TenderDekho Logo
Closed GEM

Bids are Invited For Supply of Two cylinders Gas cabinet,ITC of Two cylinders Gas cabinet,Supply of Two cylinders Gas ca in Mohali, PUNJAB

Bid Publish Date

05-Feb-2025, 4:49 pm

Bid End Date

10-Apr-2025, 3:00 pm

EMD

₹15,73,405

Generate Docs

Progress

Issue05-Feb-2025, 4:49 pm
Technical03-May-2025, 12:46 pm
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

6316

Categories 91

Semiconductor Laboratory announces a tender for Supply of Two cylinders Gas cabinet, ITC of Two cylinders Gas cabinet, Supply of Two cylinders Gas ca in Mohali, PUNJAB. Quantity: 6316. Submission Deadline: 10-04-2025 15: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7478749.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 172 Items Sign in for GEM prices

#1

Supply of Two cylinders Gas cabinet

Supply of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 10 % Germane in Hydrogen

1 no Delivery: 60 days
#2

ITC of Two cylinders Gas cabinet

Installation, Testing and Commissioning of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 10 % Germane in Hydrogen

1 no Delivery: 60 days
#3

Supply of Two cylinders Gas cabinet

Supply of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Mono Methylsilane in Hydrogen

1 no Delivery: 60 days
#4

ITC of Two cylinders Gas cabinet

Installation, Testing and Commissioning of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Mono Methylsilane in Hydrogen

1 no Delivery: 60 days
#5

Supply of Two cylinders Gas cabinet

Supply of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Phosphine in Hydrogen

1 no Delivery: 60 days
#6

ITC of Two cylinders Gas cabinet

Installation, Testing and Commissioning of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Phosphine in Hydrogen

1 no Delivery: 60 days
#7

Supply of Two cylinders Gas cabinet

Supply of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Diborane in Hydrogen

1 no Delivery: 60 days
#8

ITC of Two cylinders Gas cabinet

Installation, Testing and Commissioning of Two cylinders Gas cabinet 1 process plus 1 purge including purifier gas cabinet with automatic purge for supplying high purity gas 1% Diborane in Hydrogen

1 no Delivery: 60 days
#9

Supply of Automatic Valve Manifold Boxes

Supply of Automatic Valve Manifold Boxes VMB with 3 Valve sticks Distribution sticks for supplying high purity 100% Dichlorosilane

1 no Delivery: 60 days
#10

ITC of Automatic Valve Manifold Boxes

Installation, Testing and Commissioning of Automatic Valve Manifold Boxes VMB with 3 Valve sticks Distribution sticks for supplying high purity 100% Dichlorosilane

1 no Delivery: 60 days
#11

Supply of Automatic Valve Manifold Boxes

Supply of Automatic Valve Manifold Boxes VMB with 3 Valve sticks Distribution sticks for supplying high purity 100% Hydrogen Chloride

1 no Delivery: 60 days
#12

ITC of Automatic Valve Manifold Boxes

Installation, Testing and Commissioning of Automatic Valve Manifold Boxes VMB with 3 Valve sticks Distribution sticks for supplying high purity 100% Hydrogen Chloride

1 no Delivery: 60 days
#13

Supply of SS316L, Electropolished Tube

Supply of SS316L, Electropolished Tube, Roughness 10 Ra or better

60 m Delivery: 60 days
#14

ITC of SS316L, Electropolished Tube

Installation, Testing and Commissioning of SS316L, Electropolished Tube, Roughness 10 Ra or better

60 m Delivery: 60 days
#15

Supply of SS316L, Electropolished Tube

Supply of SS316L, Electropolished Tube, Roughness 10 Ra or better

96 m Delivery: 60 days
#16

ITC of SS316L, Electropolished Tube

Installation, Testing and Commissioning of SS316L, Electropolished Tube, Roughness 10 Ra or better

96 m Delivery: 60 days
#17

Supply of SS316L, Electropolished Tube

Supply of SS316L, Electropolished Tube, Roughness 10 Ra or better

60 m Delivery: 60 days
#18

ITC of SS316L, Electropolished Tube

Installation, Testing and Commissioning of SS316L, Electropolished Tube, Roughness 10 Ra or better

