Bid Publish Date
04-Oct-2026, 11:35 am
Bid End Date
26-Oct-2026, 4:00 pm
Location
Progress
The procurement opportunity is issued by the Indo Tibetan Border Police (ITBP) under the Central Armed Police Forces category for a Pulverizer. The tender foresees a flexible quantity policy, allowing up to 25% increased quantity at contracted rates and up to 25% extensions during the currency of the contract. Delivery timing hinges on the original delivery period, with calculations based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum ensuring at least 30 days of extra time. The ATC terms impose a mandatory pre-bid ATC certificate and comprehensive bidder documentation, reflecting strict compliance standards. The absence of BOQ items suggests a streamlined scope or placeholder items. This tender emphasizes compliance with official documentation and flexible procurement strategy, while reserving cancellation rights if required by administrative decisions.
25% quantity option at contracted rates
Delivery period extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Delivery period starts from last date of original delivery order
Minimum extension not less than 30 days if original period < 30 days
ATC certificate mandatory before bid end date
PAN, Aadhaar, GST, income tax certificates required before bid end date
MSME registration submission if applicable
ATC certificate submission before bid end date is mandatory
Up to 25% quantity increase allowed at contracted rates
Delivery time extensions calculated proportionally with a 30-day minimum
Not specified in available data
Delivery period begins from the last date of the original delivery order; extended periods follow the option clause with proportional time calculation
Not specified in available data
Submit ATC certificate before bid end date
Provide PAN, Aadhaar, GST, and latest income tax certificate
MSME certificate if applicable
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Pulverizer (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Gautam Buddha Nagar
Delivery Pincodes
201306
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjay Prasad | 201306,39th bn itbp lakhanawali surajpur greater noida | Gautam Buddha Nagar | Uttar Pradesh | 201306 | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
ATC certificate before bid end date
PAN Card
Aadhaar Card
GST Registration certificate
Latest Income Tax Certificate
MSME Registration certificate (scanned if applicable)
Key insights about UTTAR PRADESH tender market
To bid, submit the mandatory ATC certificate before the bid end date, along with PAN, Aadhaar, GST, and current income tax certificates. If applicable, provide MSME registration. Ensure compliance with documented ATC terms and be prepared for potential bid cancellation by the administrative authority.
Required documents include ATC certificate, PAN, Aadhaar, GST registration, latest income tax certificate, and MSME registration if applicable. Also provide technical bid documents as per ATC guidance. Ensure all documents are current and verifiable to avoid technical rejection.
Delivery time scales with the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension. Original delivery period remains baseline; any extension follows the proportional rule and may extend within contract constraints.
MSME bidders must submit scanned MSME registration certificate along with the standard documents. The ATC terms require compliance with all conditions; MSME status may influence certificate verification and eligibility but does not guarantee award without meeting all criteria.
The buyer reserves the right to cancel the bid at any stage due to administrative reasons. Bidders should prepare for possible cancellation despite meeting technical criteria, as no guarantee of award is provided and evaluation follows ATC terms.
No explicit technical standards are published in the data. Emphasis is on ATC compliance, document submission, and the quantity-extension mechanism. Bidders should plan to meet standard procurement practices and any applicable internal ITBP or govt guidelines referenced in ATC.
Submit ATC certificate first, then upload PAN, Aadhaar, GST, and income tax certificates before bid end date. Ensure MSME certificate if applicable and provide all technical bid documents as per ATC. Delays or omissions can lead to disqualification during technical evaluation.