Bid Publish Date
06-Oct-2026, 9:14 pm
Bid End Date
16-Oct-2026, 9:00 pm
Location
Progress
The Urban Development Department of Uttar Pradesh invites bids for a Vehicle Mountable Fogging Machine - Pulse Jet Type (V3), conforming to IS 14855 (Part 1) – Q2. Located in KUSHINAGAR, UTTAR PRADESH 274149, this procurement covers supply, installation, testing and commissioning of the fogging system. The contract contemplates a potential 25% quantity variation at bid and contracted quantities, with extension rules tied to original delivery periods and minimum 30 days. Bidders must demonstrate financial stability and satisfy turnover criteria per tender terms. Unique aspects include the OEM turnover criterion and the emphasis on IS 14855 compliance.
Option Clause allows ±25% quantity variation at contract placement and during currency
Delivery period adjustments calculated as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Bidder must not be under liquidation or bankruptcy; provide undertaking
Supply-Installation-Testing-Commissioning scope included
Separate OEM turnover requirements apply for the primary product category
Turnover evidence must be provided via audited statements or CA certificates
Delivery period starts from the last date of original delivery order; extended time proportional to quantity variation, with a minimum 30 days
Not explicitly stated in data; bidders should expect standard government terms per contract; verify during bid submission
Not explicitly stated; check tender terms for LD provisions tied to delivery/installation milestones
Proven turnover: minimum average annual turnover over last 3 years as per bid document
OEM turnover requirement for primary product category
No liquidation, court receivership, or bankruptcy proceedings; provide undertaking
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
OEM Avg. Turnover
5
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Vehicle Mountable Fogging Machine- Pulse Jet Type (V3) Conforming to IS 14855 (Part 1) (Q2)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kushi Nagar
Delivery Pincodes
274401
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shubham Kumar Mishra | 274401,NAGAR PANCHAYAT FAZILNAGAR | Kushi Nagar | Uttar Pradesh | 274401 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Audited Balance Sheets for last 3 financial years or CA/CMA turnover certificate
CA/Cost Accountant certificate indicating turnover details
Bidder undertaking confirming no liquidation or bankruptcy
Technical bid documents demonstrating IS 14855 (Part 1) compliance
OEM authorization or credentials (if applicable) for primary product
Evidence of meeting OEM turnover criteria (where required)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, turnover proof (audited balance sheets or CA certificate), and OEM authorization if required. Ensure IS 14855 (Part 1) compliance for the V3 pulse jet fogging machine, and demonstrate non-liquidation status. The bid includes SITC (supply, installation, testing and commissioning).
Required documents include GST certificate, PAN card, 3-year turnover proof, CA-certified turnover, audited balance sheets, undertaking of non-liquidation, OEM authorization (if applicable), and technical certificates proving IS 14855 compliance for the V3 system.
The key standard is IS 14855 (Part 1) – Q2. Bidders must show conformity to this standard for fogging performance and safety. Ensure technical specs and installation compatibility with vehicle mounting as per tender terms.
Scope includes Supply, Installation, Testing and Commissioning of the fogging system, with possible quantity variation up to 25% at contract, and delivery time adjustments based on the original delivery period.
OEM turnover must meet the minimum average annual turnover stated in the bid document for the last 3 years; in case of a bunch bid, the OEM of the highest bid value must satisfy this criterion with supporting audited or CA-certified turnover records.
Delivery extensions apply when quantity increases up to 25%; the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Payment terms are not explicitly stated in the data; bidders should anticipate standard government terms within the contract and verify during bid submission, including milestone-based payments aligned with SITC progress.
Obtain manufacturer technical literature and certification demonstrating IS 14855 (Part 1) – Q2 compliance, plus any OEM installation manuals. Include test reports or third-party conformity evidence as part of the technical bid.