Supply Installation Testing and Commissioning of Ceiling Mounting Kit,Supply Installation Testing a
Indian Army
GHAZIABAD, UTTAR PRADESH
Progress
Quantity
784
Category
Supply Installation Testing and Comissioning of VRF
Bid Type
Two Packet Bid
Public procurement opportunity for Power Grid Corporation Of India Limited Supply Installation Testing and Comissioning of VRF, Supply Installation Testing and Comissioning of Indoor unit, Supply Installation Testing and Comissioning of Joints, Supply of cables, Supply Installation Testing and Comissioning of Switch boxes, Supply Installation Testing and Comissioning of copper pipes, Drain pipe, Refrigerant, Material Shifting, Supply Installation of cable tray, Core cutting, S I of Distribution box, Laying of cable, Termination of cable, Dismantelling, POP Gypsum work in BANGALORE, KARNATAKA. Quantity: 784 issued by. Submission Deadline: 03-07-2026 16: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply Installation Testing and Comissioning of VRF , Supply Installation Testing and Comissioning of Indoor unit , Supply Installation Testing and Comissioning of Joints , Supply of cables , Supply Installation Testing and Comissioning of Switch boxes , Supply Installation Testing and Comissioning of copper pipes , Drain pipe , Refrigerant , Material Shifting , Supply Installation of cable tray , Core cutting , S I of Distribution box , Laying of cable , Termination of cable , Dismantelling , POP Gypsum work
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GHAZIABAD, UTTAR PRADESH
State Bank Of India (sbi)
JALANDHAR, PUNJAB
Oil India Limited
DIBRUGARH, ASSAM
North East Frontier Railway
DIBRUGARH, ASSAM
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Tender Results
Loading results...
Supply Installation Testing and Comissioning of VRF
Supplying, Installation, Testing & Commissioning of Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units alongwith Outdoor stand as per TS For Cooling --10HP
Supply Installation Testing and Comissioning of Indoor unit
Supplying, Installation, Testing and Commissioning of following minimum capacity 4 way Cassette Type Indoor ceiling mounted unit including wireless remote as per TS (Make will be same as of Outdoor)--3.2 Tr
Supply Installation Testing and Comissioning of Joints
Supplying, Installation, Testing and Commissioning of Y/T/Multi Joints. Joints shall be of same Original Equipment Manufacturer (OEM) make as of ODUs and IDUs
Supply of cables
Supply of 3C x 2.5sqmm Flexible Cable for IDU power
Supply Installation Testing and Comissioning of Switch boxes
Supplying, Installation, Testing and Commissioning of 5Amps Switch box (5A Switch+5A socket on 3 Module Box)
Supply of cables
Supply of 4C x 16sqmm PVC/XLPE Armoured Copper cable
Supply Installation Testing and Comissioning of copper pipes
Supply & Installation/Laying of Copper pipe for refrigerant with insulation and support etc., as required
Supply of cables
Supply & laying of 2 Core 1.0-1.5 sqmm Communication cable between IDU and ODU inside Rigid/Flexible PVC conduit wherever required
Drain pipe
Supply & fixing CPVC drain pipe 25/32mm with supports as per site conditions
Refrigerant
Supply and topping up Refrigerant R410A/R32 as applicable (if required)
Material Shifting
Lifting & shifting of 01 nos ODU with crane/manually to site as per direction of EIC with complete Safety
Supply Installation of cable tray
Supply & Installation/laying of 100/200mm Cable tray with closure as per site conditions with complete safety
Core cutting
Core cutting works as per site condition
S I of Distribution box
Supply and Installation of IP-65/66 stainless steel (304 grade) or powder-coated galvanized steel Outdoor Distribution Box of appropriate size (should be spacious) near ODU with 63A - 2 nos MCB and accessories (ie Lugs cable tie wires screws BN etc)
Laying of cable
Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade offollowing size in the existing masonry open/close duct as required.-Upto 35 sq. mm
Laying of cable
Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required. -Upto 35 sq. mm (clamped with 1mm thick saddle)
Termination of cable
Supplying and making end termination with brass/aluminium compression gland and copper lugs for following size of PVC insulated and PVC sheathed / XLPE copper conductor cable of 1.1 KV grade as required.--4 X 16 sq. mm (28mm)
Dismantelling
Service Charges for Dismantling Handing over of an Existing Cassette IDU(Samsung Make) - 1.2 or 1.3TR(Pump Down Pressure Testing Refilling of GAS)
Dismantelling
