TenderDekho Logo
Closed GEM

Rashtriya Chemicals And Fertilizers Limited GeM Tender for Milton Roy Equipment (RCF Procurement) 2026

Bid Publish Date

24-Jan-2026, 12:44 pm

Bid End Date

10-Feb-2026, 1:00 pm

Generate Docs

Progress

Issue24-Jan-2026, 12:44 pm
Corrigendum03-Feb-2026
Award31-Mar-2026, 12:17 am
Explore all 4 tabs to view complete tender details

Quantity

280

Category

300157039

Bid Type

Single Packet Bid

Key Highlights

  • Authorized dealer requirement: M/S. BKW T Trading and Invest Pvt Ltd authorized to quote Milton Roy equipment
  • GST/invoice compliance: GSTIN in consignee name, GST portal payment screenshot required
  • Vendor code creation: PAN, GSTIN, cancelled cheque, EFT mandate mandatory
  • ATC documents: signed technical catalogue, No Deviation Declaration, Annexures
  • Future tenders: non-authorized bidders treated as unsolicited; check rcfltd.com for openings
  • BOQ complexity: 167 items referenced, but no specific item specs provided in data
  • GST reimbursement basis: actuals or quoted GST rate, whichever is lower, within tender terms
  • GeM publication: proprietary tender on GeM portal; prequalification through RCF procurement

Categories 50

Tender Overview

The procurement is issued by Rashtriya Chemicals and Fertilizers Limited (RCF) under the Department of Fertilizers for items associated with the GeM portal, published on a proprietary basis to M/S. BKW T Trading and Invest Pvt Ltd as an authorized dealer of Milton Roy India Pvt Ltd. The scope centers on equipment supply with up to 167 BOQ items referenced, though specific item specifications are not disclosed in the available data. Key differentiators include mandatory ATC attachments, no-deviation declarations, and a prequalification path via RCF’s procurement channel. Bidders should prepare to align with the GeM proprietary terms and contact RCF for future tendering windows. This opportunity requires precise vendor registration, prequalification, and adherence to the specified invoice and GST processes.

Technical Specifications & Requirements

  • Documents to submit with bid for Vendor Code Creation: PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bidder’s bank.
  • Invoices must be raised in the name of the Consignee and include the Consignee’s GSTIN.
  • Upon GeM portal invoice generation, bidders must upload a scanned GST invoice and a GST portal payment confirmation screenshot.
  • Tender is published on GeM, with ATC attachments requiring: (i) signed technical specification catalogue, (ii) No Deviation Declaration, (iii) signed ANNEXURES of ATC attachments. Separate deviation sheets may be attached if deviations exist.
  • This procurement is channeled through an authorized dealer; other bidders are considered unsolicited for this tender but may quote for future tenders.

Terms, Conditions & Eligibility

  • GST applicability is bidder’s responsibility; reimbursement as actuals or applicable rate, capped by quoted GST percentage.
  • Documents required: PAN, GSTIN, Cancelled Cheque, EFT Mandate; GST invoice upload with payment confirmation on GST portal.
  • Invoices must be GST-compliant and in the consignee’s name with the consignee GSTIN.
  • Prebid documentation: signed technical specification catalogue, No Deviation Declaration, and ATC annexures; deviations to be disclosed on the designated page.
  • Only authorized dealer quotations will be considered; future tenders may invite other bidders through RCF’s site.
  • No explicit dates or location data available in the provided data; bidders should verify current timelines with RCF.

Key Specifications

  • Vendor Code Creation documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Invoice must be in consignee name with consignee GSTIN

  • GST invoice upload plus GST portal payment screenshot on GeM

  • ATC attachments: technical catalogue, No Deviation Declaration, ANNEXURES

  • Authorized dealer: M/S. BKW T Trading and Invest Pvt Ltd for Milton Roy equipment

Terms & Conditions

  • GST reimbursement as actuals or applicable rate, subject to quoted GST

  • Invoices to be raised in consignee name with GSTIN

  • Mandatory ATC documents and deviation disclosures

  • Bidder validation through vendor code creation and EFT mandate

Important Clauses

Payment Terms

GST reimbursement limited to actuals or quoted rate; payment terms aligned to GeM submission and GST portal confirmation

Delivery Schedule

Not explicitly specified in data; bidders should seek confirmation from RCF procurement for timelines

