RF RADIO (MASTER)
Indian Air Force
Bid Publish Date
18-Nov-2025, 4:37 pm
Bid End Date
28-Nov-2025, 5:00 pm
Bid Opening Date
28-Nov-2025, 5:30 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Indian Coast Guard, a department of defence, seeks a wireless master and slave standalone GPS clock with selectable GMT or IST time adjustment control. The procurement location is Port Blair, Andaman and Nicobar Islands, with delivery to MRCC Port Blair. While the estimated value and start/end dates are not disclosed, the buyer emphasizes non-obsolescence with at least 3 years residual market life and strict certificate requirements. A key differentiator is the time-adjustment capability between GMT and IST, ensuring synchronized operations across coastal command centers. The tender includes GST compliance, vendor-code creation, and a robust documentation package. Unique terms include a flexible quantity option clause and mandatory pre-qualification certificates. This opportunity targets government defence procurement channels and requires up-to-date OEM or equivalent technology, timely installation, and post-delivery support.
Product name: Wireless master and slave standalone GPS clock with selectable GMT or IST time adjustment control
Delivery location: The Officer-in-Charge, MRCC Port Blair, C/o CGRHQ(A&N), Haddo Post, Sri Vijaya Puram, Andaman and Nicobar Islands-744102
Qualification: Minimum 3 years residual market life; non-obsolescence requirement
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor-code creation
GST terms: Reimbursement as actuals or applicable rate (whichever is lower) up to quoted GST %
Delivery flexibility: Option to increase quantity up to 25% with corresponding delivery time adjustments
Warranty/Support: Not explicitly specified; verify post-delivery support expectations
Option quantity clause allows up to 25% increase during contract with adjusted delivery time
Must maintain product with at least 3 years of residual market life
GST handling limited to actual or applicable rate, capped by quoted GST
GST reimbursement as actuals or applicable rate; payment terms not explicitly defined in data; verify in bid documents
Delivery starts from last date of original delivery order; option to extend delivery period with a minimum 30 days; increased time proportional to (increased quantity/original quantity) × original delivery period
Not specified in available data; confirm LD/penalties in formal tender terms
Not under liquidation, court receivership, or bankruptcy
Must provide PAN, GSTIN, EFT Mandate and required OEM/auth certificates
GI/Coast Guard delivery address verification and installation capability
Indian Air Force
Central Power Research Institute (cpri) Bangalore Karnataka
BANGALORE, KARNATAKA
Nmdc Limited
BELLARY, KARNATAKA
Indian Oil Corporation Limited
MATHURA, UTTAR PRADESH
Directorate Of Purchase And Stores
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
GST compliance declaration with applicable GST rate
Undertaking of financial standing (no liquidation or bankruptcy)
OEM authorization or certificate for GPS clock system
Any certificates referenced in Bid Document/ATC/Corrigendum
Key insights about ANDAMAN & NICOBAR tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and OEM authorizations along with the technical bid. Ensure the product is non-obsolete with at least 3 years residual market life and provide GST details; delivery is to MRCC Port Blair with ISA/GMT IST adjustment features.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, OEM authorization, and certificates referenced in ATC/Corrigendum; bidders must upload these to participate and create a vendor code before submission.
The clock must be a wireless master-slave standalone GPS clock with selectable GMT or IST time adjustment control; ensure non-obsolescence with 3-year residual market life; ensure OEM or equivalent certification and timely installation at MRCC Port Blair.
Delivery period starts from the last date of the original delivery order; option to extend with 30-day minimum; increased quantity adjusts the delivery time proportionally as per contract terms.
GST reimbursement will be as per actuals or applicable rate, whichever is lower, up to the maximum quoted GST percentage; bidders must ensure GST compliance and reflect correct GST in bids.
Eligible bidders must demonstrate non-liquidation status, possess PAN and GSTIN, provide EFT Mandate, and have OEM authorization; product must meet 3-year residual market life and be non-obsolete at the time of bid.
Access all tender documents at no cost
Main Document
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS