TenderDekho Logo
Closed GEM

Invitation to Bid - SPARES FOR BOILERS1,SPARES FOR BOILERS2,SPARES FOR BOILERS3,SPARES FOR BOILERS4,SPARES FOR BOILERS5 in BANGALORE, KARNATAKA

Bid Publish Date

05-Feb-2026, 1:56 pm

Bid End Date

26-Feb-2026, 2:00 pm

Progress

Issue05-Feb-2026, 1:56 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

928

Category

SPARES FOR BOILERS1

Bid Type

Two Packet Bid

Categories 105

BP INSTRUMENT SIMPLEX PUMPS WORM PUMPS WATER DISTRIBUTION PLATFORM SCALE MILD STEEL PIPE ANIMAL WATERING MACHINES MISCELLANEOUS VALVE ASSEMBLIES ANGLE GLOBE VALVES STRUCTURE FABRICATION BEVEL WASHERS MANUFACTURING MACHINERY MS PIPE TUBE AND FITTING NON RETURN VALVE DESERT COOLER SENSOR BOX ASSEMBLY AIR BRAKE AMPS STEEL FURNITURE ARC VALVE DISTILLATION AIR REGULATORS WELL TESTING EQUIPMENTS BLADE BED MILLING MACHINE BOILERS RUBBER GASKET FLUID AND GAS REGULATOR HYDRAULIC VALVES PUMP SPARE PARTS TEMPERATURE GAUGE MAGNET VALVE FLANGE ELECTRONIC COUNTERS DEEPWELL PUMPS IRRIGATION PUMPS DIAPHRAGM VALVES MILITARY VEHICLE PANEL INDICATING AND RECORDING INSTRUMENTS CABLING PRESSURE INDICATORS SEALING RING ENERGY METER FLOW REGULATOR RADIAL DRILLING MACHINE TEXTURE ANALYSER FOOT VALVE ALTERNATING CURRENT MOTOR LABORATORY PRESSES PNEUMATIC VALVES PUMP VALVES PNEUMATIC PRESSURE GAUGE VALVES GASKETS AND SEALS CORRUGATED BOX PRESSURE REGULATOR ENGINEERING TESTING SERVICES STEAM TRAPS POSITIVE MATERIAL BOX CHAIN PULLEY VALVE WOODEN HANDLE FLOW SWITCHES PRESSURE MEASURING AND CONTROL INSTRUMENTS WIRE FILTER RETAINERS FLOW DETECTOR CHAIN BLOCK FUEL PUMP ERECTION OF STRUCTURAL SOLENOID VALVES STEAM GENERATOR STEAM PUMPS SLIDING VANE PUMPS EXHAUST SYSTEM BRAKE ANAESTHESIA MACHINE ANGLE COCK SPLIT CASING PUMP BOILER MOUNTING VALVE DIAPHRAGM PUMPS HYDRO-MECHANICAL EQUIPMENT FIRE BREATHING APPARATUS FABRICATOR SLEEVE GAUGE MS PIPE LINE VALVE PARTS AND ACCESSORIES RECIPROCATING PUMPS OSCILLATING PUMPS WATER COOLED ENGINE DUPLEX PUMPS BOILER VALVE WATER PUMP ELECTROMAGNET METAL PRODUCTS BOYLES APPARATUS MANUFACTURING SERVICES GLOBE VALVES

