Progress
The Ministry of Panchayati Raj in Madhepura, Bihar invites bids for Pole-Mounted Outdoor Dustbins (Q3) with a proposed scope that includes several related items such as DUSTBIN pairs, SAFETY KITS, CO-DUSTBIN units, and TOOL & TICKLES. The BOQ shows no formal numeric line items, while the ATC clauses specify flexible quantity adjustments up to 25% of bid/contracted quantities. The procurement is location-specific to MADHEPURA, 852101, with no explicit estimated value disclosed. Key differentiators include the option to scale orders during contract execution and a delivery-time formula tied to the original delivery period. This tender targets suppliers with demonstrated performance and compliance capability for municipal waste receptacle installations.
Dustbin type: pole-mounted outdoor dustbin (quantity variant to be confirmed in bid)
Dustbin quantity: 1516 PAIR (DUSTBIN) as per ATC
Safety kit quantity: 11 PS
Co-dustbin quantity: 10 PS
Tool & Tickles quantity: 1 PS
Delivery framework: delivery period starts from last date of original delivery order; extended delivery period rules apply
25% quantity variation allowed during contract execution at contracted rates
3 years minimum experience required with turnover documentation
Past performance evidence mandatory for bid eligibility
Not specified in data; verify during bid submission; ensure alignment with delivery milestones and contract terms
Delivery period commences from last date of original delivery order; extended delivery time rules apply with minimum 30 days
Not specified; bidders should seek clarity on penalties or LD terms during bid process
MINIMUM 3 YEARS OF EXPERIENCE in supplying municipal waste-bin related products
TURNOVER CERTIFICATE to demonstrate financial capability
Past Performance evidence from previous similar contracts
Quantity
1538
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pole-Mounted Outdoor Dustbin (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
12-Nov-2025, 2:30 pm
Opening Date
12-Nov-2025, 3:00 pm
PAST PERFORMANCE documentation
MINIMUM 3 YEARS OF EXPERIENCE证明
TURNOVER CERTIFICATE
OEM authorization or supplier certification (if applicable)
Any prior contract completion reports or client letters
GST registration certificate (if applicable to bid submission)
Key insights about BIHAR tender market
To bid, verify eligibility with MINIMUM 3 YEARS OF EXPERIENCE and provide TURNOVER CERTIFICATE along with PAST PERFORMANCE. Prepare documentation for dustbin procurement including itemized ATC terms (DUSTBIN 1516 PAIR, SAFETY KIT 11 PS, CO-DUSTBIN 10 PS, TOOL & TICKLES 1 PS) and convey ability to meet the 25% quantity variation clause.
Required documents include PAST PERFORMANCE evidence, MINIMUM 3 YEARS OF EXPERIENCE, TURNOVER CERTIFICATE, OEM authorizations if applicable, and client completion reports. Submit GST/PAN details if requested and any technical compliance certificates to demonstrate capability for pole-mounted outdoor dustbins.
No formal technical specs are published; bidders must rely on ATC items: DUSTBIN — 1516 PAIR, SAFETY KIT — 11 PS, CO-DUSTBIN — 10 PS, TOOL & TICKLES — 1 PS. Ensure compatibility with pole-mounted installations and address durability in local climate; refer to delivery-order-based schedules in ATC.
Delivery starts from the last date of the original delivery order. The option clause allows up to 25% quantity increase at contracted rates during the contract, with extended delivery periods calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
EMD details are not disclosed in the data; bidders should confirm the exact amount during bid submission. Payment terms are governed by contract terms; ensure you can meet milestones linked to delivery and maintain records for performance-based payments alongside warranty/AMC terms if specified.
Prepare robust PAST PERFORMANCE documentation, demonstrate MINIMUM 3 YEARS OF EXPERIENCE, and supply TURNOVER CERTIFICATE. Include OEM authorizations if required and ensure all documents reflect current GST/PAN status. Submit clear reference contracts showing successful delivery of municipal waste-bin projects.
ATC lists: DUSTBIN – 1516 PAIR; SAFETY KIT – 11 PS; CO-DUSTBIN – 10 PS; TOOL & TICKLES – 1 PS. Bidders should verify any additional items or accessories during bid submission and align delivery capabilities with PoD timelines and 25% variation allowance.