TenderDekho Logo
GEM

Indian Oil Corporation Limited Marketing Division Spares Procurement Tender Bhojpur Bihar 2026 - ISM 25% Quantity Variation, 2204110 INR

Bid Publish Date

03-Feb-2026, 9:50 pm

Bid End Date

17-Feb-2026, 8:00 pm

Value

₹22,04,110

Progress

Issue03-Feb-2026, 9:50 pm
Technical17-02-2026 13:12:23
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

5674

Category

Spares 76

Bid Type

Two Packet Bid

Categories 25

Tender Overview

The procurement is led by the Indian Oil Corporation Limited (IOC), specifically the Marketing Division, for a broad range of spare parts across 77 line items located in Bhojpur, Bihar (PIN 802152). The estimated contract value is ₹2,204,110.00, with the scope limited to the supply of Goods (no services). A notable bid term allows the purchaser to adjust quantities by up to ±25% during and after contract formation, at contracted rates, with delivery timelines linked to the original or extended delivery period. The tender emphasizes the need for mandatory certificates and documentary uploads; no standard technical specifications are provided in the available data, but the breadth of 77 items implies a wide assortment of spares under a single procurement drive. This structure favors bidders capable of sourcing diverse spares and meeting a unified delivery schedule. A distinctive feature is the option clause for quantity variation, which directly affects planning, pricing, and inventory commitments for bidders. The procurement aligns with IOC’s supplier framework for ready-to-dispatch spares across multiple categories.

Technical Specifications & Requirements

  • No explicit technical specifications are published in the provided data. The BoQ lists 77 items, all labeled as spares across multiple sub-categories, implying a broad hardware/software spare parts scope.
  • Estimated value: ₹2,204,110.00; bid must cover all cost components (scope of supply states: “Only supply of Goods”).
  • Delivery terms reference a flexible schedule driven by the option clause: quantity increases/decreases up to 25%; delivery period to commence from the last delivery order date; extended delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
  • Buyer-added terms require bidders to upload all applicable certificates and documents; ATC/corrigendum attachments may specify additional compliance.
  • With 77 items, bidders should prepare to fulfill a wide assortment of spare parts with potentially variable specifications.

Terms, Conditions & Eligibility

  • EMD amount and exact payment terms are not disclosed in the provided data; bidders should expect standard IOC procurement EMD requirements per the bid document.
  • Scope: “Scope of supply” indicates Only supply of Goods; no installation or commissioning services included.
  • Certificates: Bidders must upload all certificates/documents sought in the Bid Document and ATC; non-compliance may lead to rejection.
  • Delivery: Flexible quantity adjustments exist; ensure supply chain readiness to adhere to 25% quantity variation and related delivery calculations.
  • Documentation: Prepare GST registration, PAN, experience certificates, financial statements, and any OEM authorizations as applicable to the 77-item spare parts category.
  • Compliance: Adhere to any unlisted but attached ATC/Corrigendum terms in the final bid document.

Key Specifications

  • Product category: Spares 1-77 items across multiple sub-categories

  • Estimated contract value: ₹2,204,110.00

  • Scope: Only supply of Goods (no services)

  • Quantity variation: up to ±25% of bid quantity; extended delivery time formula

  • Delivery start and period: linked to last delivery order date with minimum 30 days for extended period

  • Certificates: mandatory uploads as per ATC and Corrigendum

  • BoQ shows 77 items; no explicit technical specs provided in the data

Terms & Conditions

  • Quantity variation up to 25% at contract placement and during currency

  • Delivery period tied to original/extended delivery dates with minimum 30 days when extended

  • Mandatory certificates and ATC-compliant documents required for bid acceptance

Important Clauses

Payment Terms

Not disclosed in the available data; bidders must refer to bid documents/ATC for exact terms.

Delivery Schedule

Delivery timeline is based on original last delivery order date; additional time calculated by the quantity change formula with a minimum of 30 days.

Penalties/Liquidated Damages

Not specified in the provided data; bidders should review ATC for LD or penalty provisions.

Bidder Eligibility

  • Eligibility to supply spare parts for government procurement

  • Compliance with certificate uploads as per IOC ATC

  • Ability to meet delivery schedules with ±25% quantity variation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Spares 1 , Spares 2 , Spares 3 , Spares 4 , Spares 5 , Spares 6 , Spares 7 , Spares 8 , Spares 9 , Spares 10 , Spares 11 , Spares 12 , Spares 13 , Spares 14 , Spares 15 , Spares 16 , Spares 17 , Spares 18 , Spares 19 , Spares 20 , Spares 21 , Spares 22 , Spares 23 , Spares 24 , Spares 25 , Spares 26 , Spares 27 , Spares 28 , Spares 29 , Spares 30 , Spares 31 , Spares 32 , Spares 33 , Spares 34 , Spares 35 , Spares 36 , Spares 37 , Spares 38 , Spares 39 , Spares 40 , Spares 41 , Spares 42 , Spares 43 , Spares 44 , Spares 45 , Spares 46 , Spares 47 , Spares 48 , Spares 49 , Spares 50 , Spares 51 , Spares 52 , Spares 53 , Spares 54 , Spares 55 , Spares 56 , Spares 57 , Spares 58 , Spares 59 , Spares 60 , Spares 61 , Spares 62 , Spares 63 , Spares 64 , Spares 65 , Spares 66 , Spares 67 , Spares 68 , Spares 69 , Spares 70 , Spares 71 , Spares 72 , Spares 73 , Spares 74 , Spares 75 , Spares 76 , Spares 77

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8927559.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 77 Items Sign in for GEM prices

#1

Spares 1

Sprocket 14 tee

40 pieces Delivery: 180 days
#2

Spares 2

Sprocket 14 tee

40 pieces Delivery: 180 days
#3

Spares 3

Sprocket 8 teet

120 pieces Delivery: 180 days
#4

Spares 4

Shaft 60 x850 m

10 pieces Delivery: 180 days
#5

Spares 5

Shaft 65x850 mm

10 pieces Delivery: 180 days
#6

Spares 6

Plummer block 1

20 pieces Delivery: 180 days
#7

Spares 7

Plummer block 2

20 pieces Delivery: 180 days
#8

Spares 8

Conveyor teflon

1,350 pieces Delivery: 180 days
#9

Spares 9

UHM Taper strip

100 pieces Delivery: 180 days
#10

Spares 10

UHM E Plate for

16 pieces Delivery: 180 days
#11

Spares 11

Clamping roller

100 pieces Delivery: 180 days
#12

Spares 12

Double stopper

5 pieces Delivery: 180 days
#13

Spares 13

Ball valve 1 by 2

5 pieces Delivery: 180 days
#14

Spares 14

Ball valve 3 by 4

5 pieces Delivery: 180 days
#15

Spares 15

Ball valve 1

5 pieces Delivery: 180 days
#16

Spares 16

Allen bolt 4x25

150 pieces Delivery: 180 days
#17

Spares 17

Allen bolt 5x25

150 pieces Delivery: 180 days
#18

Spares 18

Allen bolt 6x25

150 pieces Delivery: 180 days
#19

Spares 19

Timer delay val

1 pieces Delivery: 180 days
#20

Spares 20

Push button

6 pieces Delivery: 180 days
#21

Spares 21

Pull button

6 pieces Delivery: 180 days
#22

Spares 22

DNC-50 Sealkit

15 pieces Delivery: 180 days
#23

Spares 23

HGL-1 by 4 NRV Fes

16 pieces Delivery: 180 days
#24

Spares 24

Quick exhaust 1

20 pieces Delivery: 180 days
#25

Spares 25

Stopper pad

100 pieces Delivery: 180 days
#26

Spares 26

WT24 Diffuse se

4 pieces Delivery: 180 days
#27

Spares 27

WL24 Reflective

4 pieces Delivery: 180 days
#28

Spares 28

Magnetic Reed s

10 pieces Delivery: 180 days
#29

Spares 29

Float valve S.S

5 pieces Delivery: 180 days
#30

Spares 30

Spring balancer

2 pieces Delivery: 180 days
#31

Spares 31

Filling adapter

2 pieces Delivery: 180 days
#32

Spares 32

Pneumatic 1

50 pieces Delivery: 180 days
#33

Spares 33

Pneumatic 2

50 pieces Delivery: 180 days
#34

Spares 34

Pneumatic 3

50 pieces Delivery: 180 days
#35

Spares 35

Pneumatic 4

50 pieces Delivery: 180 days
#36

Spares 36

Pneumatic 5

50 pieces Delivery: 180 days
#37

Spares 37

Pneumatic 6

50 pieces Delivery: 180 days
#38

Spares 38

Pneumatic 7

50 pieces Delivery: 180 days
#39

Spares 39

Pneumatic 8

50 pieces Delivery: 180 days
#40

Spares 40

Pneumatic 9

50 pieces Delivery: 180 days
#41

Spares 41

Pneumatic 10

50 pieces Delivery: 180 days
#42

Spares 42

Pneumatic 11

50 pieces Delivery: 180 days
#43

Spares 43

Straight equal 1

25 pieces Delivery: 180 days
#44

Spares 44

Reducer fitting 1

25 pieces Delivery: 180 days
#45

Spares 45

Straight equal 2

25 pieces Delivery: 180 days
#46

Spares 46

Reducer fitting 2

25 pieces Delivery: 180 days
#47

Spares 47

Straight equal 3

25 pieces Delivery: 180 days
#48

Spares 48

Reducer fitting 3

25 pieces Delivery: 180 days
#49

Spares 49

Straight equal 4

25 pieces Delivery: 180 days
#50

Spares 50

Reducer fitting 4

25 pieces Delivery: 180 days
#51

Spares 51

Straight equal 5

25 pieces Delivery: 180 days
#52

Spares 52

Reducer fitting 5

25 pieces Delivery: 180 days
#53

Spares 53

Straight equal 6

25 pieces Delivery: 180 days
#54

Spares 54

Tee fitting 4x4

25 pieces Delivery: 180 days
#55

Spares 55

Tee fitting 6x6

25 pieces Delivery: 180 days
#56

Spares 56

Tee fitting 8x8

25 pieces Delivery: 180 days
#57

Spares 57

Tee fitting 10x

25 pieces Delivery: 180 days
#58

Spares 58

Tee fitting 12x

25 pieces Delivery: 180 days
#59

Spares 59

Tee fitting 16x

25 pieces Delivery: 180 days
#60

Spares 60

Y Jointer 1

25 pieces Delivery: 180 days
#61

Spares 61

Y Jointer 2

25 pieces Delivery: 180 days
#62

Spares 62

Y Jointer 3

25 pieces Delivery: 180 days
#63

Spares 63

Y Jointer 4

25 pieces Delivery: 180 days
#64

Spares 64

Y Jointer 5

25 pieces Delivery: 180 days
#65

Spares 65

Y Jointer 6

25 pieces Delivery: 180 days
#66

Spares 66

Pneumatic pip 1

200 pieces Delivery: 180 days
#67

Spares 67

Pneumatic pip 2

200 pieces Delivery: 180 days
#68

Spares 68

Pneumatic pip 3

200 pieces Delivery: 180 days
#69

Spares 69

Pneumatic pip 4

200 pieces Delivery: 180 days
#70

Spares 70

Pneumatic pip 5

200 pieces Delivery: 180 days
#71

Spares 71

Pneumatic cyli 1

4 pieces Delivery: 180 days
#72

Spares 72

Pneumatic cyli 2

5 pieces Delivery: 180 days
#73

Spares 73

Pneumatic cyli 3

4 pieces Delivery: 180 days
#74

Spares 74

Parker LPG Hose 1

24 pieces Delivery: 180 days
#75

Spares 75

Parker LPG Hose 2

24 pieces Delivery: 180 days
#76

Spares 76

DETACHABLE TYPE

1,000 pieces Delivery: 180 days
#77

Spares 77

Frieght

1 unit Delivery: 180 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates (relevant to spare parts supply)

4

Financial statements (audited, if available)

5

EMD submission document (amount not disclosed in data, follow bid doc)

6

Technical bid documents demonstrating product availability

7

OEM authorization letters (if bidding as authorized supplier)

8

Certificates/ATC documents referenced by Bid Specific ATC

9

Any other certificates sought in the final bid document

Technical Results

S.No Seller Item Date Status
1
A S MECHANICAL SYSTEMS PRIVATE LIMITED   Under PMA
-17-02-2026 13:12:23
2
ANAND FABS SYSTEM PRIVATE LIMITED   Under PMA
-17-02-2026 17:25:16
3
HT PROCESS CONTROLS PRIVATE LIMITED   Under PMA
-14-02-2026 15:28:30
4
J.M. Engineering works   Under PMA
-16-02-2026 20:16:09
5
K D Enterprises   Under PMA
-17-02-2026 17:19:49

Financial Results

Rank Seller Price Item
L1
ANAND FABS SYSTEM PRIVATE LIMITED(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Spares 1,Spares 2,Spares 3,Spares 4,Spares 5,Spares 6,Spares 7,Spares 8,Spares 9,Spares 10,Spares 1
L2
A S MECHANICAL SYSTEMS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Spares 1,Spares 2,Spares 3,Spares 4,Spares 5,Spares 6,Spares 7,Spares 8,Spares 9,Spares 10,Spares 1
L3
J.M. Engineering works (MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : Spares 1,Spares 2,Spares 3,Spares 4,Spares 5,Spares 6,Spares 7,Spares 8,Spares 9,Spares 10,Spares 1
L4
K D Enterprises (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Spares 1,Spares 2,Spares 3,Spares 4,Spares 5,Spares 6,Spares 7,Spares 8,Spares 9,Spares 10,Spares 1
L5
HT PROCESS CONTROLS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Spares 1,Spares 2,Spares 3,Spares 4,Spares 5,Spares 6,Spares 7,Spares 8,Spares 9,Spares 10,Spares 1

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for IOC spares tender in Bhojpur Bihar 2026

Bidders should submit GST, PAN, and experience certificates, plus all mandatory documents in the bid, including OEM authorizations if applicable. The tender allows ±25% quantity variation and requires compliance with ATC/corrigendum certificates. Ensure the 77-item BoQ can be fulfilled with supply-ready parts and prepare delivery plans accordingly.

What documents are required for IOC spares procurement in Bihar

Required documents include GST certificate, PAN, audited financial statements, experience certificates for spare parts supply, EMD submission, technical bid documents, and OEM authorizations. Ensure ATC/corrigendum certificates are uploaded as specified and align with the 77-item spares scope.

What are the delivery terms for IOC spares tender 2026

Delivery terms follow the option clause: quantity adjustments up to 25%, with delivery periods starting from the last delivery order date. If extended, time is calculated by (increased quantity/original quantity) × original delivery period, minimum 30 days.

What is the estimated value for IOC spares procurement in Bhojpur

The estimated contract value is ₹2,204,110.00. Bidders should price for all cost components in the bid; scope explicitly states Only supply of Goods for 77 items, with potential quantity variations.

What standards or certifications are required for IOC spares tender

The bid requires upload of all certificates in the Bid Document and ATC. While explicit standards are not listed in the data, bidders should be prepared for IS/ISO certifications applicable to spare parts and OEM authorizations where required by final ATC.

How does the 25% quantity variation affect pricing for IOC spares

Quantities may increase or decrease by up to 25% at contract award and during currency. Prices must be firm for contracted quantities; bidders should include contingencies for fluctuating volumes and align delivery capacity accordingly.

What makes IOC spares procurement in Bihar unique for bidders

The single procurement drive covers 77 spare-item lines with a unified delivery schedule and a flexible quantity variation clause. The emphasis on mandatory certificate uploads and ATC compliance plus the large item mix requires robust sourcing, inventory planning, and supplier readiness for timely dispatch.

When is the submission deadline for IOC spares tender in 2026

The exact submission deadline is not provided in the available data; bidders should refer to the live bid document, ATC, and corrigenda for the precise date and the required submission format.