Active GEM

GEM Procurement SS Fittings and Elbow Valve Tender 2026 Rajasthan - ISM Brand Specifications & 25% Quantity Flexibility 2026

Bid Publish Date

24-Sep-2026, 2:51 pm

Bid End Date

19-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue24-Sep-2026, 2:51 pm
Corrigendum12-Oct-2026
AwardPending

Key Highlights

  • • Brand/model specificity required for SS fittings and elbow valves
  • • Material Test Certificate mandatory with supply
  • • Delivery penalty: 0.5% per week, up to 5% total
  • • Quantity fluctuation allowed up to 25% during contract

Tender Overview

The procurement opportunity is issued on the Government e-Marketplace (GEM) for SS fittings and elbow valves, with brand/model specificity and material test certificate requirements. The tender contemplates fixed principles for quantity adjustments up to 25% at contract placement and again during the currency of the contract, subject to original rates. Delivery terms begin after the last delivery order date, with an extended period if the option is exercised, and a minimum extension equivalent to 30 days. The scope emphasizes adherence to the enquiry and drawing, and acceptance hinges on the bidder providing the exact make/model specified. Competitive advantage arises from strict conformance to brand/technical criteria and timely delivery.

Technical Specifications & Requirements

  • Product focus: SS fittings and elbow valve as per enquiry drawing; only specified make/brand/model acceptable.
  • Documentation: mandatory Material Test Certificate with supply; samples/inspections to be conducted by buyer’s lab; results govern acceptance.
  • Quality controls: deviations result in material return and potential deduction from final payment; seal & sign on tender documents required.
  • Delivery risk: liquidated damages at 0.5% per week for delays, up to a 5% maximum; penalty recovered for incomplete material.
  • Quantity flexibility: purchaser may increase/decrease material quantity by up to 25% during contract; additional time calculated per clause, minimum 30 days.
  • Payment: terms to follow GEM rules; ensure compliance with bid terms and drawing concordance.

Terms, Conditions & Eligibility

  • Mandatory adherence to enquiry drawings; only approved brand/model accepted; deviations trigger penalties.
  • Delivery timeline: as per contract; penalties apply for late delivery; material inspection governs acceptance.
  • Financial health: bidder must not be in liquidation or similar proceedings; sign/turple bids to avoid disqualification.
  • Compliance: seal and sign tender documents; any technical deviations may cause disqualification; right to adjust quantity within 6 months of order finalization.
  • Documentation: submit GST, PAN, MIC/MA certificates, material test certificates, OEM authorizations if applicable, and financial statements as per GEM rules.

Key Specifications

    • Product: SS fittings and elbow valve
    • Brand/Model: Only the brand/model specified in enquiry/drawings is acceptable
    • Quality: Material Test Certificate to accompany supply
    • Standards/Testing: Buyer’s lab to test material; acceptance based on lab results
    • Delivery: Penalty for delay at 0.5% per week up to 5% total
    • Quantity flexibility: Up to 25% increase/decrease during contract
    • Payment: Per GEM rules; terms synchronized with delivery and acceptance

Terms & Conditions

  • Quantity may be increased or decreased by up to 25% at contract finalization and during the contract period

  • Material Test Certificate mandatory; material verified by buyer’s lab with acceptance criteria

  • Penalties for late delivery: 0.5% per week, up to 5% total; deviations trigger payment deductions

Important Clauses

Payment Terms

Payments to follow GEM rules; ensure alignment with delivery and acceptance milestones

Delivery Schedule

Delivery period commences from last date of original delivery order; option-driven extensions with minimum 30 days

Penalties/Liquidated Damages

LD at 0.5% per week of total contract value, capped at 5% for incomplete/ undeveloped material

Bidder Eligibility

  • Not in liquidation, court receiver ship, or similar proceedings

  • Ability to meet brand/model specifications exactly as per enquiry drawings

  • Demonstrated experience in supplying stainless steel fittings and valves

Advertisement

Tender Data

Bid Details

Quantity

383

Bid Type

Service

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Delivery Details

Delivery Locations

1

Delivery Cities

Aurangabad

Delivery Pincodes

431006

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
MOHANPRABHU M431006,H2,MIDC,ChikalthanaAurangabadMaharashtra4310066--

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9941127.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

2 Updates
#1

Update

12-Oct-2026

Extended Deadline

19-Oct-2026, 9:30 am

Opening Date

20-Oct-2026, 9:30 am

#2

Update

05-Oct-2026

Extended Deadline

12-Oct-2026, 9:30 am

Opening Date

13-Oct-2026, 9:30 am

Advertisement

Bill of Quantities (BOQ) 29 Items Sign in for GEM prices

#1

ELBOW A1 1 BY 2 INCH BSP FEMALE S

ELBOW A1 1 BY 2 INCH BSP FEMALE S

6 nos Delivery: 15 days
#2

ELBOW A1 3 BY 4 INCH BSP FEMALE Z

ELBOW A1 3 BY 4 INCH BSP FEMALE Z

5 nos Delivery: 15 days
#3

G.I. TEE 1 BY 2 INCH EQUAL

G.I. TEE 1 BY 2 INCH EQUAL

6 nos Delivery: 15 days
#4

SOCKET 1 BY 2 INCH BSP Z

SOCKET 1 BY 2 INCH BSP Z

5 nos Delivery: 15 days
#5

PIPE 25 SMS AISI 304 DIA 25 X 1.2 INSIDE PICKLED AND O BY SIDE POLISHED

PIPE 25 SMS AISI 304 DIA 25 X 1.2 INSIDE PICKLED AND O BY SIDE POLISHED

6 mtr Delivery: 15 days
#6

PIPE 38 SMS AISI 304 DIA 38 X 1.2 INSIDE PICKLED AND O BY SIDE POLISHED

PIPE 38 SMS AISI 304 DIA 38 X 1.2 INSIDE PICKLED AND O BY SIDE POLISHED

12 mtr Delivery: 15 days
#7

51 SMS LINER

51 SMS LINER

50 nos Delivery: 15 days
#8

38 SMS MALE PART

38 SMS MALE PART

25 nos Delivery: 15 days
#9

51 SMS NUT

51 SMS NUT

50 nos Delivery: 15 days
#10

63.5 SMS NUT

63.5 SMS NUT

25 nos Delivery: 15 days
#11

3 WAY VALVE WITH UNION 51 SMS

3 WAY VALVE WITH UNION 51 SMS

2 nos Delivery: 15 days
#12

FLOW DIVERSION VALVE FD38 MAKE. SHREE PUMP LL TYPE 3VAY WITH SMS UNION CONTROL CAPE AND 2 NOS MICRO SWITCHES WITHOUT SOLENOID VALVE

FLOW DIVERSION VALVE FD38 MAKE. SHREE PUMP LL TYPE 3VAY WITH SMS UNION CONTROL CAPE AND 2 NOS MICRO SWITCHES WITHOUT SOLENOID VALVE

1 nos Delivery: 15 days
#13

FLOW DIVERSION VALVE FD51 MAKE. SRI PUMP LL TYPE 3VAY WITH SMS UNION CONTROL CAPE AND 2 NOS MICRO SWITCHES WITHOUT SOLENOID VALVE

FLOW DIVERSION VALVE FD51 MAKE. SRI PUMP LL TYPE 3VAY WITH SMS UNION CONTROL CAPE AND 2 NOS MICRO SWITCHES WITHOUT SOLENOID VALVE