Dismantling/Cutting out of Existing POP/Gypsum ceiling and shifting the debris outside POWERGRID campus
POP Gypsum work
Supply and installation of POP/Gypsum work includes gypsum board, POP powder, putty and paint etc., (for making ceiling as per its earlier form)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply Installation Testing and Comissioning of VRF | Supplying, Installation, Testing & Commissioning of Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units alongwith Outdoor stand as per TS For Cooling --10HP | 1 | pieces | consigneesr2rhq | 60 | |
| 2 | Supply Installation Testing and Comissioning of Indoor unit | Supplying, Installation, Testing and Commissioning of following minimum capacity 4 way Cassette Type Indoor ceiling mounted unit including wireless remote as per TS (Make will be same as of Outdoor)--3.2 Tr | 3 | pieces | consigneesr2rhq | 60 | |
| 3 | Supply Installation Testing and Comissioning of Joints | Supplying, Installation, Testing and Commissioning of Y/T/Multi Joints. Joints shall be of same Original Equipment Manufacturer (OEM) make as of ODUs and IDUs | 2 | pieces | consigneesr2rhq | 60 | |
| 4 | Supply of cables | Supply of 3C x 2.5sqmm Flexible Cable for IDU power | 100 | m | consigneesr2rhq | 60 | |
| 5 | Supply Installation Testing and Comissioning of Switch boxes | Supplying, Installation, Testing and Commissioning of 5Amps Switch box (5A Switch+5A socket on 3 Module Box) | 3 | pieces | consigneesr2rhq | 60 | |
| 6 | Supply of cables | Supply of 4C x 16sqmm PVC/XLPE Armoured Copper cable | 150 | m | consigneesr2rhq | 60 | |
| 7 | Supply Installation Testing and Comissioning of copper pipes | Supply & Installation/Laying of Copper pipe for refrigerant with insulation and support etc., as required | 130 | m | consigneesr2rhq | 60 | |
| 8 | Supply of cables | Supply & laying of 2 Core 1.0-1.5 sqmm Communication cable between IDU and ODU inside Rigid/Flexible PVC conduit wherever required | 130 | m | consigneesr2rhq | 60 | |
| 9 | Drain pipe | Supply & fixing CPVC drain pipe 25/32mm with supports as per site conditions | 60 | m | consigneesr2rhq | 60 | |
| 10 | Refrigerant | Supply and topping up Refrigerant R410A/R32 as applicable (if required) | 12 | kg | consigneesr2rhq | 60 | |
| 11 | Material Shifting | Lifting & shifting of 01 nos ODU with crane/manually to site as per direction of EIC with complete Safety | 1 | ls | consigneesr2rhq | 60 | |
| 12 | Supply Installation of cable tray | Supply & Installation/laying of 100/200mm Cable tray with closure as per site conditions with complete safety | 20 | m | consigneesr2rhq | 60 | |
| 13 | Core cutting | Core cutting works as per site condition | 6 | pieces | consigneesr2rhq | 60 | |
| 14 | S I of Distribution box | Supply and Installation of IP-65/66 stainless steel (304 grade) or powder-coated galvanized steel Outdoor Distribution Box of appropriate size (should be spacious) near ODU with 63A - 2 nos MCB and accessories (ie Lugs cable tie wires screws BN etc) | 1 | set | consigneesr2rhq | 60 | |
| 15 | Laying of cable | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade offollowing size in the existing masonry open/close duct as required.-Upto 35 sq. mm | 100 | m | consigneesr2rhq | 60 | |
| 16 | Laying of cable | Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required. -Upto 35 sq. mm (clamped with 1mm thick saddle) | 50 | m | consigneesr2rhq | 60 | |
| 17 | Termination of cable | Supplying and making end termination with brass/aluminium compression gland and copper lugs for following size of PVC insulated and PVC sheathed / XLPE copper conductor cable of 1.1 KV grade as required.--4 X 16 sq. mm (28mm) | 2 | pieces | consigneesr2rhq | 60 | |
| 18 | Dismantelling | Service Charges for Dismantling Handing over of an Existing Cassette IDU(Samsung Make) - 1.2 or 1.3TR(Pump Down Pressure Testing Refilling of GAS) | 1 | lot | consigneesr2rhq | 60 | |
| 19 | Dismantelling | Dismantling/Cutting out of Existing POP/Gypsum ceiling and shifting the debris outside POWERGRID campus | 6 | sq mtr | consigneesr2rhq | 60 | |
| 20 | POP Gypsum work | Supply and installation of POP/Gypsum work includes gypsum board, POP powder, putty and paint etc., (for making ceiling as per its earlier form) | 6 | sq mtr | consigneesr2rhq | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Irel (india) Limited
📍 ERNAKULAM, KERALA
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Irel (india) Limited
📍 ERNAKULAM, KERALA
Directorate General Of Training
Hindustan Aeronautics Limited (hal)
📍 KASARGOD, KERALA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS