TenderDekho Logo
GEM

Indian Army Department Of Military Affairs Air Filter, Engine Parts & Accessories Tender 2026 Rajasthan - ISO 9001 Required

Bid Publish Date

07-Jul-2026, 9:55 am

Bid End Date

17-Jul-2026, 10:00 am

EMD

₹40,000

Progress

Issue07-Jul-2026, 9:55 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

378

Category

Fuel Feed Pump with fuel filter Assy

Bid Type

Two Packet Bid

Categories 38

Tender Overview

The Indian Army, under the Department Of Military Affairs, invites bids for a broad range of engine and related components including air filters, rocker arms, cylinder heads and associated fuel and oil system parts. The procurement involves a large catalog across 109 items with an estimated value not disclosed and an EMD of ₹40,000. The supplier must provide ISO 9001 certification or OEM equivalent, data sheets, and material certificates. A 50% quantity variation option exists, with delivery terms linked to original delivery orders and a minimum 30-day extension rule. This tender emphasizes strict QC via buyer lab testing and post-dispatch/ pre-dispatch inspection options by Board of Officers.

Technical Specifications & Requirements

  • Product scope includes: air filter, engine block components, fuel pump assemblies, injectors, oil filters, piston rings, valves, rocker assemblies, gaskets, tappets, and associated piping.
  • Data Sheet submission is mandatory; mismatch risks rejection.
  • ISO 9001 certification required for bidder or OEM.
  • Material Test Certificate to accompany supply; buyer’s lab results determine acceptance.
  • Bid submission must align with 50% quantity variation and pricing at contracted rates; delivery timing begins after the original delivery order date.
  • Inspection: pre-dispatch at seller premises or post-receipt at consignee site via Board of Officer as applicable.
  • EMD: ₹40,000; payment terms and performance security aligned with GeM guidelines.
  • BoQ contains 109 items; exact quantities not disclosed in the summary.

Terms, Conditions & Eligibility

  • Earnest Money Deposit (EMD): ₹40,000.
  • ISO 9001 certification from bidder or OEM is mandatory.
  • Data Sheet and Material Test Certificate required with bid; independent lab verification will determine acceptance.
  • Option clause allows ±50% quantity change at contract award and during currency, with delivery extension rules.
  • Payment terms and performance security governed by GeM and AtC; pre/post inspection options available.
  • Bidders must ensure all documents (PAN, GSTIN, cancelled cheque, EFT mandate) as per vendor code creation requirements are submitted.
  • Non-compliance with any certificate or data sheet could lead to bid rejection.

Key Specifications

  • EMD amount: ₹40,000

  • ISO 9001 certification required for bidder or OEM

  • Data Sheet and Material Test Certificate required with bid

  • Pre-dispatch or post-receipt inspection by Board of Officer

  • Option clause allows ±50% quantity variation

  • 109 items in BoQ; exact quantities not disclosed in summary

Terms & Conditions

  • EMD of ₹40,000 required for bid submission

  • ISO 9001 certification mandatory for bidder or OEM

  • Data Sheet and Material Test Certificate must accompany bid

Important Clauses

Payment Terms

Payment terms aligned with GeM ATC; performance security via PBG or DD allowed; DD payable to CO 4 Engineer Regiment, Chumathang

Delivery Schedule

Delivery period linked to original delivery order date; option to extend based on increased/decreased quantity with minimum 30 days extension

Penalties/Liquidated Damages

Penalty details governed by GeM terms; LD or performance-based penalties may apply as per auction ATC

Bidder Eligibility

  • Must hold ISO 9001 certification or OEM equivalent

  • Must submit Data Sheet and Material Test Certificate

  • Must provide GSTIN, PAN and EFT mandate with bid

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Air filter , Armature Outer BRG , AVR Plate , Cylinder Bore , Cylinder Assy with inlet and exhaust Valve , Push Rod , Push Tube , Fan Belt , Fuel Feed Pump with fuel filter Assy , Fuel Injection Pump , Fuel Rerurn Adapter , Fuel Pipe , Injector Assy , Oil filter , Piston Ring Set , Tapped Cover , Rocker , Head Gasket , Cylinder Head Assy with inlet and exhaust valve , Head gasket , Oil Pipeline , Air Filter , Push rod , Push tube O ring , Injector , Cell , Connecting Rod , Cyl Head Assy with valve , Oil Filter , Pistion Ring Set , Piston , Push tube seal , Push Rod Seal Lower , Push Rod Seal Upper , Rocker Arm Assy , Sleeve Cyl Assy , Single Element Fuel Pump oblique FIP , Armature , Big end cell , Cylinder Head with inlet and exhaust valve , Cylinder bore , Exhaust fan , Fuel pipe line tank to Feed Pump , Fuel Filter , Injectors , Packing kit , Pistion Assy , Pistion Ring , Push tube , Push Tube Seal , Tappet Cover , Benjo nut , Cells , FIP , Cylinder Head Assy , Engine Packing Kit , Fuel Pipe Line feed pump to FIP , Fuel Pipe Line tank to feed pump , Fuel pipe line pump to filter , Fuel feed pump , Hose clamp , Injector Nozzle , Over Flow Pipe Line , Sleeve , Tappet cover , Tappet Gasket , Push tube Seal , Turbo Charger , Crank shaft , Fuel Line Pipe , Fuel Pipe Tank to Pump

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9566211.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 109 Items Sign in for GEM prices

