,FLANGE SET,CYLINDER,ADJUSTING ROD,TAPLON,WASHER SET,CHAIN SET,BEARING SE

N/a

JAUNPUR, UTTAR PRADESH

Posted: 10 October 2025
Closed: 25 October 2025
GEM

GI PIPE,GI PIPE,s GI Elbow,GI Socket,GI Nipple,GI Nipple,GI Nipple,GI Union,GI TEE,CI Tap,Ferrule,P

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

KHERI, UTTAR PRADESH

Posted: 10 March 2026
Closed: 25 March 2026
GEM

Assam Rifles PVC & GI Plumbing Fittings Tender Central Armed Police Forces Assam 2025

Assam Rifles

THOUBAL, MANIPUR

Posted: 4 November 2025
Closed: 25 November 2025
GEM

Bill of Quantities (BOQ) 199 Items Sign in for GEM prices

#1

Bearing

Bearing No 6204

150 pieces Delivery: 45 days
#2

ChainCoupling

Chain With Coupling

130 pieces Delivery: 45 days
#3

Axle

Axlel

130 pieces Delivery: 45 days
#4

Check

Check Valve

200 pieces Delivery: 45 days
#5

Washer

Washer Set

200 pieces Delivery: 45 days
#6

Cylinder

Cylinders

50 pieces Delivery: 45 days
#7

Water

Water Tank

10 pieces Delivery: 45 days
#8

Assembly

Assembly Body

10 pieces Delivery: 45 days
#9

Handle

Handle Bar

10 pieces Delivery: 45 days
#10

Hack Saw

Hack Saw Blade

50 pieces Delivery: 45 days
#11

GI Pipe 10 Feet

GI Pipe 10 Feet

80 pieces Delivery: 45 days
#12

Connection

Connection Rod 10 F

100 pieces Delivery: 45 days
#13

Plate

Three Plate

10 pieces Delivery: 45 days
#14

GI

GI Socket

500 pieces Delivery: 45 days
#15

Nut Bolt 4 Soot

Nut Bolt 4 Soot

1,000 pieces Delivery: 45 days
#16

Nut Bolt 2 Soot

Nut Bolt 2 Soot

1,000 pieces Delivery: 45 days
#17

Pressure

Pressure Plate

10 pieces Delivery: 45 days
#18

Hexa Coupling

Hexa CoupLING

100 pieces Delivery: 45 days
#19

Upper

Upper Valve

50 pieces Delivery: 45 days
#20

Plunger Rod

Plunger Rod

50 pieces Delivery: 45 days
#21

D Joint CI

3 INCH

100 pieces Delivery: 45 days
#22

D Joint CI

4 INCH

100 pieces Delivery: 45 days
#23

D Joint CI

6 INCH

50 pieces Delivery: 45 days
#24

DJoint CI

12 INCH

15 pieces Delivery: 45 days
#25

D Joint CI

14 INCH

15 pieces Delivery: 45 days
#26

D Joint CI

3INCH

100 pieces Delivery: 45 days
#27

Ring

3 INCH

250 pieces Delivery: 45 days
#28

Ring

4 INCH

250 pieces Delivery: 45 days
#29

Ring

6 INCH

150 pieces Delivery: 45 days
#30

Rubber Ring

12 INCH

30 pieces Delivery: 45 days
#31

Rubber Ring

14 INCH

30 pieces Delivery: 45 days
#32

Nut-Bolt MS

3 Soot 4

100 pieces Delivery: 45 days
#33

Nut-Bolt MS

4 Soot 4

100 pieces Delivery: 45 days
#34

Nut-Bolt MS

4 Soot 6 With Nut

100 pieces Delivery: 45 days
#35

Nut-Bolt MS

5 Soot 4

100 pieces Delivery: 45 days
#36

Nut-Bolt MS

2.5 Soot 3

50 pieces Delivery: 45 days
#37

Nut-Bolt MS

4 Soot 2.5

50 pieces Delivery: 45 days
#38

Nut Bolt For Summer