1 nos Delivery: 15 days
#14

AISI 304 BEND 51 SMS

AISI 304 BEND 51 SMS

50 nos Delivery: 15 days
#15

GLOBE VALVE A 1 BY 2 INCH GM

GLOBE VALVE A 1 BY 2 INCH GM

6 nos Delivery: 15 days
#16

GLOBE VALVE 2 INCH GM B CLASS

GLOBE VALVE 2 INCH GM B CLASS

5 nos Delivery: 15 days
#17

STEAM STOP VALVE 2 INCH FLANGED

STEAM STOP VALVE 2 INCH FLANGED

6 nos Delivery: 15 days
#18

STEAM DIAPHARM CONTROL VALVE 2 INCH FLANGED

STEAM DIAPHARM CONTROL VALVE 2 INCH FLANGED

2 nos Delivery: 15 days
#19

POP TYPE SAFETY VALVE 1BY2 INCH

POP TYPE SAFETY VALVE 1BY2 INCH

2 nos Delivery: 15 days
#20

NON RETURN VALVE GM 2 INCH

NON RETURN VALVE GM 2 INCH

2 nos Delivery: 15 days
#21

G.I. NIPPLE 1BY2 INCH X 4 INCH

G.I. NIPPLE 1BY2 INCH X 4 INCH

12 nos Delivery: 15 days
#22

G.I. NIPPLE 1BY2 INCH X 2 INCH

G.I. NIPPLE 1BY2 INCH X 2 INCH

12 nos Delivery: 15 days
#23

2 INCH M.S. PIPE CLASS B

2 INCH M.S. PIPE CLASS B

12 mtr Delivery: 15 days
#24

T PIECE 2 INCH M.S. CLASS B

T PIECE 2 INCH M.S. CLASS B

6 nos Delivery: 15 days
#25

STRAINER 1BY2 INCH Y

STRAINER 1BY2 INCH Y

2 nos Delivery: 15 days
#26

M.S. LONG BEND 2 INCH CLASS B

M.S. LONG BEND 2 INCH CLASS B

6 nos Delivery: 15 days
#27

51 SMS AISI 304 DISC TYPE INLINE FILTER WITH UNION

51 SMS AISI 304 DISC TYPE INLINE FILTER WITH UNION

1 nos Delivery: 15 days
#28

MACHINE THERMOMETER 10 degrees TO 100 degrees C

MACHINE THERMOMETER 10 degrees TO 100 degrees C

15 nos Delivery: 15 days
#29

H D P TUBE 6 MM MAKE.LEGRIS.

H D P TUBE 6 MM MAKE.LEGRIS.

50 mtr Delivery: 15 days

Categories 37

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates in similar stainless steel fittings supply

4

Financial statements demonstrating financial capability

5

Material Test Certificates (MTC) with each supply

6

OEM authorization / dealer authorization (if applicable to specified brand)

7

Technical bid documents showing compliance with drawings and brand/model

8

Seal and sign pages of tender documents

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

What are the eligibility criteria for SS fittings tender in Rajasthan 2026?

Bidders must not be in liquidation, provide GST and PAN, submit financial statements, OEM/brand authorizations if required, and demonstrate prior experience supplying stainless steel fittings. Compliance with enquiry drawings and the Material Test Certificate is mandatory for acceptance, along with sign/seal on tender documents.

What documents are required for SS fittings tender submission in Rajasthan 2026?

Required documents include GST certificate, PAN card, experience certificates for similar work, financial statements, Material Test Certificates, OEM authorizations, technical bid evidence of conformity to drawings, and sealed tender document pages. Ensure all documents are current and aligned with GEM submission rules.

How is delivery time and penalties structured for delays in this tender?

Delivery penalties are 0.5% of total value per week of delay, capped at 5%. The delivery period begins after the last delivery order date, with extension available if the option clause is exercised. Minimum extension is 30 days; increased quantity can extend delivery duration accordingly.

What technical standards apply to SS fittings and elbow valves in this bid?

The tender requires conformance to the enquiry drawings with exact brand/model; material to be tested by buyer’s lab; acceptance based on Material Test Certificate results. Only approved make/model is acceptable; deviations may trigger payment deductions and disqualification.

What is the role of the Material Test Certificate in this procurement?

The Material Test Certificate accompanies each supply and will be inspected by the buyer’s lab. Acceptance hinges on lab results; deviations or damaged material lead to returns and possible payment deductions. Ensure MTCs are prepared per the specified brand/model.

How can bidders prepare for quantity fluctuations under this GEM tender?

Bidders should price for the possibility of up to a 25% quantity increase or decrease at contract finalization and during the contract term. Delivery schedules may adjust accordingly with a minimum 30-day extension, ensuring alignment with the original delivery period.

What is required to ensure compliance with brand/model specificity in this tender?

Only the brand/model specified in the enquiry/drawings will be accepted. Any deviation detected in the technical bid can lead to disqualification and payment penalties; ensure all submissions include the exact product details and seal/signed tender pages.

How does GEM payment policy affect SS fittings supply contracts 2026?

Payments follow GEM rules; ensure alignment with delivery milestones and acceptance criteria. Include Material Test Certificate data, keep records of inspections, and ensure smooth submission of all required financial and technical documents to avoid payment delays.