TenderDekho Logo
Active GEM

Indian Army Kitchen Utensils Procurement Bhopal Madhya Pradesh ISO 9001 2026

Bid Publish Date

08-Aug-2026, 1:22 pm

Bid End Date

03-Sep-2026, 7:00 pm

Generate Docs

Progress

Issue08-Aug-2026, 1:22 pm
Corrigendum20-Aug-2026
AwardPending

Tender Overview

Indian Army invites bids for a broad range of culinary and related items to support accommodation facilities in Bhopal, Madhya Pradesh. The procurement includes **Convection Kerosene Heaters, Solar Street Light 25W, Pressure Stoves, Pressure Cookers (10L & 5L), Patila varieties, kitchenware (tawa, kadai, chammchas), utensils and crockery, bedding, furniture racks, cleaning supplies, safety gear (ABC extinguisher 4 kg), and misc. store items across 74 BoQ entries. The scope emphasizes comprehensive supply for mess and dormitory facilities, with multiple SKU families under a single tender. Key differentiators include mandatory quality controls and ISO standards adherence. The tender emphasizes supplier capability to furnish Material Test Certificates and comply with GST terms; no explicit start/end dates are provided here. The opportunity targets suppliers capable of delivering a wide assortment of kitchen and household items to military premises in the target city.

Technical Specifications & Requirements

  • Standards: ISO 9001 certification required (bidder or OEM).
  • Quality documents: Material Test Certificate to accompany supply; buyer lab tests will determine acceptance.
  • GST: GST applicability as per bidder’s rates; reimbursement as per actuals or applicable rates, whichever is lower.
  • Scope indicators: BOQ comprises 74 items including kitchen equipment, utensils, bedding, furniture, and misc. Household goods.
  • Document expectations: OEM authorizations may be required; ensure compliance with national procurement norms.
  • Delivery/installation: Not explicitly detailed in provided data; implications point to standard supply chain and handover procedures.

Terms & Eligibility

  • Financial standing: Bidder must not be under liquidation or bankruptcy; undertaking required.
  • Certification: ISO 9001 certification mandatory for bidder or OEM.
  • Quality traceability: Material Test Certificate mandatory with each supply; laboratory results govern acceptance.
  • GST: Bidder responsible for GST; reimbursement aligned to actuals or lower applicable rate.
  • ATC/ATC file: Buyer has uploaded specific ATC; bidders should review prior to submission.
  • General compliance: Bidders to ensure GST, PAN, and standard statutory documentation as per terms.

Key Specifications

  • ISO 9001 certification required for bidder or OEM

  • Material Test Certificate to accompany supply; buyer lab determines acceptance

  • GST applicability per bidder; reimbursement as actuals or lower rate

  • BOQ contains 74 items spanning kitchen/household goods, bedding, furniture, and safety items

  • Exact item-level standards not individually specified; rely on ISO 9001 and MTQ as quality gate

Terms & Conditions

  • ISO 9001 certification mandatory for bidder or OEM

  • Material Test Certificate required with supply and subject to lab verification

  • GST terms govern tax treatment and reimbursement based on rates

Important Clauses

Payment Terms

GST and payment terms to be as per bidder’s rate; reimbursement of GST as actuals or applicable lower rate; no explicit advance mentioned in provided data.

Delivery Schedule

Delivery Timelines not explicitly specified in data; standard supply and handover procedures implied; check ATC document for any schedule nuances.

Penalties/Liquidated Damages

No explicit penalty clauses listed in provided data; verify in ATC and tender terms during bidder review.

Bidder Eligibility

  • Not under liquidation or court receivership

  • ISO 9001 certification (bidder or OEM)

  • Ability to provide Material Test Certificate with supply

Tender Data

Bid Details

Quantity

465

Category

CONVECTION KEROSENE HEATER

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

20

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CONVECTION KEROSENE HEATER , SOLAR STREET LIGHT 25W , KEROSENE PRESSURE STOVE 8 INCH BURNER , PRESSURE COOKER 10L , PRESSURE COOKER 5L , PATILA WITH LID LARGE , PATILA WITH LID MEDIUM , PATILA WITH LID SMALL , FRYING PAN KADHAI LARGE , FRYING PAN TAWA FLAT , TEA PAN BHAGONA , SAUCEPAN WITH LID , FULL PLATE SS THALI , QUARTER PLATE SIDE PLATE , BOWL KATORI , GLASS SS TUMBLER , SPOON TABLE , FORK , SERVING SPOON LARGE , SERVING LADLE KARCHI , RICE SERVING PLATE , SALAD SERVING PLATE , SERVING DONGA WITH LID , TEA STRAINER , CUTTING BOARD , KITCHEN KNIFE LARGE , KITCHEN KNIFE SMALL , PEELER VEGETABLE , ROLLING PIN BELAN , CHAPATI BOARD CHAKLA , CHIMTA TONGS , JHARA SLOTTED TURNER , COLANDER CHHALNI , WATER CONTAINER MATKA CAN , UTENSIL STORAGE RACK , JERRY CAN KEROSENE , MATCHBOX , DISHWASH LIQUID , SCRUB PAD GREEN , KITCHEN TOWEL CLOTH , BUNK BED MS ANGLE FRAME , MATTRESS SINGLE BED , BED SHEET SINGLE , PILLOW , BLANKET SINGLE BED , PLASTIC CHAIR , FOLDING TABLE , MS ALMIRAH , WALL MOUNT SHELF , COAT HOOK RACK WALL , DUSTBIN LARGE , DUSTBIN SMALL , BROOM INDOOR , BROOM OUTDOOR , DUSTPAN LONG HANDLE , MOP WET COTTON , MOP BUCKET , FLOOR CLEANER LIQUID , PHENYL DISINFECTANT , TOILET CLEANER , DISH TOWEL POCHHA , ABC FIRE EXTINGUISHER 4 KG , FIRST AID KIT , FOOT MAT COIR , NAME BOARD FLEX , INFORMATION BOARD FLEX , BUCKET PLASTIC , MUG PLASTIC , ROPE NYLON , PADLOCK 65MM , TORCH LED , CANDLE PACKET , D CELL BATTERY , KEROSENE INITIAL STOCK

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Bhopal

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BhopalBhopal--3180-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9472114.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

20-Aug-2026

Extended Deadline

31-Aug-2026, 1:30 pm

Opening Date

31-Aug-2026, 2:00 pm

Bill of Quantities (BOQ) 74 Items Sign in for GEM prices

#1

CONVECTION KEROSENE HEATER

AS PER ATC

3 number Delivery: 180 days
#2

SOLAR STREET LIGHT 25W

AS PER ATC

2 number Delivery: 180 days
#3

KEROSENE PRESSURE STOVE 8 INCH BURNER

AS PER ATC

2 number Delivery: 180 days
#4

PRESSURE COOKER 10L

AS PER ATC

1 number Delivery: 180 days
#5

PRESSURE COOKER 5L

AS PER ATC

1 number Delivery: 180 days
#6

PATILA WITH LID LARGE

AS PER ATC

1 number Delivery: 180 days
#7

PATILA WITH LID MEDIUM

AS PER ATC

1 number Delivery: 180 days
#8

PATILA WITH LID SMALL

AS PER ATC

1 number Delivery: 180 days
#9

FRYING PAN KADHAI LARGE

AS PER ATC

1 number Delivery: 180 days
#10

FRYING PAN TAWA FLAT

AS PER ATC

1 number Delivery: 180 days
#11

TEA PAN BHAGONA

AS PER ATC

1 number Delivery: 180 days
#12

SAUCEPAN WITH LID

AS PER ATC

1 number Delivery: 180 days
#13

FULL PLATE SS THALI

AS PER ATC

24 number Delivery: 180 days
#14

QUARTER PLATE SIDE PLATE

AS PER ATC

24 number Delivery: 180 days
#15

BOWL KATORI

AS PER ATC

24 number Delivery: 180 days
#16

GLASS SS TUMBLER

AS PER ATC

30 number Delivery: 180 days
#17

SPOON TABLE

AS PER ATC

24 number Delivery: 180 days
#18

FORK

AS PER ATC

24 number Delivery: 180 days
#19

SERVING SPOON LARGE

AS PER ATC

4 number Delivery: 180 days
#20

SERVING LADLE KARCHI

AS PER ATC

2 number Delivery: 180 days
#21

RICE SERVING PLATE

AS PER ATC

1 number Delivery: 180 days
#22

SALAD SERVING PLATE

AS PER ATC

1 number Delivery: 180 days
#23

SERVING DONGA WITH LID

AS PER ATC

2 number Delivery: 180 days
#24

TEA STRAINER

AS PER ATC

2 number Delivery: 180 days
#25

CUTTING BOARD

AS PER ATC

1 number Delivery: 180 days
#26

KITCHEN KNIFE LARGE

AS PER ATC

1 number Delivery: 180 days
#27

KITCHEN KNIFE SMALL

AS PER ATC

1 number Delivery: 180 days
#28

PEELER VEGETABLE

AS PER ATC

1 number Delivery: 180 days
#29

ROLLING PIN BELAN

AS PER ATC

1 number Delivery: 180 days
#30

CHAPATI BOARD CHAKLA

AS PER ATC

1 number Delivery: 180 days
#31

CHIMTA TONGS

AS PER ATC

2 number Delivery: 180 days
#32

JHARA SLOTTED TURNER

AS PER ATC

1 number Delivery: 180 days
#33

COLANDER CHHALNI

AS PER ATC

1 number Delivery: 180 days
#34

WATER CONTAINER MATKA CAN

AS PER ATC

1 number Delivery: 180 days
#35

UTENSIL STORAGE RACK

AS PER ATC

1 number Delivery: 180 days
#36

JERRY CAN KEROSENE

AS PER ATC

2 number Delivery: 180 days
#37

MATCHBOX

AS PER ATC

2 pack Delivery: 180 days
#38

DISHWASH LIQUID

AS PER ATC

3 number Delivery: 180 days
#39

SCRUB PAD GREEN

AS PER ATC

3 pack Delivery: 180 days
#40

KITCHEN TOWEL CLOTH

AS PER ATC

6 number Delivery: 180 days
#41

BUNK BED MS ANGLE FRAME

AS PER ATC

10 number Delivery: 180 days
#42

MATTRESS SINGLE BED

AS PER ATC

20 number Delivery: 180 days
#43

BED SHEET SINGLE

AS PER ATC

20 number Delivery: 180 days
#44

PILLOW

AS PER ATC

20 number Delivery: 180 days
#45

BLANKET SINGLE BED

AS PER ATC

3 number Delivery: 180 days
#46

PLASTIC CHAIR

AS PER ATC

20 number Delivery: 180 days
#47

FOLDING TABLE

AS PER ATC

2 number Delivery: 180 days
#48

MS ALMIRAH

AS PER ATC

1 number Delivery: 180 days
#49

WALL MOUNT SHELF

AS PER ATC

2 number Delivery: 180 days
#50

COAT HOOK RACK WALL

AS PER ATC

2 number Delivery: 180 days
#51

DUSTBIN LARGE

AS PER ATC

2 number Delivery: 180 days
#52

DUSTBIN SMALL

AS PER ATC

1 number Delivery: 180 days
#53

BROOM INDOOR

AS PER ATC

3 number Delivery: 180 days
#54

BROOM OUTDOOR

AS PER ATC

2 number Delivery: 180 days
#55

DUSTPAN LONG HANDLE

AS PER ATC

2 number Delivery: 180 days
#56

MOP WET COTTON

AS PER ATC

2 number Delivery: 180 days
#57

MOP BUCKET

AS PER ATC

1 number Delivery: 180 days
#58

FLOOR CLEANER LIQUID

AS PER ATC

2 can Delivery: 180 days
#59

PHENYL DISINFECTANT

AS PER ATC

3 number Delivery: 180 days
#60

TOILET CLEANER

AS PER ATC

6 number Delivery: 180 days
#61

DISH TOWEL POCHHA

AS PER ATC

4 number Delivery: 180 days
#62

ABC FIRE EXTINGUISHER 4 KG

AS PER ATC

2 number Delivery: 180 days
#63

FIRST AID KIT

AS PER ATC

1 number Delivery: 180 days
#64

FOOT MAT COIR

AS PER ATC

2 number Delivery: 180 days
#65

NAME BOARD FLEX

AS PER ATC

1 number Delivery: 180 days
#66

INFORMATION BOARD FLEX

AS PER ATC

1 number Delivery: 180 days
#67

BUCKET PLASTIC

AS PER ATC

4 number Delivery: 180 days
#68

MUG PLASTIC

AS PER ATC

4 number Delivery: 180 days
#69

ROPE NYLON

AS PER ATC

1 number Delivery: 180 days
#70

PADLOCK 65MM

AS PER ATC

2 number Delivery: 180 days
#71

TORCH LED

AS PER ATC

2 number Delivery: 180 days
#72

CANDLE PACKET

AS PER ATC

5 pack Delivery: 180 days
#73

D CELL BATTERY

AS PER ATC

6 pzir Delivery: 180 days
#74

KEROSENE INITIAL STOCK

AS PER ATC

100 litres Delivery: 180 days

Categories 40

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements (last 2-3 years)

5

EMD/Security deposit (as applicable by tender terms)

6

ISO 9001 certification ( bidder or OEM )

7

Material Test Certificate for supplied items

8

OEM authorization letter (where applicable)

9

Technical compliance certificates and product specifications

10

Bid submission undertakings (no liquidation or bankruptcy)

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for Indian Army kitchen utensils tender in Bhopal 2026 with ISO 9001?

Bidders must satisfy eligibility: not in liquidation, possess ISO 9001 (bidder or OEM), and provide a Material Test Certificate with every supply. Submit GST details, PAN, and financials; review the ATC for specific submission formats. Ensure 74-item BOQ categories are addressed with compliant products.

What documents are required for Indian Army kitchen equipment bid in MP?

Required documents include GST registration, PAN, experience certificates, two to three years financial statements, ISO 9001 certificate, Material Test Certificates, OEM authorization if applicable, and technical compliance certificates. Prepare bid undertakings and ensure lab-based MTQ acceptance criteria are met.

What standards and certifications must be met for kitchen items tender?

At minimum, ISO 9001 certification is required for bidder or OEM. Each lot must include Material Test Certificates. The tender also notes GST applicability and proper documentation; ensure compliance with the ISI mark where relevant and rely on MTQ for acceptance of items.

When is delivery expected for Indian Army procurement in Bhopal?

Exact delivery timelines are not specified in the provided data; consult the ATC and official tender documents for schedule, milestones, and potential penalties. Plan for staged deliveries aligned with the 74-item BoQ to minimize risk and ensure inspection readiness.

What are the EMD and payment terms for this tender in MP?

EMD details are not disclosed in the provided data; payment terms emphasize GST treatment and MT Certificate requirements. Verify EMD amount in the ATC, and ensure GST and tax compliance per bidder’s rate; prepare security deposit as required by the tender.

How to ensure Material Test Certificate compliance for Army supply?

Obtain MT Certificates from accredited labs; attach MT certificates with every shipment; ensure lab results align with buyer acceptance criteria. Include MTQ documentation in the technical bid and ensure product traceability for all 74 BoQ items.

What is the scope of items in the BoQ for this procurement?

BoQ comprises 74 items across kitchen utensils, cookware, bedding, furniture, storage, cleaning and safety goods, and miscellaneous items. While item-level specs are not detailed, suppliers must cover broad categories from convection heaters to bunk beds and kitchenware.

What is the GST handling approach for this Army tender in MP?

GST applicability rests with the bidder; reimbursement will be based on actual GST or the lower applicable rate, capped by the quoted GST percentage. Ensure GST compliance in pricing and submit GST registration details and invoices accordingly.