60 m Delivery: 60 days
#19

Supply of SS316L, Electropolished Tube

Supply of SS316L, Electropolished Tube, Roughness 10 Ra or better

120 m Delivery: 60 days
#20

ITC of SS316L, Electropolished Tube

Installation, Testing and Commissioning of SS316L, Electropolished Tube, Roughness 10 Ra or better

120 m Delivery: 60 days
#21

Supply of SS316L, Electropolished Weldable Reducers

Supply of SS316L, Electropolished Weldable Reducers

3 no Delivery: 60 days
#22

ITC of SS316L, Electropolished Weldable Reducers

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Reducers

3 no Delivery: 60 days
#23

Supply of SS316L, Electropolished Weldable Reducers

Supply of SS316L, Electropolished Weldable Reducers

3 no Delivery: 60 days
#24

ITC of SS316L, Electropolished Weldable Reducers

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Reducers

3 no Delivery: 60 days
#25

Supply of SS316L, Electropolished Weldable Reducers

Supply of SS316L, Electropolished Weldable Reducers

5 no Delivery: 60 days
#26

ITC of SS316L, Electropolished Weldable Reducers

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Reducers

5 no Delivery: 60 days
#27

Supply of SS316L, Electropolished Weldable Reducers

Supply of SS316L, Electropolished Weldable Reducers

5 no Delivery: 60 days
#28

ITC of SS316L, Electropolished Weldable Reducers

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Reducers

5 no Delivery: 60 days
#29

Supply of SS316L, Electropolished Weldable Bends

Supply of SS316L, Electropolished Weldable Bends

5 no Delivery: 60 days
#30

ITC of SS316L, Electropolished Weldable Bends

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Bends

5 no Delivery: 60 days
#31

Supply of SS316L, Electropolished Weldable Bends

Supply of SS316L, Electropolished Weldable Bends

8 no Delivery: 60 days
#32

ITC of SS316L, Electropolished Weldable Bends

Installation, Testing and Commissioning of SS316L, Electropolished Weldable Bends

8 no Delivery: 60 days
#33

Supply of SS316L, Electropolished Valves with tube stubs

Supply of SS316L, Electropolished Valves with tube stubs with single purge port

5 no Delivery: 60 days
#34

ITC of SS316L, Electropolished Valves with tube stubs

Installation, Testing and Commissioning of SS316L, Electropolished Valves with tube stubs with single purge port

5 no Delivery: 60 days
#35

Supply of SS316L, Electropolished Valves with tube stubs

Supply of SS316L, Electropolished Valves with tube stubs with single purge port

5 no Delivery: 60 days
#36

ITC of SS316L, Electropolished Valves with tube stubs

Installation, Testing and Commissioning of SS316L, Electropolished Valves with tube stubs with single purge port

5 no Delivery: 60 days
#37

Supply of SS316L, Electropolished Valves with tube stubs

Supply of SS316L, Electropolished Valves with tube stubs with double purge port

2 no Delivery: 60 days
#38

ITC of SS316L, Electropolished Valves with tube stubs

Installation, Testing and Commissioning of SS316L, Electropolished Valves with tube stubs with double purge port

2 no Delivery: 60 days
#39

Supply of SS316L, Electropolished Valves with tube stubs

Supply of SS316L, Electropolished Valves with tube stubs with double purge port

2 no Delivery: 60 days
#40

ITC of SS316L, Electropolished Valves with tube stubs

Installation, Testing and Commissioning of SS316L, Electropolished Valves with tube stubs with double purge port

2 no Delivery: 60 days
#41

Supply of SS316, Plug Valves, Working pressure

Supply of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O Ring PTFE Coated Florocarbon FKM

15 no Delivery: 60 days
#42

ITC of SS316, Plug Valves, Working pressure

Installation, Testing and Commissioning of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O Ring PTFE Coated Florocarbon FKM

15 no Delivery: 60 days
#43

Supply of SS316, Plug Valves, Working pressure

Supply of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O-Ring PTFE Coated Florocarbon FKM

15 no Delivery: 60 days
#44

ITC of SS316, Plug Valves, Working pressure

Installation, Testing and Commissioning of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O-Ring PTFE Coated Florocarbon FKM

15 no Delivery: 60 days
#45

Supply of SS316, Plug Valves, Working pressure

Supply of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O-Ring PTFE Coated Florocarbon FKM

40 no Delivery: 60 days
#46

ITC of SS316, Plug Valves, Working pressure

Installation, Testing and Commissioning of SS316, Plug Valves, Working pressure upto 3000 psi, Plug PTFE Coated SS316, O-Ring PTFE Coated Florocarbon FKM

40 no Delivery: 60 days
#47

Supply of SS316L Electropolished Check Valves

Supply of SS316L Electropolished Check Valves, with tube stubs

2 no Delivery: 60 days
#48

ITC of SS316L Electropolished Check Valves

Installation, Testing and Commissioning of SS316L Electropolished Check Valves, with tube stubs

2 no Delivery: 60 days
#49

Supply of SS316L Electropolished Check Valves

Supply of SS316L Electropolished Check Valves, with tube stubs

2 no Delivery: 60 days
#50

ITC of SS316L Electropolished Check Valves

Installation, Testing and Commissioning of SS316L Electropolished Check Valves, with tube stubs

2 no Delivery: 60 days
#51

Supply of SS316L End caps

Supply of SS316L End caps

2 no Delivery: 60 days
#52

ITC of SS316L End caps

Installation, Testing and Commissioning of SS316L End caps

2 no Delivery: 60 days
#53

Supply of SS316L End caps

Supply of SS316L End caps

2 no Delivery: 60 days
#54

ITC of SS316L End caps

Installation, Testing and Commissioning of SS316L End caps

2 no Delivery: 60 days
#55

Supply of SS 316L POU Filters

Supply of SS 316L POU Filters 0.003u with MVCR Ports

5 no Delivery: 60 days
#56

ITC of SS 316L POU Filters

Installation, Testing and Commissioning of SS 316L POU Filters 0.003u with MVCR Ports

5 no Delivery: 60 days
#57

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#58

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#59

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#60

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#61

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

3 no Delivery: 60 days
#62

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with tube stubs with outlet Pressure gauge . Pressure Gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

3 no Delivery: 60 days
#63

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#64

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#65

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#66

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

2 no Delivery: 60 days
#67

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Supply of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

5 no Delivery: 60 days
#68

ITC of SS316L Ultra High Purity Low Pressure Single Stage Regulators

Installation, Testing and Commissioning of SS316L Ultra High Purity Low Pressure Single Stage Regulators with FVCR connections with outlet Presure gauge of dial 1.5 Inch , range 0-100 psi or 0-150 psi, Internal Surface SS 316L Electropolished, Roughness 10 Ra or better

5 no Delivery: 60 days
#69

Supply of SS316 Pressure Gauges with MVCR Ports

Supply of SS316 Pressure Gauges with MVCR Ports -30 to100 psi , Dial 1.5 Inch

10 no Delivery: 60 days
#70

ITC of SS316 Pressure Gauges with MVCR Ports

Installation, Testing and Commissioning of SS316 Pressure Gauges with MVCR Ports -30 to100 psi , Dial 1.5 Inch

10 no Delivery: 60 days
#71

Supply of SS316 Pressure Gauges with FVCR Ports

Supply of SS316 Pressure Gauges with FVCR Ports -30 Inch to100 psi , Dial 1.5 Inch

10 no Delivery: 60 days
#72

ITC of SS316 Pressure Gauges with FVCR Ports

Installation, Testing and Commissioning of SS316 Pressure Gauges with FVCR Ports -30 Inch to100 psi , Dial 1.5 Inch

10 no Delivery: 60 days
#73

Supply of SS316, Long Tube Butt Weld Glands, Electropolished

Supply of SS316, Long Tube Butt Weld Glands, Electropolished

50 no Delivery: 60 days
#74

ITC of SS316, Long Tube Butt Weld Glands, Electropolished

Installation, Testing and Commissioning of SS316, Long Tube Butt Weld Glands, Electropolished

50 no Delivery: 60 days
#75

Supply of SS316, Long Tube Butt Weld Glands, Electropolished

Supply of SS316, Long Tube Butt Weld Glands, Electropolished

10 no Delivery: 60 days
#76

ITC of SS316, Long Tube Butt Weld Glands, Electropolished

Installation, Testing and Commissioning of SS316, Long Tube Butt Weld Glands, Electropolished

10 no Delivery: 60 days
#77

Supply of SS316, Short Tube Butt Weld Glands, Electropolished

Supply of SS316, Short Tube Butt Weld Glands, Electropolished

50 no Delivery: 60 days
#78

ITC of SS316, Short Tube Butt Weld Glands, Electropolished

Installation, Testing and Commissioning of SS316, Short Tube Butt Weld Glands, Electropolished

50 no Delivery: 60 days
#79

Supply of SS316, Short Tube Butt Weld Glands, Electropolished

Supply of SS316, Short Tube Butt Weld Glands, Electropolished

10 no Delivery: 60 days
#80

ITC of SS316, Short Tube Butt Weld Glands, Electropolished

Installation, Testing and Commissioning of SS316, Short Tube Butt Weld Glands, Electropolished

10 no Delivery: 60 days
#81

Supply of SS316 VCR Male Plug

Supply of SS316 VCR Male Plug

50 no Delivery: 60 days
#82

ITC of SS316 VCR Male Plug

Installation, Testing and Commissioning of SS316 VCR Male Plug

50 no Delivery: 60 days
#83

Supply of SS316 VCR Male Plug

Supply of SS316 VCR Male Plug

10 no Delivery: 60 days
#84

ITC of SS316 VCR Male Plug

Installation, Testing and Commissioning of SS316 VCR Male Plug

10 no Delivery: 60 days
#85

Supply of SS316 VCR Male Plug

Supply of SS316 VCR Male Plug

2 no Delivery: 60 days
#86

ITC of SS316 VCR Male Plug

Installation, Testing and Commissioning of SS316 VCR Male Plug

2 no Delivery: 60 days
#87

Supply of SS316 VCR Female Plug

Supply of SS316 VCR Female Plug

50 no Delivery: 60 days
#88

ITC of SS316 VCR Female Plug

Installation, Testing and Commissioning of SS316 VCR Female Plug

50 no Delivery: 60 days
#89

Supply of SS316 VCR Female Plug

Supply of SS316 VCR Female Plug

10 no Delivery: 60 days
#90

ITC of SS316 VCR Female Plug

Installation, Testing and Commissioning of SS316 VCR Female Plug

10 no Delivery: 60 days
#91

Supply of SS316 VCR Female Plug

Supply of SS316 VCR Female Plug

2 no Delivery: 60 days
#92

ITC of SS316 VCR Female Plug

Installation, Testing and Commissioning of SS316 VCR Female Plug

2 no Delivery: 60 days
#93

Supply of VCR Ni Gaskets

Supply of VCR Ni Gaskets Retainer Types

100 no Delivery: 60 days
#94

ITC of VCR Ni Gaskets

Installation, Testing and Commissioning of VCR Ni Gaskets Retainer Types

100 no Delivery: 60 days
#95

Supply of VCR Ni Gaskets

Supply of VCR Ni Gaskets Retainer Types

20 no Delivery: 60 days
#96

ITC of VCR Ni Gaskets

Installation, Testing and Commissioning of VCR Ni Gaskets Retainer Types

20 no Delivery: 60 days
#97

Supply of VCR Ni Gaskets

Supply of VCR Ni Gaskets Retainer Types

5 no Delivery: 60 days
#98

ITC of VCR Ni Gaskets

Installation, Testing and Commissioning of VCR Ni Gaskets Retainer Types

5 no Delivery: 60 days
#99

Supply of SS316,FVCR Tube Fitting Connector

Supply of SS316,FVCR Tube Fitting Connector

20 no Delivery: 60 days
#100

ITC of SS316,FVCR Tube Fitting Connector

Installation, Testing and Commissioning of SS316,FVCR Tube Fitting Connector

20 no Delivery: 60 days
#101

Supply of SS316,MVCR Tube Fitting Connector

Supply of SS316,MVCR Tube Fitting Connector

20 no Delivery: 60 days
#102

ITC of SS316,MVCR Tube Fitting Connector

Installation, Testing and Commissioning of SS316,MVCR Tube Fitting Connector

20 no Delivery: 60 days
#103

Supply of SS316L, Co axial tubing, Electropolished, Roughness 10 Ra or better

Supply of SS316L, Co-axial tubing, Electropolished, Roughness 10 Ra or better

660 m Delivery: 60 days
#104

ITC of SS316L, Co axial tubing, Electropolished, Roughness 10 Ra or better

Installation, Testing and Commissioning of SS316L, Co-axial tubing, Electropolished, Roughness 10 Ra or better

660 m Delivery: 60 days
#105

Supply of SS316L Co axial tubing terminators

Supply of SS316L Co-axial tubing terminators

40 no Delivery: 60 days
#106

ITC of SS316L Co axial tubing terminators

Installation, Testing and Commissioning of SS316L Co-axial tubing terminators

40 no Delivery: 60 days
#107

Supply of SS316L Co axial tubing sleeves

Supply of SS316L Co-axial tubing sleeves

80 no Delivery: 60 days
#108

ITC of SS316L Co axial tubing sleeves

Installation, Testing and Commissioning of SS316L Co-axial tubing sleeves

80 no Delivery: 60 days
#109

Supply of SS316 Bulkhead Connectors for Co axial tubing

Supply of SS316 Bulkhead Connectors for Co-axial tubing

12 no Delivery: 60 days
#110

ITC of SS316 Bulkhead Connectors for Co axial tubing

Installation, Testing and Commissioning of SS316 Bulkhead Connectors for Co-axial tubing

12 no Delivery: 60 days
#111

Supply of SS316L Co axial equa T Piece

Supply of SS316L Co-axial equa T-Piece

10 no Delivery: 60 days
#112

ITC of SS316L Co axial equa T Piece

Installation, Testing and Commissioning of SS316L Co-axial equa T-Piece

10 no Delivery: 60 days
#113

Supply of SS316L Co axial Male Purge T Piece

Supply of SS316L Co-axial Male Purge T-Piece

10 no Delivery: 60 days
#114

ITC of SS316L Co axial Male Purge T Piece

Installation, Testing and Commissioning of SS316L Co-axial Male Purge T-Piece

10 no Delivery: 60 days
#115

Supply of Co axial Bulk Head fitting with Purge T piece

Supply of Co-axial Bulk Head fitting with Purge T-piece

8 no Delivery: 60 days
#116

ITC of Co axial Bulk Head fitting with Purge T piece

Installation, Testing and Commissioning of Co-axial Bulk Head fitting with Purge T-piece

8 no Delivery: 60 days
#117

Supply of SS316 Outer Tee connection for N2 purging in jacket of co axial tubing

Supply of SS316 Outer Tee connection for N2 purging in jacket of co-axial tubing

10 no Delivery: 60 days
#118

ITC of SS316 Outer Tee connection for N2 purging in jacket of co axial tubing

Installation, Testing and Commissioning of SS316 Outer Tee connection for N2 purging in jacket of co-axial tubing

10 no Delivery: 60 days
#119

Supply of Rota meters

Supply of Rota-meters 0-10 slpm for N2 back purge in co-axial tubing

10 no Delivery: 60 days
#120

ITC of Rota meters

Installation, Testing and Commissioning of Rota-meters 0-10 slpm for N2 back purge in co-axial tubing

10 no Delivery: 60 days
#121

Supply of Magnahelic Gauges for Gas cabinet

Supply of Magnahelic Gauges for Gas cabinet VMB exhaust monitoring, Range 0-3 inches of H2O

10 no Delivery: 60 days
#122

ITC of Magnahelic Gauges for Gas cabinet

Installation, Testing and Commissioning of Magnahelic Gauges for Gas cabinet VMB exhaust monitoring, Range 0-3 inches of H2O

10 no Delivery: 60 days
#123

Supply of SS316 Valve sticks

Supply of SS316 Valve sticks including Isolation plug valve , Low Pr. Regulator with range 0-150 psi & Pr. Gauge with range 0-200 psi with double ferrule fittings and back support plate

16 no Delivery: 60 days
#124

ITC of SS316 Valve sticks

Installation, Testing and Commissioning of SS316 Valve sticks including Isolation plug valve , Low Pr. Regulator with range 0-150 psi & Pr. Gauge with range 0-200 psi with double ferrule fittings and back support plate

16 no Delivery: 60 days
#125

Supply of SS316L, Tube

Supply of SS316L, Tube

60 m Delivery: 60 days
#126

ITC of SS316L, Tube

Installation, Testing and Commissioning of SS316L, Tube

60 m Delivery: 60 days
#127

Supply of SS316L, Tube

Supply of SS316L, Tube

60 m Delivery: 60 days
#128

ITC of SS316L, Tube

Installation, Testing and Commissioning of SS316L, Tube

60 m Delivery: 60 days
#129

Supply of SS316L, Tube

Supply of SS316L, Tube

96 m Delivery: 60 days
#130

ITC of SS316L, Tube

Installation, Testing and Commissioning of SS316L, Tube

96 m Delivery: 60 days
#131

Supply of SS316, Ball Valve

Supply of SS316, Ball Valve Female NPT

3 no Delivery: 60 days
#132

ITC of SS316, Ball Valve

Installation, Testing and Commissioning of SS316, Ball Valve Female NPT

3 no Delivery: 60 days
#133

Supply of SS316, Ball Valve

Supply of SS316, Ball Valve Double ferrule connections

10 no Delivery: 60 days
#134

ITC of SS316, Ball Valve

Installation, Testing and Commissioning of SS316, Ball Valve Double ferrule connections

10 no Delivery: 60 days
#135

Supply of SS316, Ball Valve

Supply of SS316, Ball Valve Double ferrule connections

10 no Delivery: 60 days
#136

ITC of SS316, Ball Valve

Installation, Testing and Commissioning of SS316, Ball Valve Double ferrule connections

10 no Delivery: 60 days
#137

Supply of SS316, Double ferrule union

Supply of SS316, Double ferrule union

10 no Delivery: 60 days
#138

ITC of SS316, Double ferrule union

Installation, Testing and Commissioning of SS316, Double ferrule union

10 no Delivery: 60 days
#139

Supply of SS316, Double ferrule union

Supply of SS316, Double ferrule union

50 no Delivery: 60 days
#140

ITC of SS316, Double ferrule union

Installation, Testing and Commissioning of SS316, Double ferrule union

50 no Delivery: 60 days
#141

Supply of SS316, Double ferrule Reducer union

Supply of SS316, Double ferrule Reducer union

10 no Delivery: 60 days
#142

ITC of SS316, Double ferrule Reducer union

Installation, Testing and Commissioning of SS316, Double ferrule Reducer union

10 no Delivery: 60 days
#143

Supply of SS316, Double ferrule Reducer union

Supply of SS316, Double ferrule Reducer union

10 no Delivery: 60 days
#144

ITC of SS316, Double ferrule Reducer union

Installation, Testing and Commissioning of SS316, Double ferrule Reducer union

10 no Delivery: 60 days
#145

Supply of SS316, Double ferrule Reducer union

Supply of SS316, Double ferrule Reducer union

30 no Delivery: 60 days
#146

ITC of SS316, Double ferrule Reducer union

Installation, Testing and Commissioning of SS316, Double ferrule Reducer union

30 no Delivery: 60 days
#147

Supply of SS316, Double Ferrule Reducing Tee

Supply of SS316, Double Ferrule Reducing Tee

30 no Delivery: 60 days
#148

ITC of SS316, Double Ferrule Reducing Tee

Installation, Testing and Commissioning of SS316, Double Ferrule Reducing Tee

30 no Delivery: 60 days
#149

Supply of SS316, Compression Nuts

Supply of SS316, Compression Nuts

20 no Delivery: 60 days
#150

ITC of SS316, Compression Nuts

Installation, Testing and Commissioning of SS316, Compression Nuts

20 no Delivery: 60 days
#151

Supply of SS316, Compression Nuts

Supply of SS316, Compression Nuts

20 no Delivery: 60 days
#152

ITC of SS316, Compression Nuts

Installation, Testing and Commissioning of SS316, Compression Nuts

20 no Delivery: 60 days
#153

Supply of SS316, Compression Nuts

Supply of SS316, Compression Nuts

20 no Delivery: 60 days
#154

ITC of SS316, Compression Nuts

Installation, Testing and Commissioning of SS316, Compression Nuts

20 no Delivery: 60 days
#155

Supply of SS316,Ferrule Back and Front

Supply of SS316,Ferrule Back and Front

100 no Delivery: 60 days
#156

ITC of SS316,Ferrule Back and Front

Installation, Testing and Commissioning of SS316,Ferrule Back and Front

100 no Delivery: 60 days
#157

Supply of SS316,Ferrule Back and Front

Supply of SS316,Ferrule Back and Front

50 no Delivery: 60 days
#158

ITC of SS316,Ferrule Back and Front

Installation, Testing and Commissioning of SS316,Ferrule Back and Front

50 no Delivery: 60 days
#159

Supply of SS316,Ferrule Back and Front

Supply of SS316,Ferrule Back and Front

200 no Delivery: 60 days
#160

ITC of SS316,Ferrule Back and Front

Installation, Testing and Commissioning of SS316,Ferrule Back and Front

200 no Delivery: 60 days
#161

Supply of Unistrut Channel

Supply of Unistrut Channel

72 m Delivery: 60 days
#162

ITC of Unistrut Channel

Installation, Testing and Commissioning of Unistrut Channel

72 m Delivery: 60 days
#163

Supply of Epoxy Coated Unistrut Channel

Supply of Epoxy Coated Unistrut Channel

18 m Delivery: 60 days
#164

ITC of Epoxy Coated Unistrut Channel

Installation, Testing and Commissioning of Epoxy Coated Unistrut Channel

18 m Delivery: 60 days
#165

Supply of Clamps for Unistrut support

Supply of Clamps for Unistrut support

200 sets Delivery: 60 days
#166

ITC of Clamps for Unistrut support

Installation, Testing and Commissioning of Clamps for Unistrut support

200 sets Delivery: 60 days
#167

Supply of PFA Flexible Tubing

Supply of PFA Flexible Tubing

100 ft Delivery: 60 days
#168

ITC of PFA Flexible Tubing

Installation, Testing and Commissioning of PFA Flexible Tubing

100 ft Delivery: 60 days
#169

Supply of PFA Flexible Tubing

Supply of PFA Flexible Tubing

100 ft Delivery: 60 days
#170

ITC of PFA Flexible Tubing

Installation, Testing and Commissioning of PFA Flexible Tubing

100 ft Delivery: 60 days
#171

Supply of PFA Flexible Tubing

Supply of PFA Flexible Tubing

100 ft Delivery: 60 days
#172

ITC of PFA Flexible Tubing

Installation, Testing and Commissioning of PFA Flexible Tubing

100 ft Delivery: 60 days

Corrigendum Updates

1 Update
#1

Update

20-Mar-2025

Extended Deadline

10-Apr-2025, 3:00 pm

Opening Date

10-Apr-2025, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
UHP TECHNOLOGIES PRIVATE LIMITED   Under PMA
-05-03-2025 12:46:05
2
Vayusodh Applied Systems and Technologies LLP   Under PMA
-08-04-2025 09:14:55

Financial Results

Rank Seller Price Item
L1
UHP TECHNOLOGIES PRIVATE LIMITED(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Two cylinders Gas cabinet,ITC of Two cylinders Gas cabinet,Supply of Two cylinders Gas ca

Frequently Asked Questions

Key insights about PUNJAB tender market

What are the eligibility requirements for participation in gas cabinet supply tenders?

The eligibility requirements for participation include being a registered entity with appropriate governmental licenses. Bidders must demonstrate relevant experience in supplying similar products, particularly gas cabinets, along with compliance with local safety and quality regulations.

What are the required certificates for gas cabinet supplies?

Bidders must provide necessary certificates indicating compliance with safety standards and any applicable industry regulations. Additional manufacturing quality certifications and proof of technical capability may also be required to satisfy bid submission criteria.

How do I register for submitting a bid in this tender?

To register for submitting a bid, participants must follow the online registration process outlined on the designated bidding platform. Ensure that all required documentation is prepared in acceptable formats and submitted before the specified deadline to maintain eligibility.

What are the financial security requirements related to this tender?

Financial requirements include an Earnest Money Deposit (EMD) amounting to ₹1,573,405. Additionally, successful bidders will be required to submit a performance security deposit to guarantee contract fulfillment as stipulated in the tender documentation.

How will the evaluation and selection process be conducted?

The evaluation process will follow a total value-wise evaluation approach, assessing bids on price as well as quality and delivery assurances. The bidder who meets all technical specifications and regulatory requirements while providing the best overall value will be selected, and results will be communicated through official channels as outlined in the tender.