Hindustan Aeronautics Limited (hal) invites bids for SPARES FOR BOILERS1, SPARES FOR BOILERS2, SPARES FOR BOILERS3, SPARES FOR BOILERS4, SPARES FOR BOILERS5, SPARES FOR BOILERS6, SPARES FOR BOILERS7, SPARES FOR BOILERS8, SPARES FOR BOILERS9, SPARES FOR BOILERS10, SPARES FOR BOILERS11, SPARES FOR BOILERS12, SPARES FOR BOILERS13, SPARES FOR BOILERS14, SPARES FOR BOILERS15, SPARES FOR BOILERS16, SPARES FOR BOILERS17, SPARES FOR BOILERS18, SPARES FOR BOILERS19, SPARES FOR BOILERS20, SPARES FOR BOILERS21, SPARES FOR BOILERS22, SPARES FOR BOILERS23, SPARES FOR BOILERS24, SPARES FOR BOILERS25, SPARES FOR BOILERS26, SPARES FOR BOILERS27, SPARES FOR BOILERS28, SPARES FOR BOILERS29, SPARES FOR BOILERS30, SPARES FOR BOILERS31, SPARES FOR BOILERS32, SPARES FOR BOILERS33, SPARES FOR BOILERS34, SPARES FOR BOILERS35, SPARES FOR BOILERS36, SPARES FOR BOILERS37, SPARES FOR BOILERS38, SPARES FOR BOILERS39, SPARES FOR BOILERS40, SPARES FOR BOILERS41, SPARES FOR BOILERS42, SPARES FOR BOILERS43, SPARES FOR BOILERS44, SPARES FOR BOILERS45, SPARES FOR BOILERS46, SPARES FOR BOILERS47, SPARES FOR BOILERS48, SPARES FOR BOILERS49, SPARES FOR BOILERS50, SPARES FOR BOILERS51, SPARES FOR BOILERS52, SPARES FOR BOILERS53, SPARES FOR BOILERS54, SPARES FOR BOILERS55, SPARES FOR BOILERS56, SPARES FOR BOILERS57, SPARES FOR BOILERS58, SPARES FOR BOILERS59, SPARES FOR BOILERS60 in BANGALORE, KARNATAKA. Quantity: 928. Submission Deadline: 26-02-2026 14: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SPARES FOR BOILERS1 , SPARES FOR BOILERS2 , SPARES FOR BOILERS3 , SPARES FOR BOILERS4 , SPARES FOR BOILERS5 , SPARES FOR BOILERS6 , SPARES FOR BOILERS7 , SPARES FOR BOILERS8 , SPARES FOR BOILERS9 , SPARES FOR BOILERS10 , SPARES FOR BOILERS11 , SPARES FOR BOILERS12 , SPARES FOR BOILERS13 , SPARES FOR BOILERS14 , SPARES FOR BOILERS15 , SPARES FOR BOILERS16 , SPARES FOR BOILERS17 , SPARES FOR BOILERS18 , SPARES FOR BOILERS19 , SPARES FOR BOILERS20 , SPARES FOR BOILERS21 , SPARES FOR BOILERS22 , SPARES FOR BOILERS23 , SPARES FOR BOILERS24 , SPARES FOR BOILERS25 , SPARES FOR BOILERS26 , SPARES FOR BOILERS27 , SPARES FOR BOILERS28 , SPARES FOR BOILERS29 , SPARES FOR BOILERS30 , SPARES FOR BOILERS31 , SPARES FOR BOILERS32 , SPARES FOR BOILERS33 , SPARES FOR BOILERS34 , SPARES FOR BOILERS35 , SPARES FOR BOILERS36 , SPARES FOR BOILERS37 , SPARES FOR BOILERS38 , SPARES FOR BOILERS39 , SPARES FOR BOILERS40 , SPARES FOR BOILERS41 , SPARES FOR BOILERS42 , SPARES FOR BOILERS43 , SPARES FOR BOILERS44 , SPARES FOR BOILERS45 , SPARES FOR BOILERS46 , SPARES FOR BOILERS47 , SPARES FOR BOILERS48 , SPARES FOR BOILERS49 , SPARES FOR BOILERS50 , SPARES FOR BOILERS51 , SPARES FOR BOILERS52 , SPARES FOR BOILERS53 , SPARES FOR BOILERS54 , SPARES FOR BOILERS55 , SPARES FOR BOILERS56 , SPARES FOR BOILERS57 , SPARES FOR BOILERS58 , SPARES FOR BOILERS59 , SPARES FOR BOILERS60

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8937103.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 60 Items Sign in for GEM prices

#1

SPARES FOR BOILERS1

SPARES and CONSUMABLES FOR STEAM BOILERS and ASSOCIATED UNITS FUSIBLE PLUG 25 MM IBR ONE PIECE DESIGN

15 nos Delivery: 45 days
#2

SPARES FOR BOILERS2

FUSIBLE PLUG 20 MM IBR ONE PIECE DESIGN

25 nos Delivery: 45 days
#3

SPARES FOR BOILERS3

GLOBE VALVE CAST STEEL SIZE 6 inch CLASS 300 WITH IBR CERTIFICATE

3 nos Delivery: 45 days
#4

SPARES FOR BOILERS4

GLOBE VALVE CAST STEEL SIZE 4 inch CLASS 300 WITH IBR CERTIFICATE

2 nos Delivery: 45 days
#5

SPARES FOR BOILERS5

GLOBE VALVE CAST STEEL SIZE 1 inch CLASS 150 WITH IBR CERTIFICATE

10 nos Delivery: 45 days
#6

SPARES FOR BOILERS6

BOILER FEED WATER PUMP HORIZANTAL MULTISTAGE 5 point 5 KW

2 nos Delivery: 45 days
#7

SPARES FOR BOILERS7

GAS FLOW METER RANGE 0 500 KG or HR SIZE 3 inch WITH TOTALIZER and PANEL ASSEMBLY

2 nos Delivery: 45 days
#8

SPARES FOR BOILERS8

STEAM FLOW METER WITH NECESSARY CABLING and DISPLAY SIZE 3 inch

2 nos Delivery: 45 days
#9

SPARES FOR BOILERS9

STEAM FLOW METER WITH NECESSARY CABLING and DISPLAY SIZE 4 inch

1 nos Delivery: 45 days
#10

SPARES FOR BOILERS10

STEAM FLOW METER WITH NECESSARY CABLING and DISPLAY SIZE 6 inch

1 nos Delivery: 45 days
#11

SPARES FOR BOILERS11

PRESSURE REDUCING VALVE SIZE 3 inch CLASS 300 WITH IBR CERTIFICATE

1 nos Delivery: 45 days
#12

SPARES FOR BOILERS12

PRESSURE REDUCING VALVE SIZE 2 inch CLASS 300 WITH IBR CERTIFICATE

1 nos Delivery: 45 days
#13

SPARES FOR BOILERS13

MS PIPE B CLASS 2 inch OD 60 point 3mm THK 2 point 90mm LENGTH 6 METER

25 nos Delivery: 45 days
#14

SPARES FOR BOILERS14

MS PIPE B CLASS 1 inch OD 33 point 8mm THK 2 point 60mm LENGTH 6 METER

10 nos Delivery: 45 days
#15

SPARES FOR BOILERS15

MS PIPE B CLASS half inch OD 21 point 4mm THK 2mm LENGTH 6 METER

10 nos Delivery: 45 days
#16

SPARES FOR BOILERS16

I C WAFER TYPE NRV(NON RETURN VALVE SIZE 2 inch GRADE SS304

3 nos Delivery: 45 days
#17

SPARES FOR BOILERS17

DISC TYPE NRV NON RETURN VALVE SIZE 50mm GRADE SS304

4 nos Delivery: 45 days
#18

SPARES FOR BOILERS18

BRASS FOOT VALVE 2 inch THREADED

6 nos Delivery: 45 days
#19

SPARES FOR BOILERS19

CPVC FOOT VALVE 3 inch THREADED

3 nos Delivery: 45 days
#20

SPARES FOR BOILERS20

STEAM TRAP TD TYPE SIZE half inch

20 nos Delivery: 45 days
#21

SPARES FOR BOILERS21

STEAM TRAP TD TYPE SIZE 3 by 4 inch

10 nos Delivery: 45 days
#22

SPARES FOR BOILERS22

STEAM TRAP TD TYPE SIZE 1 inch

10 nos Delivery: 45 days
#23

SPARES FOR BOILERS23

PRESSURE GAUGE 4 inch RANGE 0 to 15Kg or Cm2 WITH TEST CERTIFICATE

10 nos Delivery: 45 days
#24

SPARES FOR BOILERS24

PRESSURE GAUGE 6 inch RANGE 0 to 21Kg or Cm2 WITH TEST CERTIFICATE

5 nos Delivery: 45 days
#25

SPARES FOR BOILERS25

PRESSURE GAUGE12 inch RANGE 0 to 21Kg or Cm2 WITH TEST CERTIFICATE

5 nos Delivery: 45 days
#26

SPARES FOR BOILERS26

SINTEX TANK 10000 LTRS WITH 3 LAYER PROTECTION

4 nos Delivery: 45 days
#27

SPARES FOR BOILERS27

DIAPHRAGM VALVE SIZE 2 inch

10 nos Delivery: 45 days
#28

SPARES FOR BOILERS28

DIAPHRAGM SIZE 2 inch

50 nos Delivery: 45 days
#29

SPARES FOR BOILERS29

DIAPHRAGM SIZE 1 and half inch

50 nos Delivery: 45 days
#30

SPARES FOR BOILERS30

PH DIGITAL METER WITH SENSOR

1 nos Delivery: 45 days
#31

SPARES FOR BOILERS31

TEMPERATURE GAUGE ROT TYPE 4 inch RANGE

5 nos Delivery: 45 days
#32

SPARES FOR BOILERS32

TDS DIGITAL METER

1 nos Delivery: 45 days
#33

SPARES FOR BOILERS33

HARDNESS TESTING KIT

5 nos Delivery: 45 days
#34

SPARES FOR BOILERS34

SS FLANGE SIZE 3 by 4 inch

50 nos Delivery: 45 days
#35

SPARES FOR BOILERS35

SS FLANGE SIZE 1 inch

50 nos Delivery: 45 days
#36

SPARES FOR BOILERS36

SS BOLT SIZE half inch LENGTH SIZE 2 and half inch

100 nos Delivery: 45 days
#37

SPARES FOR BOILERS37

SS NUT SIZE half inch

100 nos Delivery: 45 days
#38

SPARES FOR BOILERS38

CHAIN BLOCK 3 TON CAPACITY WITH TEST CERTIFICATE

1 nos Delivery: 45 days
#39

SPARES FOR BOILERS39

GRAPHITE GLAND PACKING ROPE SIZE 6 MM

5 kg Delivery: 45 days
#40

SPARES FOR BOILERS40

GRAPHITE GLAND PACKING ROPE SIZE 8 MM

5 kg Delivery: 45 days
#41

SPARES FOR BOILERS41

GRAPHITEGLAND PACKING ROPE SIZE 10 MM

5 kg Delivery: 45 days
#42

SPARES FOR BOILERS42

GRAPHITEGLAND PACKING ROPE SIZE 12 MM

2 kg Delivery: 45 days
#43

SPARES FOR BOILERS43

GRAPHITE PASTE

2 kg Delivery: 45 days
#44

SPARES FOR BOILERS44

METALLIC GASKET

25 kg Delivery: 45 days
#45

SPARES FOR BOILERS45

NON METALLIC GASKET

25 kg Delivery: 45 days
#46

SPARES FOR BOILERS46

PORTABLE WELDING SET 250 AMPS

1 nos Delivery: 45 days
#47

SPARES FOR BOILERS47

CONICAL WASHER

50 nos Delivery: 45 days
#48

SPARES FOR BOILERS48

GAUGE GLASS SLEEVE SIZE 3 by 4 inch

50 nos Delivery: 45 days
#49

SPARES FOR BOILERS49

MOBERY TOP BOX ASSEMBLY

1 nos Delivery: 45 days
#50

SPARES FOR BOILERS50

WATER CONTROLLER MOBERY AIR BRAKE SWITCH

10 nos Delivery: 45 days
#51

SPARES FOR BOILERS51

WATER PUMP CNP / GROUNFOS 3 HP

2 nos Delivery: 45 days
#52

SPARES FOR BOILERS52

GAUGE GLASS SPINDLE STANDARD

50 nos Delivery: 45 days
#53

SPARES FOR BOILERS53

HAWKSAW FRAME SIZE 12 inch WITH WOODEN HANDLE

2 nos Delivery: 45 days
#54

SPARES FOR BOILERS54

HSS HACKSAW BLADE SIZE 12 inch x half inch

50 nos Delivery: 45 days
#55

SPARES FOR BOILERS55

HOT WATER PIPE SIZE 3 by 4 inch TEMP UPTO 200 DEG CENTIGRADE LENGTH ONE METER

10 nos Delivery: 45 days
#56

SPARES FOR BOILERS56

STEAM SOLENOID VALVE 1 inch

10 nos Delivery: 45 days
#57

SPARES FOR BOILERS57

STEAM SOLENOID VALVE half inch

5 nos Delivery: 45 days
#58

SPARES FOR BOILERS58

FEED CHECK VALVE 40MM CLASS 150 WITH TC

2 nos Delivery: 45 days
#59

SPARES FOR BOILERS59

GLOBE VALVE CAST STEEL SIZE 3 inch CLASS 300 WITH IBR CERTIFICATE

2 nos Delivery: 45 days
#60

SPARES FOR BOILERS60

SINTEX TANK 1000 LTRS WITH 3 LAYERS PROECTION

1 nos Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data