#1

Air filter

Air filter

10 nos Delivery: 45 days
#2

Armature Outer BRG

Armature Outer BRG

10 nos Delivery: 45 days
#3

AVR Plate

AVR Plate

1 nos Delivery: 45 days
#4

Cylinder Bore

Cylinder Bore

2 nos Delivery: 45 days
#5

Cylinder Assy with inlet and exhaust Valve

Cylinder Assy with inlet and exhaust Valve

2 nos Delivery: 45 days
#6

Push Rod

Push Rod

2 nos Delivery: 45 days
#7

Push Tube

Push Tube

2 nos Delivery: 45 days
#8

Fan Belt

Fan Belt

2 nos Delivery: 45 days
#9

Fuel Feed Pump with fuel filter Assy

Fuel Feed Pump with fuel filter Assy

5 nos Delivery: 45 days
#10

Fuel Injection Pump

Fuel Injection Pump

4 nos Delivery: 45 days
#11

Fuel Rerurn Adapter

Fuel Rerurn Adapter

5 nos Delivery: 45 days
#12

Fuel Pipe

Fuel Pipe

4 nos Delivery: 45 days
#13

Injector Assy

Injector Assy

5 nos Delivery: 45 days
#14

Oil filter

Oil filter

5 nos Delivery: 45 days
#15

Piston Ring Set

Piston Ring Set

5 nos Delivery: 45 days
#16

Tapped Cover

Tapped Cover

5 nos Delivery: 45 days
#17

Rocker

Rocker

4 nos Delivery: 45 days
#18

Head Gasket

Head Gasket

5 nos Delivery: 45 days
#19

AVR Plate

AVR Plate

2 nos Delivery: 45 days
#20

Cylinder Head Assy with inlet and exhaust valve

Cylinder Head Assy with inlet and exhaust valve

2 nos Delivery: 45 days
#21

Head gasket

Head gasket

2 nos Delivery: 45 days
#22

Oil Pipeline

Oil Pipeline

2 nos Delivery: 45 days
#23

Air Filter

Air Filter

1 nos Delivery: 45 days
#24

Push Tube

Push Tube

4 nos Delivery: 45 days
#25

Push rod

Push rod

3 nos Delivery: 45 days
#26

Push tube O ring

Push tube O ring

4 nos Delivery: 45 days
#27

Injector

Injector

3 nos Delivery: 45 days
#28

Rocker

Rocker

2 nos Delivery: 45 days
#29

Cell

Cell

5 nos Delivery: 45 days
#30

Connecting Rod

Connecting Rod

2 nos Delivery: 45 days
#31

Cyl Head Assy with valve

Cyl Head Assy with valve

7 nos Delivery: 45 days
#32

Fan Belt

Fan Belt

4 nos Delivery: 45 days
#33

Oil Filter

Oil Filter

4 nos Delivery: 45 days
#34

Pistion Ring Set

Pistion Ring Set

5 nos Delivery: 45 days
#35

Piston

Piston

3 nos Delivery: 45 days
#36

Push tube seal

Push tube seal

2 nos Delivery: 45 days
#37

Push Rod Seal Lower

Push Rod Seal Lower

4 nos Delivery: 45 days
#38

Push Rod Seal Upper

Push Rod Seal Upper

3 nos Delivery: 45 days
#39

Rocker Arm Assy

Rocker Arm Assy

1 nos Delivery: 45 days
#40

Sleeve Cyl Assy

Sleeve Cyl Assy

1 nos Delivery: 45 days
#41

Single Element Fuel Pump oblique FIP

Single Element Fuel Pump oblique FIP

1 nos Delivery: 45 days
#42

Armature

Armature

5 nos Delivery: 45 days
#43

Air Filter

Air Filter

2 nos Delivery: 45 days
#44

AVR Plate

AVR Plate

3 nos Delivery: 45 days
#45

Big end cell

Big end cell

2 nos Delivery: 45 days
#46

Cylinder Head with inlet and exhaust valve

Cylinder Head with inlet and exhaust valve

1 nos Delivery: 45 days
#47

Cylinder bore

Cylinder bore

5 nos Delivery: 45 days
#48

Exhaust fan

Exhaust fan

2 nos Delivery: 45 days
#49

Fan Belt

Fan Belt

1 nos Delivery: 45 days
#50

Fuel pipe line tank to Feed Pump

Fuel pipe line tank to Feed Pump

3 nos Delivery: 45 days
#51

Fuel Filter

Fuel Filter

1 nos Delivery: 45 days
#52

Head Gasket

Head Gasket

2 nos Delivery: 45 days
#53

Injectors

Injectors

8 nos Delivery: 45 days
#54

Oil Filter

Oil Filter

5 nos Delivery: 45 days
#55

Packing kit

Packing kit

5 nos Delivery: 45 days
#56

Piston

Piston

1 nos Delivery: 45 days
#57

Pistion Assy

Pistion Assy

4 nos Delivery: 45 days
#58

Pistion Ring

Pistion Ring

4 nos Delivery: 45 days
#59

Push tube

Push tube

6 nos Delivery: 45 days
#60

Push Tube Seal

Push Tube Seal

5 nos Delivery: 45 days
#61

Push Rod

Push Rod

5 nos Delivery: 45 days
#62

Tappet Cover

Tappet Cover

7 nos Delivery: 45 days
#63

Air Filter

Air Filter

1 nos Delivery: 45 days
#64

AVR Plate

AVR Plate

1 nos Delivery: 45 days
#65

Big end cell

Big end cell

2 nos Delivery: 45 days
#66

Benjo nut

Benjo nut

5 nos Delivery: 45 days
#67

Cells

Cells

1 nos Delivery: 45 days
#68

Connecting Rod

Connecting Rod

5 nos Delivery: 45 days
#69

FIP

FIP

8 nos Delivery: 45 days
#70

Cylinder Head Assy

Cylinder Head Assy

6 nos Delivery: 45 days
#71

Engine Packing Kit

Engine Packing Kit

7 nos Delivery: 45 days
#72

Fuel Injection Pump

Fuel Injection Pump

1 nos Delivery: 45 days
#73

Fuel Pipe Line feed pump to FIP

Fuel Pipe Line feed pump to FIP

1 nos Delivery: 45 days
#74

Fuel Pipe Line tank to feed pump

Fuel Pipe Line tank to feed pump

1 nos Delivery: 45 days
#75

Fuel pipe line pump to filter

Fuel pipe line pump to filter

1 nos Delivery: 45 days
#76

Fuel feed pump

Fuel feed pump

3 nos Delivery: 45 days
#77

Head Gasket

Head Gasket

2 nos Delivery: 45 days
#78

Hose clamp

Hose clamp

2 nos Delivery: 45 days
#79

Injector

Injector

3 nos Delivery: 45 days
#80

Injector Assy

Injector Assy

2 nos Delivery: 45 days
#81

Injector Nozzle

Injector Nozzle

3 nos Delivery: 45 days
#82

Oil Filter

Oil Filter

2 nos Delivery: 45 days
#83

Over Flow Pipe Line

Over Flow Pipe Line

2 nos Delivery: 45 days
#84

Piston

Piston

1 nos Delivery: 45 days
#85

Piston Ring Set

Piston Ring Set

1 nos Delivery: 45 days
#86

Push Tube Seal

Push Tube Seal

5 nos Delivery: 45 days
#87

Rocker Arm Assy

Rocker Arm Assy

1 nos Delivery: 45 days
#88

Sleeve

Sleeve

3 nos Delivery: 45 days
#89

Tappet cover

Tappet cover

4 nos Delivery: 45 days
#90

Tappet Gasket

Tappet Gasket

9 nos Delivery: 45 days
#91

Tappet Gasket

Tappet Gasket

8 nos Delivery: 45 days
#92

Air filter

Air filter

5 nos Delivery: 45 days
#93

Big end cell

Big end cell

3 nos Delivery: 45 days
#94

Fuel Filter

Fuel Filter

4 nos Delivery: 45 days
#95

Head gasket

Head gasket

5 nos Delivery: 45 days
#96

Oil Filter

Oil Filter

4 nos Delivery: 45 days
#97

Packing kit

Packing kit

5 nos Delivery: 45 days
#98

Piston

Piston

5 nos Delivery: 45 days
#99

Piston Ring Set

Piston Ring Set

3 nos Delivery: 45 days
#100

Push tube Seal

Push tube Seal

9 nos Delivery: 45 days
#101

Turbo Charger

Turbo Charger

1 nos Delivery: 45 days
#102

Air Filter

Air Filter

3 nos Delivery: 45 days
#103

Cell

Cell

2 nos Delivery: 45 days
#104

Crank shaft

Crank shaft

1 nos Delivery: 45 days
#105

Fan Belt

Fan Belt

5 nos Delivery: 45 days
#106

Fuel Line Pipe

Fuel Line Pipe

5 nos Delivery: 45 days
#107

Fuel Pipe Tank to Pump

Fuel Pipe Tank to Pump

3 nos Delivery: 45 days
#108

Piston

Piston

1 nos Delivery: 45 days
#109

Turbo Charger

Turbo Charger

1 nos Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered products

6

Material Test Certificate

7

ISO 9001 certification (bidder or OEM)

8

OEM authorization (if applicable)

9

Bid submission as per Terms and ATC

Frequently Asked Questions

How to bid for Indian Army engine components tender in Rajasthan 2026

Bidders must meet ISO 9001 certification requirements, submit Data Sheet and Material Test Certificate, provide GSTIN and PAN, and furnish an EMD of ₹40,000. Include OEM authorizations if applicable, and ensure data sheet alignment with product specifications to avoid rejection.

What documents are required for Indian Army engine parts tender 2026

Required: PAN, GSTIN, Cancelled Cheque, EFT Mandate, Data Sheet for each offered item, Material Test Certificate, ISO 9001 certificate (bidder or OEM), OEM authorization if applicable, and bid as per ATC; ensure all certificates are uploaded.

What are the technical specifications for 109 items in Army BOQ

BOQ includes air filter, cylinder assemblies, fuel and oil system components, injectors, valves, gaskets, and related piping; exact quantities not disclosed in summary; data sheets and material tests critical for acceptance; supplier must align with IS/standards indicated by buyer lab results.

When is the EMD required for Army procurement of engine parts

EMD is ₹40,000 and must be submitted with bid as per vendor code creation; bidders may use DD or online payment; post-award, scanned DD may substitute for PBG with hard copy delivered within 15 days.

What are delivery terms for quantity variation in Army tender 2026

Purchaser may increase/decrease quantity up to 50% at contract placement; during currency, additional quantity delivery follows a formula linked to original period, minimum 30 days extension, based on original delivery schedule.

What compliance certifications are required for Indian Army engine parts

ISO 9001 certification is mandatory for bidder or OEM; material tests must pass buyer lab criteria; data sheets must match supplied product specifications; adherence to GeM ATC terms is essential.

What inspection regimes apply to Indian Army stores delivery

Inspection can be pre-dispatch at seller premises or post-receipt at consignee site by Board of Officer; testing and verification occur per ATC and supplier agreement; non-conformities may trigger rejection or required corrective actions.

How to ensure data sheet accuracy for Army engine parts

Upload Data Sheets that exactly match offered product specifications; any unexplained mismatch may lead to bid rejection; cross-verify with product datasheets and ensure OEM specifications align with requested items.