Penalties/Liquidated Damages

Not specified in data; check ATC or future amendments for LD or penalties

Bidder Eligibility

  • Authorized dealer of Milton Roy India Pvt Ltd or equivalent OEM authorization

  • Compliant GST registration and PAN

  • Ability to submit EFT Mandate and fulfill vendor code creation requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

300157039 , 300157040 , 300157041 , 300157042 , 300157043 , 300157044 , 300157045 , 300157046 , 300157047 , 300157048 , 300157049 , 300157050 , 300157051 , 300157052 , 300157053 , 300157054 , 300157055 , 300157056 , 300157057 , 300157058 , 300157059 , 300157060 , 300157061 , 300157063 , 300157064 , 300157065 , 300157066 , 300157067 , 300157068 , 300157069 , 300157070 , 300157071 , 300157072 , 300157073 , 300157074 , 300157075 , 300157076 , 300157077 , 300157078 , 300157079 , 300157082 , 300157083 , 300157084 , 300157085 , 300157086 , 300157087 , 300157088 , 300157089 , 300157090 , 300157091 , 300157092 , 300157093 , 300157094 , 300157095 , 300157096 , 300157097 , 300157098 , 300157099 , 300157100 , 300157101 , 300157102 , 300157103 , 300157104 , 300157105 , 300157106 , 300156962 , 300156963 , 300156964 , 300156965 , 300156966 , 300157107 , 300157108 , 300157109 , 300157110 , 300157111 , 300157112 , 300157113 , 300157114 , 300157115 , 300157116 , 300157117 , 300157118 , 300157119 , 300157120 , 300157121 , 300157122 , 300157123 , 300157124 , 300157125 , 300157126 , 300157136 , 300157137 , 300157138 , 300157139 , 300157140 , 300157141 , 300157142 , 300157143 , 300157144 , 300157145 , 300157149 , 300157150 , 300157151 , 300157152 , 300157153 , 300157154 , 300157155 , 300157156 , 300157167 , 300157168 , 300157169 , 300157170 , 300157171 , 300157172 , 300157173 , 300157174 , 300157176 , 300157177 , 300157178 , 300157179 , 300157180 , 300157181 , 300157182 , 300157183 , 300157184 , 300157185 , 300157186 , 300157187 , 300157188 , 300157189 , 300157190 , 300157191 , 300157192 , 300157193 , 300157194 , 300157195 , 300157196 , 300157197 , 300157198 , 300157199 , 300157200 , 300157201 , 300157202 , 300157203 , 300157204 , 300157205 , 300157206 , 300157207 , 300157208 , 300157209 , 300157210 , 300157211 , 300157212 , 300157213 , 300157214 , 300157215 , 300157216 , 300157217 , 300157218 , 300157219 , 300157220 , 300157221 , 300157222 , 300157223 , 300157224 , 300157225 , 300157226

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8880484.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 167 Items Sign in for GEM prices