3.5 Soot 1.5

800 pieces Delivery: 45 days
#39

Nut Bolt For Summer

4 Soot 2.0

300 pieces Delivery: 45 days
#40

Nut Bolt For Summer

5 Soot 3

50 pieces Delivery: 45 days
#41

Rubber Packing Summer Pipe

3

200 pieces Delivery: 45 days
#42

Rubber Packing Summer Pipe

6

100 pieces Delivery: 45 days
#43

GREECE

Greece 1 Kg Pack

50 pieces Delivery: 45 days
#44

Washer MS

3 Soot

200 pieces Delivery: 45 days
#45

Washer MS

4 Soot

300 pieces Delivery: 45 days
#46

Washer MS

2.5 Soot

100 pieces Delivery: 45 days
#47

Washer MS

3 Soot

220 pieces Delivery: 45 days
#48

Pipe PVC

3INCH 20 Foot

50 pieces Delivery: 45 days
#49

Pipe PVC

4INCH 20 Foot

30 pieces Delivery: 45 days
#50

Pipe PVC

6 INCH 20 Foot

10 pieces Delivery: 45 days
#51

Pipe UPVC

1/2INCH

300 pieces Delivery: 45 days
#52

Pipe UPVC

3/4INCH

200 pieces Delivery: 45 days
#53

Pipe UPVC

1INCH

300 pieces Delivery: 45 days
#54

Pipe UPVC

1.25 INCH

20 pieces Delivery: 45 days
#55

Pipe GI

Pipe GI 1.25

50 pieces Delivery: 45 days
#56

Socket PVC

2

50 pieces Delivery: 45 days
#57

Socket PVC

2.5

50 pieces Delivery: 45 days
#58

Socket PVC

3 INCH

250 pieces Delivery: 45 days
#59

Socket PVC

4

250 pieces Delivery: 45 days
#60

Socket PVC

6

50 pieces Delivery: 45 days
#61

Socket GI

1.25

50 pieces Delivery: 45 days
#62

Socket GI

1

20 pieces Delivery: 45 days
#63

Socket GI

1/2 INCH

50 pieces Delivery: 45 days
#64

Socket Upvc

1/2 INCH

100 pieces Delivery: 45 days
#65

Socket Upvc

3/4 INCH

100 pieces Delivery: 45 days
#66

Socket Upvc

1 INCH

200 pieces Delivery: 45 days
#67

Socket Upvc

1.25 INCH

50 pieces Delivery: 45 days
#68

Elbow PVC

2 INCH

25 pieces Delivery: 45 days
#69

Elbow PVC

2.5 INCH

25 pieces Delivery: 45 days
#70

Elbow PVC

3 INCH

200 pieces Delivery: 45 days
#71

Elbow PVC

4 INCH

200 pieces Delivery: 45 days
#72

Elbow PVC

6 INCH

50 pieces Delivery: 45 days
#73

Elbow GI

1/2 INCH

100 pieces Delivery: 45 days
#74

Elbow GI

3/4 INCH

50 pieces Delivery: 45 days
#75

Elbow GI

1 INCH

50 pieces Delivery: 45 days
#76

Elbow GI

1.25 INCH

100 pieces Delivery: 45 days
#77

Elbow uPVC

1/2 INCH

300 pieces Delivery: 45 days
#78

Elbow uPVC

3/4 INCH

120 pieces Delivery: 45 days
#79

Elbow uPVC

1 INCH

300 pieces Delivery: 45 days
#80

Elbow uPVC

1.25 INCH

100 pieces Delivery: 45 days
#81

Tee PVC

3 INCH

150 pieces Delivery: 45 days
#82

Tee PVC

4 INCH

120 pieces Delivery: 45 days
#83

Tee PVC

6 INCH

40 pieces Delivery: 45 days
#84

TEE GI

1/2 INCH

300 pieces Delivery: 45 days
#85

TEE GI

3/4 INCH

50 pieces Delivery: 45 days
#86

TEE GI

1 INCH

100 pieces Delivery: 45 days
#87

TEE GI

1.25 INCH

100 pieces Delivery: 45 days
#88

Tee uPVC

1/2 INCH

300 pieces Delivery: 45 days
#89

Tee uPVC

3/4 INCH

50 pieces Delivery: 45 days
#90

Tee uPVC

1INCH

100 pieces Delivery: 45 days
#91

Tee uPVC

1.25 INCH

50 pieces Delivery: 45 days
#92

Reducer Socket PVC

2.5 INCH x 3 INCH

50 pieces Delivery: 45 days
#93

Reducer Socket PVC

2.15 INCHx 4 INCH

50 pieces Delivery: 45 days
#94

Reducer Socket PVC

2 INCH x 3 INCH

50 pieces Delivery: 45 days
#95

Reducer Socket PVC

2 INCH x 4 INCH

50 pieces Delivery: 45 days
#96

Reducer Socket PVC

3 INCHx 4 INCH

50 pieces Delivery: 45 days
#97

Reducer Socket PVC

3 INCH x 6 INCH

20 pieces Delivery: 45 days
#98

Reducer Socket PVC

4 INCH x 6 INCH

20 pieces Delivery: 45 days
#99

Reducer Socket PVC

2 INCH x 2.5 INCH

20 pieces Delivery: 45 days
#100

Reducer Socket PVC

1.25 INCH x 3 INCH

50 pieces Delivery: 45 days
#101

Reducer Socket PVC

1.25 INCH x 4 INCH

50 pieces Delivery: 45 days
#102

Reducer Socket PVC

1/2INCH x 1 INCH

50 pieces Delivery: 45 days
#103

Reducer Socket GI

1/2 INCH x 3/4 INCH

50 pieces Delivery: 45 days
#104

Reducer Socket GI

1/2 x 1.25 INCH

20 pieces Delivery: 45 days
#105

Reducer Socket GI

1/2INCH x 3/4INCH

100 pieces Delivery: 45 days
#106

Reducer Socket Upvc

1/2INCH x 1INCH

100 pieces Delivery: 45 days
#107

Reducer Socket Upvc

1/2INCH x 1.25INCH

100 pieces Delivery: 45 days
#108

Reducer Socket Upvc

3/4INCH x 1INCH

50 pieces Delivery: 45 days
#109

Reducer Socket Upvc

3/4INCH x 1.25INCH

50 pieces Delivery: 45 days
#110

Reducer Socket Upvc

1INCH x 1.25INCH

50 pieces Delivery: 45 days
#111

Reducer Tee PVC

3INCH x 2INCH x 3INCH

20 pieces Delivery: 45 days
#112

Reducer Tee PVC

3INCH x 2.5INCH x 3INCH

20 pieces Delivery: 45 days
#113

Reducer Tee PVC

4INCH x 3INCH x 4INCH

30 pieces Delivery: 45 days
#114

Reducer Tee PVC

6INCH x 3INCH x 6INCH

10 pieces Delivery: 45 days
#115

Reducer Tee PVC

6 INCH x 4INCH x 6 INCH

10 pieces Delivery: 45 days
#116

Reducer Tee GI

1INCH x 1/2INCH x 1INCH

50 pieces Delivery: 45 days
#117

Reducer Tee GI

3/4INCHx 1/2INCH x 3/4 INCH

50 pieces Delivery: 45 days
#118

Reducer Tee GI

1INCHx 3/4INCH x 1INCH

50 pieces Delivery: 45 days
#119

Reducer Tee GI

1.25INCH x 1/2 INCH x 1.25 INCH

20 pieces Delivery: 45 days
#120

Reducer Tee GI

1.25INCH x 1INCH x 1.25 INCH

20 pieces Delivery: 45 days
#121

Reducer Tee GI

1/2INCH x 3/4 INCH x 1/2 INCH

50 pieces Delivery: 45 days
#122

Reducer Tee uPVC

1/2INCH x 1INCH x 1/2INCH

50 pieces Delivery: 45 days
#123

Reducer Tee uPVC

1 INCH x 1/2INCH x 1 INCH

50 pieces Delivery: 45 days
#124

Reducer Tee uPVC

1 INCH x 3/4 INCH x 1 INCH

50 pieces Delivery: 45 days
#125

Reducer Tee uPVC

3/4INCH x 1/2 INCH x 3/4 INCH

20 pieces Delivery: 45 days
#126

Cap PVC

2 INCH

50 pieces Delivery: 45 days
#127

Cap PVC

2.5 INCH

50 pieces Delivery: 45 days
#128

Cap PVC

3 INCH

80 pieces Delivery: 45 days
#129

Cap PVC

4 INCH

80 pieces Delivery: 45 days
#130

Cap PVC

6 INCH

40 pieces Delivery: 45 days
#131

Cap PVC

1.25 INCH

20 pieces Delivery: 45 days
#132

Plug GI

HALF INCH

200 pieces Delivery: 45 days
#133

Plug GI

SAWA INCH

50 pieces Delivery: 45 days
#134

Plug GI

1 INCH

100 pieces Delivery: 45 days
#135

Plug GI

1.25 INCH

100 pieces Delivery: 45 days
#136

Cap uPVC

HALF INCH

100 pieces Delivery: 45 days
#137

Cap uPVC

3-4 INCH

50 pieces Delivery: 45 days
#138

Cap uPVC

1

100 pieces Delivery: 45 days
#139

Cap uPVC

1.25

50 pieces Delivery: 45 days
#140

Gate Valve CI

1.5

50 pieces Delivery: 45 days
#141

Gate Valve CI

1.25

20 pieces Delivery: 45 days
#142

Gate Valve CI

2 INCH

20 pieces Delivery: 45 days
#143

Gate Valve CI

3 INCH

20 pieces Delivery: 45 days
#144

Gate Valve CI

4 INCH

30 pieces Delivery: 45 days
#145

Gate Valve CI

6 INCH

10 pieces Delivery: 45 days
#146

Gate Valve Brass

HALF INCH

80 pieces Delivery: 45 days
#147

Gate Valve Brass

3Y4 INCH

20 pieces Delivery: 45 days
#148

Gate Valve Brass

1 INCH

50 pieces Delivery: 45 days
#149

Gate Valve Brass

1.25 INCH

30 pieces Delivery: 45 days
#150

Ball Valve uPVC

HALF INCH

200 pieces Delivery: 45 days
#151

Ball Valve uPVC

3Y 4 INCH

50 pieces Delivery: 45 days
#152

Ball Valve uPVC

1 INCH

120 pieces Delivery: 45 days
#153

Ball Valve uPVC

1.25 INCH

100 pieces Delivery: 45 days
#154

Valve

Angle Valve PVC HALF

100 pieces Delivery: 45 days
#155

Cock PVC

Piller Cock PVC HALF

100 pieces Delivery: 45 days
#156

PVC

Tap PVC HALF

250 pieces Delivery: 45 days
#157

Lead Pipe PVC

HALFX 18INCH

100 pieces Delivery: 45 days
#158

Lead Pipe PVC

HALF X 24 INCH

100 pieces Delivery: 45 days
#159

Waste Pipe

Down/Waste Pipe

100 pieces Delivery: 45 days
#160

Elbow Brass

HALFINCH

200 pieces Delivery: 45 days
#161

Elbow Brass

3/4 INCH

100 pieces Delivery: 45 days
#162

Elbow Brass

1 INCH

200 pieces Delivery: 45 days
#163

Elbow Brass

1.25 INCH

50 pieces Delivery: 45 days
#164

Brass Socket FTA

1/2 INCH

200 pieces Delivery: 45 days
#165

Ferrule Brass FTA

3/4 INCH

100 pieces Delivery: 45 days
#166

Brass Socket FTA

1 INCH

150 pieces Delivery: 45 days
#167

Brass Socket FTA

1.25 INCH

50 pieces Delivery: 45 days
#168

Brass Socket MTA

1/2 INCH

200 pieces Delivery: 45 days
#169

Brass Socket MTA

3/4 INCH

100 pieces Delivery: 45 days
#170

Brass Socket MTA

1 INCH

100 pieces Delivery: 45 days
#171

Brass Socket MTA

1,25 INCH

50 pieces Delivery: 45 days
#172

Jali PVC For Wash Basin

