TenderDekho Logo
Active GEM

Bharat Heavy Electricals Limited Polished Condensate Booster Pump Tender Bina Rajasthan 2026

Bid Publish Date

11-Jul-2026, 4:03 pm

Bid End Date

03-Sep-2026, 3:00 pm

Generate Docs

Progress

Issue11-Jul-2026, 4:03 pm
Corrigendum02-Sep-2026
AwardPending

Key Highlights

  • Organization: Bharat Heavy Electricals Limited (BHEL) under Department Of Heavy Industry
  • Product: Polished condensate booster pump for BPCL Bina
  • Location: BPCL Bina, Rajasthan (implied by BPCL Bina scope; exact city/state not populated)
  • Quantity flexibility: 25% up or during contract currency at contracted rates

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids for a Polished condensate booster pump under the BPCL Bina scope. The tender references a quantity increase option up to 25% and extended delivery terms triggered by the option clause, with delivery periods calculated per formula or minimum 30 days. While several fields are not populated (start/end dates, location, estimated value, EMD), the document emphasizes contract flexibility on quantities and delivery timelines. Bidders must carefully align with the option clause and ensure readiness to scale production to meet possible increments during the contract period. The procurement appears to be under the Department of Heavy Industry framework, targeting equipment supply for a refinery or processing plant at BPCL Bina.

Technical Specifications & Requirements

  • Product: Polished condensate booster pump for BPCL Bina integration
  • Scope: Supply alignment with option to increase quantity up to 25% at contracted rates; delivery period adjustments based on (additional quantity/original quantity) × original delivery period, minimum 30 days
  • Key constraints: Delivery commencement from the last date of the original delivery order; extended time may be applied during currency of contract
  • BOQ: No items listed; no total quantity available; attention to potential hidden long-lead components and compatibility with BPCL Bina systems
  • Documentation: Manufacturer capabilities to satisfy refinery-grade condensate handling equipment; potential OEM authorizations if specified later
  • Quality/Certification: Not explicitly specified; bidders should presume domain standards for process pumps and refinery interfaces
  • Location/Installation: BPCL Bina site integration implied; confirm installation support requirements during supplier engagement

Terms, Conditions & Eligibility

  • Quantity flexibility: Up to 25% higher quantity allowed; extended period calculations apply
  • Delivery terms: Extensions follow the defined formula, minimum 30 days; adherence to original delivery period rules
  • EMD/financials: Not specified in data; bidders should verify in final communications
  • Compliance: Generic clause requires bidders to comply with option clause; ensure readiness for scale-up
  • Documentation: Review terms for OEM authorizations and installation support; confirm GST/PAN and past performance records once issued

Key Specifications

  • Product/service names: Polished condensate booster pump

  • Quantities: Up to 25% quantity variation possible (during contract)

  • Estimated value: Not disclosed in available data

  • Experience: Prior supply to refinery or BPCL-like installations preferred

  • Quality/standards: Not explicitly stated; bidders should propose standard refinery-grade equipment

Terms & Conditions

  • Key Term 1: Option Clause allows 25% quantity variation during contract

  • Key Term 2: Delivery period adjustments follow a defined formula with minimum 30 days

  • Key Term 3: Delivery begins from last date of original delivery order; extensions possible

Important Clauses

Payment Terms

Not specified in data; verify in final tender documents and clarify during bid submission

Delivery Schedule

Delivery period starts from last date of original order; extended periods computed as (additional/original) × original days, min 30 days

Penalties/Liquidated Damages

Not specified in data; confirm any LD or performance penalties in final terms

Bidder Eligibility

  • Experience in supplying refinery-grade condensate handling equipment

  • Financial statements showing capacity to scale by up to 25% without disruption

  • Compliance with OEM authorization requirements and potential IS/ISO certifications

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

23

OEM Avg. Turnover

23

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Polished condensate booster pump BPCL Bina

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Sagar

Delivery Pincodes

470124

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Priyanka D470124,Bharat Petroleum Corporation Limited, Bina Refinery, Bina, District -Sagar, Madhya Pradesh, India 470124SagarMadhya Pradesh4701241150-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9594118.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

8 Updates
#1

Update

02-Sep-2026

Extended Deadline

03-Sep-2026, 9:30 am

Opening Date

03-Sep-2026, 10:00 am

#2

Update

29-Aug-2026

Extended Deadline

02-Sep-2026, 9:30 am

Opening Date

02-Sep-2026, 10:00 am

#3

Update

25-Aug-2026

Extended Deadline

29-Aug-2026, 9:30 am

Opening Date

29-Aug-2026, 10:00 am

#4

Update

19-Aug-2026

Extended Deadline

25-Aug-2026, 10:30 am

Opening Date

25-Aug-2026, 11:00 am

#5

Update

12-Aug-2026
#6

Update

10-Aug-2026

Extended Deadline

19-Aug-2026, 10:30 am

Opening Date

19-Aug-2026, 11:00 am

#7

Update

04-Aug-2026

Extended Deadline

10-Aug-2026, 10:30 am

Opening Date

10-Aug-2026, 11:00 am

#8

Update

27-Jul-2026

Extended Deadline

04-Aug-2026, 10:30 am

Opening Date

04-Aug-2026, 11:00 am

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar condensate pump supply

4

Financial statements demonstrating fiscal stability

5

EMD/Security deposit documentation (amount not specified here)

6

Technical bid documents showing pump model, performance data, and compliance

7

OEM authorization letters (where applicable)

8

Any existing ISI/ISO certification or industry-standard compliance (if specified later)

Frequently Asked Questions

How to bid for the polished condensate booster pump tender in Rajasthan 2026

Bidders must submit GST registration, PAN, experience certificates, financial statements, and EMD documentation. Ensure OEM authorization if required and provide detailed technical compliance for the pump. Review the option clause allowing 25% quantity variation and the delivery-schedule formula. Prepare installation and after-sales support plan for BPCL Bina.

What documents are required for BHEL BPCL Bina tender submission 2026

Required documents include GST certificate, PAN card, experience certificates for refinery projects, financial statements, EMD, technical compliance data for the pump, OEM authorizations, and any applicable ISO/ISI certifications. Ensure uploads are in the prescribed format and accompany the technical bid with performance curves.

What are the key technical specifications for the condensate booster pump tender 2026

The tender specifies a polished condensate booster pump for BPCL Bina; no explicit quantitative specs are provided in the data. Bidders should present model numbers, flow rate, head, efficiency, materials of construction, and compatibility with BPCL interfaces, along with performance curves and warranty terms from the OEM.

When is the delivery schedule for the BPCL Bina pump procurement

Delivery terms are based on the original delivery order date, with possible extensions calculated as (additional quantity ÷ original quantity) × original delivery period, and a minimum extension of 30 days. Confirm the exact delivery timeline in the contract and plan for scale-up if quantity increases occur.

What is the eligibility for quantity variation under the tender

The purchaser reserves the right to increase or decrease the quantity by up to 25% at the time of contract placement and during the currency of the contract at contracted rates. Bidders must be prepared to supply additional units without price adjustments beyond the stated rate.

How to demonstrate OEM authorization and installation capability for BPCL Bina

Submit OEM authorization letters authorizing supply and after-sales support for the specified condensate pump model. Include service capability details, installation support plan, and on-site commissioning procedures to meet BPCL Bina integration requirements.

What are the penalties or LD terms for delivery delays

The available data does not specify LD terms. Bidders should obtain explicit penalty clauses during clarification and ensure alignment with delivery milestones and potential liquidated damages to avoid contract risk. Prepare a credible risk mitigation plan for potential delays.

What standards or certifications are required for refinery-grade pumps

While not specified, bidders should propose IS/ISO certifications (e.g., ISO 9001) and refinery-grade interface compatibility. Include material certificates, performance tests, and any BPCL-specific compliance requirements to strengthen the bid submission.

Explore More Opportunities

Quick Access