Bid Publish Date
30-Oct-2026, 6:23 pm
Bid End Date
27-Nov-2026, 7:00 pm
EMD
₹9,957
Value
₹1,78,38,964
Location
Progress
The tender is issued by the South Eastern Coalfields Limited (Coal India Limited) for the supply of heavy mechanical drive and conveyor components in KORBA, CHHATTISGARH 495445. Items include INPUT SHAFT BUSHING, OUTPUT SHAFT BUSHING, FOOT-MOUNTED HELICAL GEAR BOX WITH 3 STAGES, COMPLETE TANDEM DRIVE DRUM ASSEMBLY 650MM, multiple PINION/GEAR SETS, INTERMEDIATE SHAFTS, FLUID COUPLING, HOLD BACK 2X90 KW, 1000MM BELT CONVEYOR, AND GEARED/MECHANICAL COUPLINGS. Estimated value about ₹17,838,963.00 with an EMD of ₹9,957. Scope is strictly GOODS SUPPLY, not services. Location details and delivery conditions are governed by Buyer Added Terms, including option to increase quantity by up to 25% at contract rates. The contract emphasizes supplier liability, non-sub-contracting, and possible termination on default. Unique aspect is multi-component, high-capacity drive train matériel for coal handling systems. BIDCLARITY revolves around delivery timelines, performance, and compliance.
Product names and categories from BOQ items: INPUT SHAFT BUSHING, OUTPUT SHAFT BUSHING, FOOT-MOUNTED HELICAL GEAR BOX (3 STAGE), TANDEM DRIVE DRUM ASSEMBLY 650MM, 2ND/3RD STAGE PINION/GEAR SET, INPUT SHAFT WITH INTEGRATED PINION/GEAR, 1ST STAGE INTERMEDIATE SHAFT, EQUALIZING GEAR SET (2 NOS), 2ND STAGE INTERMEDIATE SHAFT BUSHING, 2ND STAGE INTERMEDIATE SHAFT, FLUID COUPLING, HOLD BACK, 2x90 KW, 1000MM BELT CONVEYOR, GEARED/MECHANICAL COUPLING
Quantities/volumes: not specified in BOQ; total items = 14
Est. value: ₹17,838,963.00; EMD: ₹9,957
Delivery/installation: supply-only scope per terms
Standards/quality: no specifications listed; bidders to confirm OEM compatibility and performance criteria
Option to increase quantity by up to 25% during contract; extended delivery period calculated with minimum 30 days
Scope limited to supply of goods; no installation or services included
GST to be paid/reimbursed at actual rates or as per quoted percentage, whichever is lower
GST handling by bidder; payment linked to delivery, per contract terms; no responsibility on GST calculation by buyer
Delivery period can be extended if quantity increases; extension calculation uses (increased quantity / original quantity) × original delivery period, min 30 days
Buyer may terminate for non-delivery or defective materials; contractor remains liable and may face penalties for breach
Experience in supplying heavy mechanical drive components for coal handling systems
Demonstrated financial capacity via latest financial statements
Compliance with GST and eligible for GST credit/reimbursement as per applicable rates
Quantity
42
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
INPUT SHAFT BUSHING , OUT PUT SHAFT BUSHING , FOOT MOUNTED HELICAL GEAR BOX WITH 3 STA , COMPLETE TANDEM DRIVE DRUM ASSY 650MM , 2ND STAGE PINION SHAFT AND GEAR IN SET , 3RD STAGE PINION AND GEAR IN SET , INPUT SHAFT WITH INTIGRATED PINION AND GEAR , 1ST STAGE INTERMEDIATE SHAFT , EQUALIZING GEAR IN SET 2 NOS , 2 ND STAGE INTERMEDIATE SHAFT BUSHING , 2ND STAGE INTERMEDIATE SHAFT , FLUID COUPLING , HOLD BACK 2X90 KW 1000MM BELT CONVEYOR , GEARED COUPLING MECHANICAL COUPLING
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
6
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Korba
Delivery Pincodes
495677
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Atish Waman Chintkutlawar | 495677,SECL MM KORBA AREA | Korba | Chhattisgarh | 495677 | 6 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
INPUT SHAFT BUSHING
2190
OUT PUT SHAFT BUSHING
5390
FOOT MOUNTED HELICAL GEAR BOX WITH 3 STA
901
COMPLETE TANDEM DRIVE DRUM ASSY 650MM
G0710DR
2ND STAGE PINION SHAFT AND GEAR IN SET
353690
3RD STAGE PINION AND GEAR IN SET
464790
INPUT SHAFT WITH INTIGRATED PINION AND GEAR
612690
1ST STAGE INTERMEDIATE SHAFT
3190
EQUALIZING GEAR IN SET 2 NOS
G067590
2 ND STAGE INTERMEDIATE SHAFT BUSHING
4190
2ND STAGE INTERMEDIATE SHAFT
4290
FLUID COUPLING
G0390
HOLD BACK 2X90 KW 1000MM BELT CONVEYOR
GB65
GEARED COUPLING MECHANICAL COUPLING
GC90
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | INPUT SHAFT BUSHING | 2190 | 6 | nos | [email protected] | 45 | |
| 2 | OUT PUT SHAFT BUSHING | 5390 | 6 | nos | [email protected] | 45 | |
| 3 | FOOT MOUNTED HELICAL GEAR BOX WITH 3 STA | 901 | 2 | nos | [email protected] | 45 | |
| 4 | COMPLETE TANDEM DRIVE DRUM ASSY 650MM | G0710DR | 2 | nos | [email protected] | 45 | |
| 5 | 2ND STAGE PINION SHAFT AND GEAR IN SET | 353690 | 2 | nos | [email protected] | 45 | |
| 6 | 3RD STAGE PINION AND GEAR IN SET | 464790 | 1 | nos | [email protected] | 45 | |
| 7 | INPUT SHAFT WITH INTIGRATED PINION AND GEAR | 612690 | 6 | nos | [email protected] | 45 | |
| 8 | 1ST STAGE INTERMEDIATE SHAFT | 3190 | 2 | nos | [email protected] | 45 | |
| 9 | EQUALIZING GEAR IN SET 2 NOS | G067590 | 3 | nos | [email protected] | 45 | |
| 10 | 2 ND STAGE INTERMEDIATE SHAFT BUSHING | 4190 | 4 | nos | [email protected] | 45 | |
| 11 | 2ND STAGE INTERMEDIATE SHAFT | 4290 | 2 | nos | [email protected] | 45 | |
| 12 | FLUID COUPLING | G0390 | 2 | nos | [email protected] | 45 | |
| 13 | HOLD BACK 2X90 KW 1000MM BELT CONVEYOR | GB65 | 2 | nos | [email protected] | 45 | |
| 14 | GEARED COUPLING MECHANICAL COUPLING | GC90 | 2 | nos | [email protected] | 45 |
Extended Deadline
27-Nov-2026, 1:30 pm
Opening Date
28-Nov-2026, 1:30 pm
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of heavy mechanical drive components
Financial statements demonstrating financial capacity
EMD submission proof (₹9,957) as specified
Technical bid documents and compliance certificates
OEM authorizations (if applicable) for drive train components
Any other documents requested under Buyer Added Terms (e.g., delivery/work experience, warranty terms)
Key insights about CHHATTISGARH tender market
Bidders should submit GST registration, PAN, experience certificates, financial statements, EMD ₹9,957, and technical bid documents. Ensure OEM authorizations if required, and confirm scope is GOODS SUPPLY only. Adhere to Buyer Added Terms on quantity variation up to 25% and delivery extensions with minimum 30 days.
Prepare GST certificate, PAN, recent financial statements, experience certificates for similar supply, EMD proof of ₹9,957, technical bid/compliance certificates, and OEM authorizations if applicable. Ensure all documents align with terms on supply-only scope and GST handling.
No explicit IS or ISI numbers listed; bidders must confirm OEM compatibility for INPUT/OUTPUT SHAFT BUSHINGS, FOOT-MOUNTED HELICAL GEAR BOX (3 STAGES), and TANDEM DRIVE DRUM ASSEMBLY 650MM. Provide performance and fitment data, mounting dimensions, and material specs to prove interchangeability with existing coal handling equipment.
Delivery terms allow extension via option clause; minimum extension time is 30 days, calculated by the formula (increased quantity / original quantity) × original delivery period, with delivery commencing after the last date of the original order.
EMD is ₹9,957. Submit via demand draft or online payment per tender guidance. Ensure the instrument remains valid for the bid validity period and accompanies the technical bid as part of the bid submission.
GST is the bidder’s responsibility; reimbursement will be as per actual rates or the quoted GST percentage, whichever is lower. Payment terms align with supply of goods, with no service component; ensure compliant invoicing and GST paperwork.
Eligibility includes prior experience in similar supply, adequate financial capability, GST registration, and ability to provide OEM authorizations if required. Demonstrate capacity to deliver 14-item scope and comply with extended quantities up to 25% under contract terms.