OIL SEAL,FUEL LIFT PUMP,BATTERY CUT OFF SWITCH,STARTOR MOTOR 24V,WATER PUMP,GASKET GEAR COVER,CLUTC
Indian Army
GURDASPUR, PUNJAB
Bid Publish Date
23-Nov-2025, 12:12 pm
Bid End Date
03-Dec-2025, 1:00 pm
Location
Progress
Quantity
33
Category
Dozer Battery Terminal
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for a diverse set of mechanical parts including CHS0710085 Seal Oil Main Clutch, 380C0941279 Joint, 110PS02392 4 St Relay 24 V, CHH22-11005 Hose L500, Nk O Ring Set, Dozer Alternator Assembly, Dozer Battery Terminal, Dozer Fan Belt, Dozer Gasket Sheet, Dozer Accelerator Cable, Dozer Fuel Feed Pump, Dozer Self Starter Assembly, 110TF91246 Gasket Cylinder, 110HC09058 Seal Kit, 726003216 Hose, JCB Hyd Seal Kit, Tata Hitachi Push Rod Ex 70. Estimated value and exact quantities are not listed; the scope spans 17 items. Location unspecified; focus is government supply of spare parts and assemblies to military assets. Key differentiator includes mandatory ISO 9001 certification and two-year warranty with OEM support. The tender emphasizes quantity variation up to 25% and extended delivery timelines, plus structured vendor documentation. Unique aspects include pre- or post-dispatch inspection options and OEM warranty submission at delivery.
Product categories include CHS0710085 Seal Oil Main Clutch, JCB/Hydraulic seals, Dozer components, hoses, gaskets, and cables
Total items: 17 (BOQ lists 17 items, exact quantities not provided)
Intended for government supply to Indian Army across multiple equipment types
Exact dimensions, tolerances, and OEM part numbers align with specified items (e.g., 110PS02392, 110TF91246, 726003216)
Mandatory ISO 9001 certification and OEM warranty submission
up to 25% quantity variation with extended delivery calculations
Pre/post-dispatch inspection by nominated agency and required bid documentation
Not fully disclosed; follows standard government procurement terms with EMD and post-delivery payment per ATC
Delivery period based on original order; additional time calculated as (Increased quantity ÷ Original quantity) × Original period, minimum 30 days
Not explicit; standard LI/LD terms to be confirmed in ATC and contract
Registered bidder or OEM with ISO 9001 certification
Evidence of 1 year minimum experience supplying similar govt category products
Past contracts with Central/State Govt or PSU for similar items
Indian Army
GURDASPUR, PUNJAB
Indian Army
Indian Army
FAIZABAD, UTTAR PRADESH
Indian Army
TINSUKIA, ASSAM
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | CHS0710085 Seal Oil Main Clutch | CHS0710085 Seal Oil Main Clutch | 2 | nos | milangem | 21 |
| 2 | 380C0941279 Joint | 380C0941279 Joint | 2 | nos | milangem | 21 |
| 3 | 110PS02392 4 St Relay 24 V | 110PS02392 4 St Relay 24 V | 1 | nos | milangem | 21 |
| 4 | CHH22-11005 Hose L500 | CHH22-11005 Hose L500 | 1 | nos | milangem | 21 |
| 5 | Nk O Ring Set | Nk O Ring Set | 1 | nos | milangem | 21 |
| 6 | Dozer Alternator Assy | Dozer Alternator Assy | 1 | nos | milangem | 21 |
| 7 | Dozer Battery Terminal | Dozer Battery Terminal | 8 | nos | milangem | 21 |
| 8 | Dozer Fan belt | Dozer Fan belt | 2 | nos | milangem | 21 |
| 9 | Dozer Gasket Sheet | Dozer Gasket Sheet | 1 | nos | milangem | 21 |
| 10 | Dozer Accelerator Cable | Dozer Accelerator Cable | 2 | nos | milangem | 21 |
| 11 | Dozer Fuel Feed Pump | Dozer Fuel Feed Pump | 2 | nos | milangem | 21 |
| 12 | Dozer Self Starter Assy | Dozer Self Starter Assy | 1 | nos | milangem | 21 |
| 13 | 110TF91246 Gasket Cylinder | 110TF91246 Gasket Cylinder | 1 | nos | milangem | 21 |
| 14 | 110HC09058 Seal Kit | 110HC09058 Seal Kit | 2 | nos | milangem | 21 |
| 15 | 726003216 Hose | 726003216 Hose | 1 | nos | milangem | 21 |
| 16 | JCB Hyd Seal Kit | JCB Hyd Seal Kit | 1 | nos | milangem | 21 |
| 17 | Tata Hitachi Push Rod Ex 70 | Tata Hitachi Push Rod Ex 70 | 4 | nos | milangem | 21 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
ISO 9001 certification
OEM authorizations and past performance contracts with Central/State Govt/PSU
Technical compliance certificates and installation/maintenance capabilities
Warranty certificates from OEM and post-delivery support plan
Key insights about UTTARAKHAND tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, ISO 9001 certificate, OEM authorizations, and prior govt contracts showing supply of similar spares. Prepare installation/maintenance capabilities and warranty plan; delivery timelines follow option clause with minimum 30 days extension.
Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, ISO 9001 certificate, OEM authorization, prior govt contracts for similar items, technical compliance certificates, and warranty documentation; ensure vendor code creation details if applicable.
Mandatory ISO 9001 certification for bidder or OEM; OEM warranty certificates must accompany delivery; compliance with installation/commissioning when included in scope; post-delivery service expectations are part of the contract terms.
Delivery time can extend when quantity increases up to 25%; extra time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extension aligns with last date of delivery order.
Warranty is 2 years from final acceptance or after completion of installation/commissioning; OEM warranty certificates must be provided at delivery; supplier must rectify any breakdown during the warranty period.
Inspection can be pre-dispatch at seller premises if ATC selects it, or post-receipt at consignee site; inspection may be conducted by a nominated agency or officer board as per tender terms.
Bidders or OEMs must have at least 1 year of regular supply of similar govt category products; provide contracts as evidence; in bunch bids, the primary product value must meet eligibility for the highest value item.
Delivery periods start from the last delivery order; option clause may extend quantity with revised timelines; minimum 30 days added time; ensure compliance with both pre- and post-inspection requirements.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS