TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Tarpaulin Canopy, Cable Assembly, Air Cleaner Intake Tender 2026 – LV7 STLN VF Standards

Bid Publish Date

14-Jul-2026, 9:34 am

Bid End Date

24-Jul-2026, 10:00 am

Location

MATHURA , UTTAR PRADESH

Progress

Issue14-Jul-2026, 9:34 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

71

Category

LV7 STLN VF 2940-72-0000613 AIR CLEANER INTAKE

Bid Type

Two Packet Bid

Key Highlights

  • Government-grade procurement of LV7 STLN VF components (Tarpaulin Canopy, Cable Assembly Control, Air Cleaner Intake, Nonmetallic Hose).
  • Two-year OEM warranty required; OEM warranty certificates must accompany delivery.
  • Option clause enables up to 50% quantity increase during contract and currency; delivery period calculations with minimum 30 days.
  • GST invoice to be uploaded on GeM; GST payment confirmation screenshot required.
  • Pre-approval of advance sample before bulk production; post-receipt inspection at consignee site (BOO).
  • Dedicated service/ support line; robust after-sales network across INDIA.

Categories 10

Tender Overview

The opportunity is issued by the Indian Army (Department Of Military Affairs) for the supply of multiple LV7 STLN VF components, including Tarpaulin Assy Canopy, Cable Assy Control, Air Cleaner Intake, and Hose Nonmetallic items. The contract contemplates the supply of goods with a potential quantity adjustment up to 50% during and after contract award. Key prerequisites include GST and PAN documentation, EFT mandate, and GST invoice submission on GeM. A pre-approval sample may be required post award, and strong after-sales support with service centers in INDIA is expected. Unique aspects include end-to-end supply scope and OEM warranty compliance, with a two-year warranty from final acceptance.

This tender emphasizes compliance with formal documentation, GST invoicing through GeM, and post-delivery service capabilities. The absence of explicit BOQ quantities or item-wise values suggests a framework for multiple line items under LV7 STLN VF categories with standard government supply terms and option quantities. The buyer’s terms also allow flexible delivery timelines tied to original vs extended periods, and demand rigorous post-acceptance checks. The procurement focus centers on military-grade components with defined warranty and service commitments.

Technical Specifications & Requirements

  • Items referenced across LV7 STLN VF series include: Tarpaulin Canopy, Cable Assembly Control, Air Cleaner Intake, and Nonmetallic Hose variants.

  • Warranty: 2 years from final acceptance or after installation, with OEM warranty certificates at delivery.

  • Inspection: Post Receipt Inspection at consignee site; no pre-dispatch inspection unless ATC dictates.

  • Service: Dedicated support line required; installation, commissioning, and maintenance service group must be established in INDIA.

  • Sample: Advance sample approval required prior to bulk manufacturing.

  • Scope: Gross scope exclusively covers the supply of goods; no in-scope installation charges unless specified.

  • Standards/Certifications: Not explicitly specified in the data; bidders should align with typical government-grade product certifications and OEM warranties.

  • Documentation: PAN, GSTIN, Cancelled cheque, EFT mandate; GST invoice to be uploaded on GeM with GST portal payment confirmation.

  • Delivery: Traditional delivery terms with option for quantity variation and timeline calculations guided by original and extended delivery periods.

Terms, Conditions & Eligibility

  • EMD: Not specified in data; ensure readiness to meet standard GeM-based security deposit requirements if applicable.
  • Delivery: Option to increase quantity up to 50% of bid quantity; delivery timelines calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days.
  • Payments: GeM GST invoice submission required; terms on payment not explicitly stated; ensure compliance with government invoicing norms.
  • Documentation: Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate duly certified by bank; OEM authorizations may be required for certain items.
  • Warranty/Support: 2-year warranty; ensure a nationwide installation, commissioning, training, and maintenance network.
  • Inspection: Post-receipt inspection by nominated agency at consignee site; pre-dispatch not mandated unless ATC specifies.
  • Sample: Pre-production sample approval post-award before bulk manufacturing.
  • Compliance: Bidders must acknowledge option clause and comply with the 50% quantity adjustment mechanism and delivery-time computation.

Key Specifications

  • Tarpaulin Canopy (LV7 STLN VF category) – ensure compatibility with military storage enclosures; no explicit dimensions provided.

  • Cable Assembly Control – integrated with vehicle/airframe control systems; no exact gauge/dimension provided.

  • Air Cleaner Intake – part of LV7 STLN VF 2940-72-0000613; must meet standard vehicle intake performance, unspecified spec.

  • Nonmetallic Hose – LV7 STLN VF 4720-72-0260861 and 4720-72-0000205; material and bend radii not specified.

  • Warranty: 2 years from final acceptance; OEM warranty certificates required at delivery.

  • Post-receipt inspection at consignee site; pre-dispatch inspection not mandated unless ATC requires.

Terms & Conditions

  • Delivery quantity may increase up to 50% at contract; extended delivery timelines based on formula.

  • GST-compliant invoicing on GeM with GST portal payment confirmation.

  • 2-year warranty with nationwide after-sales support and service centers.

Important Clauses

Payment Terms

GST invoice on GeM; provide GST payment confirmation screenshot.

Delivery Schedule

Quantity variation up to 50%; delivery time = (additional/original) × original period; minimum 30 days.

Penalties/Liquidated Damages

Not explicitly stated; ensure compliance with standard government LDs and ATC if specified.

Bidder Eligibility

  • Eligibility to supply government-grade LV7 STLN VF components

  • Demonstrated experience with military or defence-related procurement

  • Financial capacity to manage up to 50% quantity variation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LV7 STLN VF 2540-72-04-6412 F5J00800 Tarpaulin Assy Canopy , LV7 STLN VF 2590-024065 CABLE ASSY CONTROL , LV7 STLN VF 2940-72-0000613 AIR CLEANER INTAKE , LV7 STLN VF 4720-72-0260861 HOSE NONMETALLIC , LV7 STLN VF 4720-72-0000205 HOSE ASSY NON METALIC

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Mathura

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-MathuraMathura--2560-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9601963.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

LV7 STLN VF 2540-72-04-6412 F5J00800 Tarpaulin Assy Canopy

Tarpaulin Assy Canopy

25 nos Delivery: 60 days
#2

LV7 STLN VF 2590-024065 CABLE ASSY CONTROL

CABLE ASSY CONTROL

29 nos Delivery: 60 days
#3

LV7 STLN VF 2940-72-0000613 AIR CLEANER INTAKE

AIR CLEANER INTAKE

2 nos Delivery: 60 days
#4

LV7 STLN VF 4720-72-0260861 HOSE NONMETALLIC

HOSE NONMETALLIC

10 nos Delivery: 60 days
#5

LV7 STLN VF 4720-72-0000205 HOSE ASSY NON METALIC

HOSE ASSY NON METALIC

5 nos Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate Copy certified by bank

5

OEM authorizations (where applicable)

6

GST invoice submission on GeM portal and GST payment confirmation screenshot

7

Post-delivery OEM warranty certificates

8

Evidence of service centers in INDIA for installation, commissioning, and maintenance

Frequently Asked Questions

How to bid for Indian Army tarpaulin canopy tender 2026?

To bid, prepare PAN, GSTIN, Cancelled cheque, and EFT Mandate; ensure GeM GST invoice capability and OEM authorizations if required. Meet post-delivery warranty commitments and arrange nationwide service support; review option clause for up to 50% quantity variation and compute delivery timelines accordingly.

What documents are required for Indian Army LV7 STLN VF bid in 2026?

Submit PAN, GSTIN, Cancelled cheque, EFT Mandate, OEM authorizations, post-delivery warranty certificates, and evidence of service centers in INDIA. Provide GeM GST invoice submission and GST payment confirmation screenshot to satisfy invoicing requirements.

What are the technical specifications for LV7 STLN VF air cleaner intake?

Air Cleaner Intake must align with LV7 STLN VF 2940-72-0000613 family. While exact dimensions aren’t disclosed, ensure compatibility with military intake interfaces and supply chain quality controls; confirm OEM warranty and service support coverage with India-based centers.

When does quantity variation apply in this Indian Army tender?

The Purchaser may increase or decrease quantity up to 50% at contract award and during the currency of the contract. Delivery time scales are based on (additional/original) × original delivery period with a minimum of 30 days.

What warranty and after-sales support are expected for bidders?

A 2-year warranty from final acceptance is required. OEM warranty certificates must accompany goods; establish installation, commissioning, training, troubleshooting, and maintenance services nationwide in INDIA with listed service centers near consignee locations.

What is required for GST invoicing on GeM for this tender?

Provide a scanned GST invoice on GeM and a screenshot confirming GST payment. Ensure GSTIN is visible on the invoice and align with GeM portal submission requirements for payment processing.

What is the post-dispatch inspection process for this supply?

Post Receipt Inspection at the consignee site is carried out by a nominated agency (BOO). Pre-dispatch inspection is not mandatory unless ATC specifies; ensure readiness for on-site verification before acceptance.

Are OEM authorizations required for all items in this tender?

Yes, bidders should provide OEM authorizations where applicable, especially for LV7 STLN VF series components; ensure the authorization covers supply, warranty, and after-sales service through India-based centers.