Bid Publish Date
15-Oct-2026, 11:50 am
Bid End Date
29-Oct-2026, 12:00 pm
Progress
Indian Air Force seeks procurement of multiple aircraft spare parts and related controls, including COMBINATION SWITCH, HOLDER ASSY STARTER BUSH, BRAKE LIGHT SWITCH, SOLENOID SWITCH LUCAS, REVERSE SWITCH, RESERVOIR POWER STEERING, BONNET OPENING CABLE ASSY, PARKING LIGHT, RELAY FUEL SOLENOID, and PARKING LIGHT ASSEMBLY. The scope comprises 10 items with brand-new, reliable, known-brand components and the same model/MAKE for all items. Minimum shelf life is 2 years at supply and balance. The contract includes option clauses allowing up to 25% quantity variation and extended delivery aligned to original delivery periods, with minimum 30 days for added time. The buyer emphasizes MT spares past performance and non-obsolescence, with data sheet and OEM authorisation essential. Deliverables must meet ISI/ISO-like rigor through data sheets and warranty of 2 years. Location and detailed delivery schedule align with IAF requirements; the contract will rely on established OEM brands and tested maintenance parts. This tender emphasizes supply reliability, brand recognition, and adherence to all T&C.
10 items in BOQ with unspecified quantities
Items must be from known brands, same model across all items
Minimum usable shelf life of 2 years at supply
Warranty period: 2 years from acceptance or installation
Data sheets must match offered product specifications
OEM past performance proof required for government supply
Option to increase quantity by up to 25% during contract
Delivery period aligned to original delivery order; extended period min 30 days
MT spares past performance proof required for eligibility
Non-obsolete parts with at least 2 years residual life
2-year warranty and data sheet validation
EMD amount not specified in data; refer to ATC for exact value and payment route; delivery linked to original DO with option for 25% quantity variation.
Delivery starts from the last date of original delivery order; extended delivery time proportional to additional quantity, minimum 30 days.
LDs may apply per ATC; specific rates not disclosed in available data.
Must have supplied MT spares to a government office/organization with proof
Must quote only non-obsolete items with minimum 2 years residual life
Must supply data sheets and OEM authorizations
Quantity
14
Category
COMBINATION SWITCH
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
50 %
Warranty Period
2 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
COMBINATION SWITCH , HOLDER ASSY STARTER BUSH , BRAKE LIGHT SWITCH , SOLENOID SWITCH LUCAS , REVERSE SWITCH , RESERVOIR POWER STEERING , BONET OPENING CABLE ASSY , PARKING LIGHT , RELAY FUEL SOLENOID , PARKING LIGHT ASSY
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
KANPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KANPUR CITY | KANPUR CITY | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
29-Oct-2026, 6:30 am
Opening Date
30-Oct-2026, 6:30 am
COMBINATION SWITCH
COMBINATION SWITCH
HOLDER ASSY STARTER BUSH
HOLDER ASSY STARTER BUSH
BRAKE LIGHT SWITCH
BRAKE LIGHT SWITCH
SOLENOID SWITCH LUCAS
SOLENOID SWITCH LUCAS
REVERSE SWITCH
REVERSE SWITCH
RESERVOIR POWER STEERING
RESERVOIR POWER STEERING
BONET OPENING CABLE ASSY
BONET OPENING CABLE ASSY
PARKING LIGHT
PARKING LIGHT
RELAY FUEL SOLENOID
RELAY FUEL SOLENOID
PARKING LIGHT ASSY
PARKING LIGHT ASSY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | COMBINATION SWITCH | COMBINATION SWITCH | 1 | each | lgsoffr_afschakeri | 15 | |
| 2 | HOLDER ASSY STARTER BUSH | HOLDER ASSY STARTER BUSH | 3 | each | lgsoffr_afschakeri | 15 | |
| 3 | BRAKE LIGHT SWITCH | BRAKE LIGHT SWITCH | 2 | each | lgsoffr_afschakeri | 15 | |
| 4 | SOLENOID SWITCH LUCAS | SOLENOID SWITCH LUCAS | 1 | each | lgsoffr_afschakeri | 15 | |
| 5 | REVERSE SWITCH | REVERSE SWITCH | 1 | each | lgsoffr_afschakeri | 15 | |
| 6 | RESERVOIR POWER STEERING | RESERVOIR POWER STEERING | 1 | each | lgsoffr_afschakeri | 15 | |
| 7 | BONET OPENING CABLE ASSY | BONET OPENING CABLE ASSY | 1 | each | lgsoffr_afschakeri | 15 | |
| 8 | PARKING LIGHT | PARKING LIGHT | 2 | each | lgsoffr_afschakeri | 15 | |
| 9 | RELAY FUEL SOLENOID | RELAY FUEL SOLENOID | 1 | each | lgsoffr_afschakeri | 15 | |
| 10 | PARKING LIGHT ASSY | PARKING LIGHT ASSY | 1 | each | lgsoffr_afschakeri | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Past performance certificates showing MT spares supply to government bodies
Data sheets for all offered items
OEM/Manufacturer authorization letters
Financial statements demonstrating capability to sustain 2-year warranty
Technical bid documents with compliance statements
Any certificates of brand authenticity and warranty terms
Bidders must submit GST, PAN, past performance certificates for MT spares supply, data sheets for offered items, OEM authorizations, and financial statements. Ensure non-obsolete parts with 2-year residual life and 2-year warranty. Follow ATC terms and provide samples if invited.
Required documents include GST certificate, PAN, past government supply proof, data sheets, OEM authorizations, and financial statements. Include warranty terms and MT spares supply history to government bodies to demonstrate eligibility and capability.
Technical specs require known-brand items, same model across all 10 parts, 2-year shelf life, data sheet alignment with offered products, and non-obsolescence confirmation. Past performance proof and OEM authorizations are mandatory for eligibility.
Delivery commences from the last date of the original delivery order. Additional quantity up to 25% may extend delivery; extended time equals (additional/original) × original days, minimum 30 days. Adhere to ATC clause for extensions.
Warranty is 2 years from final acceptance or completion of installation/commissioning. Any failures within warranty period may require replacement or repair as per OEM terms under the contract and ATC provisions.
Data sheets must precisely match offered specifications; mismatches risk rejection. OEM authorization proves supplier capability to source authentic parts. Ensure data sheets reflect model, standards, and installation guidelines of the items.
The buyer requires all items from known brands with identical model/MAKE. Submit brand proof and a single model family across the ten parts; L-1 may visit the buyer office for sample verification after contract. Ensure no obsolescence.