#1

300157039

DIS CHAMBER FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#2

300157040

SIGHT GLASS FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#3

300157041

IRV ASSEMBLY FOR ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#4

300157042

OIL PLUG FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#5

300157043

VALVE SPRING FOR ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#6

300157044

VALVE FOR ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#7

300157045

STROKE ADJ CYL FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#8

300157046

STROKE ADJ RACK ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#9

300157047

PLUNGER FOR ETP DP-04 DP-05 DP-09

2 no Delivery: 45 days
#10

300157048

LOCK HANDLE FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#11

300157049

HOUSING SIMPLEX ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#12

300157050

ADJ DRUM ASSEMBLY ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#13

300157051

STROKE ADJ KNOB AS ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#14

300157052

WORM SHAFT 1/15 AS ETP DP-04 DP-05 DP-09

2 no Delivery: 45 days
#15

300157053

MOTOR ADAPTOR FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#16

300157054

BOLT, NUT,WASH ST ETP DP-04 DP-05 DP-09

3 st Delivery: 45 days
#17

300157055

GSKT ST DRIVE END ETP DP-04 DP-05 DP-09

3 st Delivery: 45 days
#18

300157056

SIMPLEX ECC SHAFT ETP DP-04 DP-05 DP-09

1 st Delivery: 45 days
#19

300157057

OIL PLUG FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#20

300157058

WORM GEAR 1/15 FOR ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#21

300157059

ECCENTRIC CAGE FOR ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#22

300157060

O-RING SET ETP DP-04 DP-05 DP-09

4 st Delivery: 45 days
#23

300157061

CIRCLIP SET ETP DP-04 DP-05 DP-09

4 st Delivery: 45 days
#24

300157063

BOLT, NUT, WASH ST ETP DP-04 DP-05 DP-09

4 st Delivery: 45 days
#25

300157064

DOWELS ST ETP DP-04 DP-05 DP-09

4 no Delivery: 45 days
#26

300157065

HEAD FOR ETP DP-04 DP-05 DP-09

1 no Delivery: 45 days
#27

300157066

UNION NUT FOR ETP DP-04 DP-05 DP-09

2 no Delivery: 45 days
#28

300157067

ANTISYPHON AS ETP DP-04 DP-05 DP-09

3 no Delivery: 45 days
#29

300157068

SUC/DIS BALL GUIDE ETP DP-04 DP-05 DP-09

6 no Delivery: 45 days
#30

300157069

BACK PLATE FOR ETP DP-04 DP-05 DP-09

2 no Delivery: 45 days
#31

300157070

DIAPHRAGM FOR ETP DP-04 DP-05 DP-09

4 no Delivery: 45 days
#32

300157071

DIAPHRAGM DISC ETP DP-04 DP-05 DP-09

2 no Delivery: 45 days
#33

300157072

O-RING FOR ETP DP-04 DP-05 DP-09

4 no Delivery: 45 days
#34

300157073

Y-TYPE STRAINER ETP DP-04 DP-05 DP-09

6 no Delivery: 45 days
#35

300157074

DIS CHAMBER FOR ETP DP-02

1 no Delivery: 45 days
#36

300157075

SIGHT GLASS FOR ETP DP-02

1 no Delivery: 45 days
#37

300157076

IRV ASSEMBLY FOR ETP DP-02

2 no Delivery: 45 days
#38

300157077

OIL FILLING PLUG FOR ETP DP-02

1 no Delivery: 45 days
#39

300157078

VALVE SPRING FOR ETP DP-02

2 no Delivery: 45 days
#40

300157079

VALVE - ALUMINIUM FOR ETP DP-02

1 no Delivery: 45 days
#41

300157082

STROKE ADJUSTMENT CYLINDERS FORETP DP-02

1 no Delivery: 45 days
#42

300157083

STROKE ADJ RACK FOR ETP DP-02

1 no Delivery: 45 days
#43

300157084

PLUNGER FOR ETP DP-02

1 no Delivery: 45 days
#44

300157085

LOCK HANDLE FOR ETP DP-02

1 no Delivery: 45 days
#45

300157086

HOUSING SIMPLEX FOR ETP DP-02

1 no Delivery: 45 days
#46

300157087

ADJUSTMENT DRUM ASSEMBLY FOR ETP DP-02

1 no Delivery: 45 days
#47

300157088

STROKE AD KNOB AS FOR ETP DP-02

1 no Delivery: 45 days
#48

300157089

WORM SHAFT 1/8 ASSY FOR ETP DP-02

1 no Delivery: 45 days
#49

300157090

MOTOR ADAPTOR FOR ETP DP-02

1 no Delivery: 45 days
#50

300157091

BOLT, NUT & WASHER SET FOR ETP DP-02

2 st Delivery: 45 days
#51

300157092

GASKET SET FOR DRIVE END FOR ETP DP-02

2 st Delivery: 45 days
#52

300157093

SIMPLEX ECC SHAFT FOR ETP DP-02

1 st Delivery: 45 days
#53

300157094

OIL DRAIN PLUG WITH O-RING FOR ETP DP-02

1 no Delivery: 45 days
#54

300157095

WORM GEAR 1/8 FOR ETP DP-02

1 no Delivery: 45 days
#55

300157096

ECCENTRIC CAGE FOR ETP DP-02

1 no Delivery: 45 days
#56

300157097

O-RING COMPLETE SET FOR ETP DP-02

2 st Delivery: 45 days
#57

300157098

CIRCLIP COMPLETE SET FOR ETP DP-02

2 st Delivery: 45 days
#58

300157099

BOLT, NUT, WASH COMPLETE ST ETP DP-02

2 st Delivery: 45 days
#59

300157100

DOWELS COMPLETE SET FOR ETP DP-02

2 no Delivery: 45 days
#60

300157101

HEAD FOR ETP DP-02

1 no Delivery: 45 days
#61

300157102

UNION NUT FOR ETP DP-02

1 no Delivery: 45 days
#62

300157103

ANTISYPHON ASSEMBLY FOR ETP DP-02

2 no Delivery: 45 days
#63

300157104

SUC/DIS BALL GUIDE AS ETP DP-02

2 no Delivery: 45 days
#64

300157105

BACK PLATE FOR ETP DP-02

1 no Delivery: 45 days
#65

300157106

DIAPHRAGM FOR ETP DP-02

3 no Delivery: 45 days
#66

300156962

DIAPHRAGM SUPPORT DISC FOR ETP DP-02

1 no Delivery: 45 days
#67

300156963

O-RING FOR ETP DP-02

2 no Delivery: 45 days
#68

300156964

Y-TYPE STRAINER FOR ETP DP-02

2 no Delivery: 45 days
#69

300156965

WORM GEAR FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#70

300156966

CONNECTING ROD ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#71

300157107

SPACER FOR ETP DP-06 DP-07 DP-08

2 no Delivery: 45 days
#72

300157108

GEAR SHAFT FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#73

300157109

E-5 CIRCLIP FOR ETP DP-06 DP-07 DP-08

2 no Delivery: 45 days
#74

300157110

CONTROL KNOB AS ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#75

300157111

CONTROL SPOOL AS ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#76

300157112

CONT SPOOL O-RING ETP DP-06 DP-07 DP-08

2 no Delivery: 45 days
#77

300157113

END PLUG FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#78

300157114

OIL DRAIN PLUG FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#79

300157115

MAIN PLUNGER FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#80

300157116

DOWEL PIN ETP DP-06 DP-07 DP-08

2 no Delivery: 45 days
#81

300157117

LINKAGE ARM FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#82

300157118

O-RING CAP ETP DP-06 DP-07 DP-08

2 no Delivery: 45 days
#83

300157119

OIL FILL CAP AS ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#84

300157120

WORM SHAFT AS ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#85

300157121

IRV ASSY FOR ETP DP-06 DP-07 DP-08

3 no Delivery: 45 days
#86

300157122

MOTOR ADAPTOR AS ETP DP-06 DP-07 DP-08

1 st Delivery: 45 days
#87

300157123

DIS VALVE AS ETP DP-06 DP-07 DP-08

3 no Delivery: 45 days
#88

300157124

SUC VALVE AS ETP DP-06 DP-07 DP-08

3 no Delivery: 45 days
#89

300157125

BACK UP PLATE FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#90

300157126

HEAD MROY A FOR ETP DP-06 DP-07 DP-08

1 no Delivery: 45 days
#91

300157136

DIAPHRAGM FOR ETP DP-06 DP-07 DP-08

6 no Delivery: 45 days
#92

300157137

CONTOUR PLATE FOR ETPDP-06 DP-07 DP-08

1 no Delivery: 45 days
#93

300157138

SQUARE O RING ETP DP-06 DP-07 DP-08

4 no Delivery: 45 days
#94

300157139

Y-STRAINER AS ETP DP-06 DP-07 DP-08

6 no Delivery: 45 days
#95

300157140

ANTISYPHON VALVE ETP DP-06 DP-07 DP-08

3 no Delivery: 45 days
#96

300157141

DIS CHAMBER FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#97

300157142

OIL LEVEL IND FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#98

300157143

IRV ASSEMBLY FOR ETP DP-01 DP-10

3 no Delivery: 45 days
#99

300157144

OIL PLUG FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#100

300157145

VALVE SPRING FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#101

300157149

VALVE - ALUMINIUM FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#102

300157150

WASHER VALVE - SS FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#103

300157151

STROKE ADJ CYLINDER ETP DP-01 DP-10

1 no Delivery: 45 days
#104

300157152

STROKE ADJ RACK FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#105

300157153

PLUNGER FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#106

300157154

LOCK HANDLE FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#107

300157155

HOUSING FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#108

300157156

ADJ DRUM AS FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#109

300157167

STROKE ADJ KNOB AS ETP DP-01 DP-10

1 no Delivery: 45 days
#110

300157168

WORM SHAFT AS ETP DP-01 DP-10

1 no Delivery: 45 days
#111

300157169

MOTOR ADAPTOR FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#112

300157170

BOLT, NUT, WASH ST ETP DP-01 DP-10

2 st Delivery: 45 days
#113

300157171

GSKT ST DRIVE END FOR ETP DP-01 DP-10

2 st Delivery: 45 days
#114

300157172

SIMPLEX ECC SHAFT FOR ETP DP-01 DP-10

2 st Delivery: 45 days
#115

300157173

DRAIN PLUG FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#116

300157174

WORM GEAR 1/25 FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#117

300157176

ECCENTRIC CAGE FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#118

300157177

O-RING COMPLETE SET FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#119

300157178

CIRCLIP SET FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#120

300157179

BOLT, NUT, WASH SET ETP DP-01 DP-10

2 no Delivery: 45 days
#121

300157180

DOWELS COMPLETE SET FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#122

300157181

HEAD FOR ETP DP-01 DP-10

1 no Delivery: 45 days
#123

300157182

SPRING-ANTISYPHON VALVE ETP DP-01 DP-10

2 no Delivery: 45 days
#124

300157183

ANTISYPHON ASSEMBLY FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#125

300157184

SUC/DISC BALL GUIDE AS ETP DP-01 DP-10

4 no Delivery: 45 days
#126

300157185

BACK PLATE FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#127

300157186

DIAPHRAGM FOR ETP DP-01 DP-10

4 no Delivery: 45 days
#128

300157187

DIAPHRAGM DISC ETP DP-01 DP-10

1 no Delivery: 45 days
#129

300157188

O-RING COMPLETE SETFOR ETP DP-01 DP-10

2 no Delivery: 45 days
#130

300157189

Y-TYPE STRAINER FOR ETP DP-01 DP-10

2 no Delivery: 45 days
#131

300157190

BALL GUIDE, BALL SEAT ETP DP-01 DP-10

2 no Delivery: 45 days
#132

300157191

STROKE ADJ KNOB FOR ETP DP-03

1 no Delivery: 45 days
#133

300157192

ADJUSTMENT SCALE FOR ETP DP-03

1 no Delivery: 45 days
#134

300157193

COVER FOR ETP DP-03

1 no Delivery: 45 days
#135

300157194

ADJUSTMENT SCREW FOR ETP DP-03

1 no Delivery: 45 days
#136

300157195

STROKE LOCKING KNOB AS ETP DP-03

1 no Delivery: 45 days
#137

300157196

LOCK BOLT STOPPER FOR ETP DP-03

1 no Delivery: 45 days
#138

300157197

OIL FILLING PLUG FOR ETP DP-03

1 no Delivery: 45 days
#139

300157198

OIL LEVEL INDICATOR FOR ETP DP-03

1 no Delivery: 45 days
#140

300157199

GEAR BEARING WITH O-RING FOR ETP DP-03

1 no Delivery: 45 days
#141

300157200

WORM GEAR 1/8 FOR ETP DP-03

1 no Delivery: 45 days
#142

300157201

WORM SHAFT 1/8 FOR ETP DP-03

1 no Delivery: 45 days
#143

300157202

DOWEL PIN FOR ETP DP-03

1 no Delivery: 45 days
#144

300157203

CONNECTING ROD FOR ETP DP-03

1 no Delivery: 45 days
#145

300157204

SLIDING CRANK ASSY FOR ETP DP-03

1 no Delivery: 45 days
#146

300157205

SLIDER ROUND FOR ETP DP-03

1 no Delivery: 45 days
#147

300157206

ADJUSTER FOR ETP DP-03

1 no Delivery: 45 days
#148

300157207

GEAR SUPPORT FOR ETP DP-03

1 no Delivery: 45 days
#149

300157208

DRAIN PLUG FOR ETP DP-03

1 no Delivery: 45 days
#150

300157209

MOTOR ADAPTOR FOR ETP DP-03

1 no Delivery: 45 days
#151

300157210

BUSH FOR MOTOR FRAME FOR ETP DP-03

1 no Delivery: 45 days
#152

300157211

BOTTOM CAP ASSY FOR ETP DP-03

1 no Delivery: 45 days
#153

300157212

PHL DRIVE END SEAL KIT FOR ETP DP-03

1 no Delivery: 45 days
#154

300157213

PISTON FOR ETP DP-03

1 no Delivery: 45 days
#155

300157214

PISTON SEAL FOR ETP DP-03

1 no Delivery: 45 days
#156

300157215

PISTON SLEEVE WITH O-RING FOR ETP DP-03

1 no Delivery: 45 days
#157

300157216

ADAPTOR WITH O-RING FOR ETP DP-03

1 no Delivery: 45 days
#158

300157217

CONTOUR PLATE HPD 266 ETP DP-03

1 no Delivery: 45 days
#159

300157218

HEAD 266 FOR ETP DP-03

1 no Delivery: 45 days
#160

300157219

DIAPHRAGM HPD 266 FOR ETP DP-03

2 no Delivery: 45 days
#161

300157220

SUC/DISCE VALVE AS FOR ETP DP-03

1 no Delivery: 45 days
#162

300157221

RETAINER PLATE FOR ETP DP-03

1 no Delivery: 45 days
#163

300157222

DISPLACEMENT CHAMBER FOR ETP DP-03

1 no Delivery: 45 days
#164

300157223

MARS VALVE ASSEMBLY FOR ETP DP-03

1 no Delivery: 45 days
#165

300157224

BACK UP PLATE FOR ETP DP-03

1 no Delivery: 45 days
#166

300157225

RELIEF VALVE ASSEMBLY FOR ETP DP-03

1 no Delivery: 45 days
#167

300157226

LIQUID END SEAL KIT FOR ETP DP-03

1 no Delivery: 45 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

CancelledCheque copy

4

EFT Mandate copy certified by Bank

5

Signed and stamped copy of technical specification catalogue

6

Signed and stamped copy of No Deviation Declaration

7

Signed and stamped copies of ANNEXURES of ATC attachments

8

Any deviations disclosed on the designated deviation page

Corrigendum Updates

1 Update
#1

Update

03-Feb-2026

Extended Deadline

10-Feb-2026, 1:00 pm

Opening Date

10-Feb-2026, 1:30 pm

Financial Results

Rank Seller Price Item
L1
******   Under PMA
Item Categories : 300157039,300157040,300157041,300157042,300157043,300157044,300157045,300157046,300157047,300157048

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the RCF GeM tender for Milton Roy equipment in Rajasthan 2026

Bidders must satisfy vendor code creation with PAN, GSTIN, and Cancelled Cheque plus an EFT Mandate. Invoices must be raised in the consignee name with the consignee GSTIN. Upload scanned GST invoice and GST portal payment confirmation on GeM; include signed ATC documents and No Deviation Declaration.

What documents are required for bidder registration and submission in this GeM tender

Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; along with signed technical catalogue, No Deviation Declaration, and ATC annexures. Deviations must be listed on the designated page; only authorized dealer quotes are accepted for this tender.

What are the GST-related conditions in the RCF GeM procurement

GST reimbursement is on actuals or the quoted rate, whichever is lower, within tendered GST percentage. Invoices must reflect the consignee’s GSTIN, and GST payment proof must be uploaded on the GST portal during invoicing.

Which organization and location is associated with this tender and what is the scope

The tender is issued by Rashtriya Chemicals And Fertilizers Limited (RCF), Department of Fertilizers, for equipment sourcing via GeM with 167 BOQ items referenced; specific item specs are not disclosed in the current data.

What are the ATC documentation requirements for this GeM tender

Submit a signed technical specification catalogue, a signed No Deviation Declaration, and signed ANNEXURES of ATC attachments. If deviations exist, provide a separate deviation sheet as per the bid form.

When will payment terms and delivery timelines be finalized for the Milton Roy tender

Delivery timelines are not explicitly stated in the current data; bidders should confirm delivery schedules and payment milestones through RCF procurement channels after vendor code approval and ATC finalization.

What is the role of authorized dealers in this GeM tender

Only authorized dealers of Milton Roy India Pvt Ltd can quote for this tender; other bidders may participate in future tenders but not in this current GeM bid, per RCF guidance.

What is the process to verify GST invoice compliance in this procurement

Prepare GST-compliant invoice in consignee name with the consignee GSTIN, upload scanned GST invoice on GeM, and attach GST portal payment confirmation screenshots to satisfy tender requirements.