Jali PVC For Wash Basin

100 pieces Delivery: 45 days
#173

Union Socket cPVC

HALF INCH

100 pieces Delivery: 45 days
#174

Union Socket cPVC

3Y4 INCH

50 pieces Delivery: 45 days
#175

Union Socket cPVC

1 INCH

100 pieces Delivery: 45 days
#176

Union Socket cPVC

1.25 INCH

50 pieces Delivery: 45 days
#177

Union Socket GI

1/2 INCH

150 pieces Delivery: 45 days
#178

Union Socket GI

3/4 INCH

50 pieces Delivery: 45 days
#179

Union Socket GI

1 INCH

50 pieces Delivery: 45 days
#180

Union Socket GI

1.25 INCH

100 pieces Delivery: 45 days
#181

Ferrule Brass

Ferrule Brass 1/2 INCH

100 pieces Delivery: 45 days
#182

M-Seal

M-Seal Big

50 pieces Delivery: 45 days
#183

Solvant uPVC

Solvant uPVC 250 Gm

100 pieces Delivery: 45 days
#184

Hook

Hook PVC

200 pieces Delivery: 45 days
#185

HOOK

1/2 INCH

100 pieces Delivery: 45 days
#186

HOOKS

HOOKS 4 INCH

300 pieces Delivery: 45 days
#187

HOOK

1 INCH

100 pieces Delivery: 45 days
#188

1.25 INCH

1.25

150 pieces Delivery: 45 days
#189

Hook MS

1/2 INCH

200 pieces Delivery: 45 days
#190

Hook MS

1 INCH

200 pieces Delivery: 45 days
#191

Silk Tube

Silk Tube 50 Gram

50 pieces Delivery: 45 days
#192

Nipple GI

3 x 6

20 pieces Delivery: 45 days
#193

Nipple GI

4 x 6

20 pieces Delivery: 45 days
#194

Nipple GI

3 x 4

20 pieces Delivery: 45 days
#195

Nipple GI

3 x 2

20 pieces Delivery: 45 days
#196

Nipple GI

4 x 4

20 pieces Delivery: 45 days
#197

Nipple GI

4 x 2

20 pieces Delivery: 45 days
#198

Nipple GI

1.25 x 6

50 pieces Delivery: 45 days
#199

Nipple GI

1.25 x 4

50 pieces Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

15 mm dia GI Nipple 3 long,15mm dia GI socket,GI Elbow 15mm,15 mm GI Tee,GI Nipple 20mm 3 long,20 m

Assam Rifles

📍 NORTH TRIPURA, TRIPURA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Hacksaw Blade,Plumb Bob,Plaster Muster,Masons Trowel,GI Pipe,GI Pipe,PVC Pipe,PVC Pipe,GI Nipple,GI

Gujarat Matikam Kalakari And Rural Technology Inst

📍 GANDHI NAGAR, GUJARAT

Est: ₹1.3 L
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM

Water Meter Domestic Size,Water Meter Size,CI Sluice Valve Size,CI Sluice Valve Size,CI NRV Size,GI

Security Printing And Minting Corporation Of India Limited (spmcil)

📍 NASHIK, MAHARASHTRA

Est: ₹3.4 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

PVC PIPE,PVC PIPE 2,PLUMBING PIPE,Service Saddel,Service Saddel 2,M.T,Elbow,Tee,Elbow,Elbow 2,Tee 6

N/a

📍 VADODARA, GUJARAT

EMD: ₹30,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Flexible wire copper TC,PVC copper wire 1.5Sqmm SC,Thread tape,PVC Gutka assorted size,Butt Hinge s

Assam Rifles

📍 SONITPUR, ASSAM

Est: ₹2.0 L
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM