Split Air Conditioner Including Green AC, Wall Mount Type (V2)
Indian Army
BATHINDA, PUNJAB
Bid Publish Date
30-Dec-2025, 10:45 am
Bid End Date
13-Jan-2026, 9:00 am
Location
Progress
Quantity
8
Bid Type
Single Packet Bid
Organization: Mumbai Railway Vikas Corporation; Product/Service: Split Air Conditioner including Green AC, Wall Mount Type (V2) (Q2); Location: Mumbai, Maharashtra; Estimated Value: Not disclosed; EMD: Not disclosed. Key differentiator includes green AC environmental requirements, IS conformity, and comprehensive/component warranties. Scope covers installation/commissioning, and optional PCB warranty. The bid emphasizes BEE star/IS standards alignment and supplier capability for retrofits on rail project infrastructure. Notable terms include 25% quantity variation rights and demurrage provisions for rejected items. This tender targets suppliers with ECO-friendly refrigerants and IS compliance to support sustainable rail cooling solutions.
Key Term 1: 25% quantity variation allowed during order and currency of contract
Key Term 2: GST payable by bidder; reimbursement as actuals up to quoted rate
Key Term 3: Demurrage at 0.5% of contract value per day if rejected items are not lifted within 48 hours
GST treatment as per actuals or applicable rate; no separate tax payments beyond quoted rate
Delivery window adjustable up to 25% variation; minimum 30 days for added quantity; delivery period aligned to last delivery order date
Demurrage at 0.5% daily; potential destruction of unlifted items after one month
Experience in supplying/installation of split AC units with Green AC standards
Demonstrated OEM/distributor authorization
Ability to meet ISS conformity and energy efficiency standards
Indian Army
BATHINDA, PUNJAB
Container Corporation Of India Limited
TIRUVALLUR, TAMIL NADU
Punjab National Bank
KOLKATA, WEST BENGAL
Odisha Power Transmission Corporation Limited (optcl) Bhubaneswar
ANGUL, ODISHA
Accountant General, Rajasthan
JAIPUR, RAJASTHAN
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Classification By Function | Cooling Only |
| Generic | Nominal Marketing Cooling Capacity (in Ton) {Hint: 1 Ton= 3000 Kcal/Hr, Tolerance +/-10%} | 1.5 Ton |
| Generic | Star Rating (ISEER value range) | 5 Star (ISEER value from >=5.6 to 6.0) |
| Generic | Compressor Type as per BEE Star Rating Label | Inverter AC - Variable Speed |
| Refrigerants | Eco-friendly Refrigerant | Yes |
| Refrigerants | Refrigerant Ozone Depletion Potential is Zero | Yes |
| Green AC Related Environment Friendly Requirement | Compliance to Green AC related environmental friendly features complied | No |
| Warranty/Service | Comprehensive Warranty on Air Conditioner/Machine (in years) | 1 |
| Warranty/Service | Warranty on Compressor (in years) | 10 Or higher |
| Warranty/Service | Optional Warranty on PCB | 5 years Or higher |
| Warranty/Service | Installation/Commissioning | With Free Standard Installation Commissioning Or higher |
| Warranty/Service | Number of free services during the Comprehensive Warranty on Air Conditioner/Machine | 2 services per year, 4 services per year Or higher |
| Certifications | Mandatory compliance / conformity to relevant ISS | As per IS 1391 (Part 2)-Latest and as per Gazette Notification no. S.O. 3897(E) dated,29th October 2019 and as per BEE Notification dated 19th April 2022 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar AC installations
Financial statements (latest)
EMD/Bid security documents
Technical bid documents
OEM authorization or distributor authorization
Certificates showing compliance with ISS standards
Installation/commissioning plan and warranty certificates
Extended Deadline
13-Jan-2026, 9:00 am
Opening Date
13-Jan-2026, 9:30 am
Extended Deadline
10-Jan-2026, 9:00 am
Opening Date
10-Jan-2026, 9:30 am
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, OEM authorization, and ISS conformity documents. Ensure compliance with 25% quantity variation, installation scope, and demurrage terms. Prepare installation plan and warranty details for a railway environment.
Required documents include GST certificate, PAN, company financials, experience letters for similar railway AC projects, OEM/distributor authorization, technical compliance certificates, and installation/maintenance plan; ensure ISS conformity evidence is provided.
Units must meet ISEER value range and use eco-friendly refrigerants with zero ozone depletion potential; verify compliance with Green AC features and BEE star-aligned compressor types for procurement.
Purchaser may adjust quantity up to 25% at contract placement or during the currency; delivery period expands with added quantity using the formula provided, minimum extension 30 days.
If items remain unlifted after 48 hours, demurrage charges apply at 0.5% of total contract value per day; items unlifted for a month may be destroyed with no claim admitted.
Mandatory ISS conformity; OEM authorization when using distributors; ensure compliance certificates and green-AC standards are included with bid submission.
Bid includes on-site installation/commissioning; provide detailed installation plan, required site conditions, and post-installation warranty coverage for the railway project context.
GST is bidder’s responsibility; reimbursement will be actual or at the quoted rate, whichever is lower, with a cap at the bid's GST percentage; confirm with procurement before submission.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS