Bid Publish Date
25-Aug-2026, 6:36 pm
Bid End Date
04-Sep-2026, 7:00 pm
EMD
₹2,07,624
Location
Progress
Indian Army invites bids for 24 Port 10GE L3 Ethernet Switch, Supply, Installation, Cable Routing, Termination, Testing & Comissioning of Network Infrastructure, Server or Network Rack (V2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1), Copper (Ethernet) Patch Panel in NASHIK, MAHARASHTRA. Quantity: 47. Submission Deadline: 04-09-2026 19: 00: 00. Submit your proposal before the deadline.
Quantity
47
Category
24 Port 10GE L3 Ethernet Switch
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
21
OEM Avg. Turnover
21
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
24 Port 10GE L3 Ethernet Switch , Supply, Installation, Cable Routing, Termination, Testing & Comissioning of Network Infrastructure , Server or Network Rack (V2) , Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) , Copper (Ethernet) Patch Panel
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
38
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
NASHIK CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NASHIK CITY | NASHIK CITY | - | - | 21 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Product Structure | Rack Mounting Standard | 19-inch (48.26 cm) |
| Product Structure | Rack Unit Height (in Rack Unit - U) | 9U, 10U, 11U, 12U, 13U, 15U, 16U, 17U, 18U, 19U, 22U, 24U, 25U, 26U, 27U, 31U, 32U, 33U, 36U, 37U, 38U, 41U, 42U, 44U, 45U, 47U, 48U Or higher |
| Product Structure | Installation Type | Wall Mounted |
| Product Structure | Rack Enclosure Type | Enclosed Rack Cabinet |
| Equipment Compatibility | Mounting Rail Type | Adjustable Mounting Rails |
| Equipment Compatibility | Equipment Mounting Depth (mm) | Up to 600, Up to 700, Up to 800, Up to 1000, Up to 1200 Or higher |
| Mechanical Construction | Frame Material | Cold Rolled Steel (CRS) |
| Mechanical Construction | Load Bearing Capacity (Static) | Up to 30 kg, Up to 40 kg, Up to 50 kg, Up to 100 kg, Up to 150 kg, Up to 200 kg, Up to 250 kg, Up to 300 Kg, Up to 350 kg, Up to 400 kg Or higher |
| Mechanical Construction | Rack Mobility | Fixed Floor Mount |
| Enclosure Features | Front Door Type | Glass Door |
| Enclosure Features | Rear Door Type | No Rear Door |
| Enclosure Features | Side Panel Type | Fixed |
| Infrastructure & Usability | Cooling Provision | Cooling Fans Included (Fan Tray Installed) Or higher |
| Infrastructure & Usability | Cable Entry Provision | Top Entry, Bottom Entry |
| Infrastructure & Usability | Cable Management Provision | Horizontal Cable Management |
| Infrastructure & Usability | Power Distribution Unit (PDU) | PDU Included with Rack |
| Infrastructure & Usability | Grounding Provision | Yes |
| Infrastructure & Usability | On Site Warranty | 1, 3 Or higher |