TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd Gas Equipment Components Tender Bareilly Uttar Pradesh 0-400 BAR Gauge SS316 Valve 2026

Bid Publish Date

14-Sep-2026, 11:52 pm

Bid End Date

15-Oct-2026, 3:00 pm

EMD

₹4,36,000

Generate Docs

Progress

Issue14-Sep-2026, 11:52 pm
Corrigendum12-Oct-2026
AwardPending

Tender Overview

Organization: Hindustan Petroleum Corporation Ltd. The procurement covers gas equipment components including gauges (0-400 BAR), SS316 valve assemblies, 3 by 4 inch SS316 tubes, tees, crosses, and related manifold blocks for CNG-related installations. Estimated value is not disclosed, but an EMD of ₹436,000 applies. Delivery location targets a CNG network area around UP (Etah-Farukhabad-Hardoi region) with installation to occur at Mother/Daughter/Baseline booster stations in UP. Quantity flexibility up to 25% may be exercised during contract execution, stressing supply-chain adaptability. The scope includes shifting of spare CNG cascade units and associated instrumentation. This tender is positioned as a multi-item, supplier-inclusive gas-component procurement for HPCL UP operations.

Technical Specifications & Requirements

  • Product/Service Names: Gauge assemblies (0-400 BAR), Temp/Bimetal gauges, SAFETY valves, SS316 manifold blocks, 3 by 4 inch SS316 tubes, 3 by 4 inch tees/crosses, 2-way valves, pressure gauge adapters, bleed valves, male connectors, OD MNPT fittings.
  • Key Dimensions/Capacities: 100MM gauge, 0-400 BAR range, 3x4 inch tubing and fittings.
  • Materials/Standards: SS316 stainless components; emphasis on corrosion resistance for gas service.
  • Delivery/Work Scope: On-site supply and installation at UP CNG network stations; includes shifting spare cascades and fixing of manifolds and tubing assemblies.
  • EMD/Value Signals: EMD amount specified as ₹436,000; exact line-item values not disclosed within BOQ.
  • Compliance Context: Integrity Pact compliance and bid-document caveats apply; delivery schedule linked to original and extended delivery periods.

Terms, Conditions & Eligibility

  • EMD & Documentation: EMD ₹436,000; submit PAN, GSTIN, cancelled cheque, EFT mandate with bid.
  • Delivery Terms: Multi-site delivery in UP; option to increase quantity by up to 25% at contracted rates; extended delivery time formula based on quantity variance with a minimum 30 days.
  • Integrity Pact: Upload signed integrity pact per buyer policy with bid.
  • Payment & Invoicing: Invoice to be raised in consignee name with consignee GSTIN.
  • Liability & Sub-contracting: No assignment without consent; joint liability with assignee for contract performance.
  • Certificates: Ensure all required certificates/documents are uploaded; non-submission may lead to rejection.

Key Specifications

    • Gauge: 0-400 BAR, TEMP/BIMETAL gauge options
    • Valves: SS316 safety valve assemblies
    • Piping: 3 by 4 inch SS316 tubes, 3 by 4 inch tees, 3 by 4 inch crosses
    • Fittings: 2 Way Valve, Pressure Gauge Adapter, Bleed Valve, Male Connector (3 by 4 inch OD x 3 by 4 inch MNPT)
    • Manifold: SPLY and FIX of MANIFOLD BLOCK
    • Capacity/Volume: 3000 L water capacity and 4500 L water capacity mentioned in category header, not explicit in scope
    • Installation: SPLY and FIX of associated components for CNG cascade and pressure instrumentation

Terms & Conditions

  • Delivery flexibility up to 25% quantity change at contracted rates

  • Integrity Pact mandatory with bid submission

  • Invoices to be raised in consignee name with GSTIN

  • UP-based multi-site delivery and installation under HPCL scope

  • EMD ₹436,000 and essential document submissions required

Important Clauses

Payment Terms

Invoice in consignee name with GSTIN; no stated advance, terms align to contract delivery milestones per HPCL standard.

Delivery Schedule

Delivery period linked to original order date; option to extend time proportionally for increased quantity; minimum 30 days for any extended delivery.

Penalties/Liquidated Damages

Not explicitly stated in the excerpt; ensure bidder reviews contract for LDs tied to late delivery or non-performance.

Bidder Eligibility

  • Registered supplier with GSTIN and valid PAN

  • Experience in supplying gas-related instrumentation and SS316 components

  • Ability to perform installation at CNG booster stations in UP and comply with Integrity Pact

Advertisement

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1690

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

TESTING 3000 L WATER CAPACITY , TESTING 4500 L WATER CAPACITY , Shifting of spare CNG cascade , GAUGE,PRE,0 TO 400 BAR , GAUGE,TEMP,BIMETAL,100MM , VLV,REL,SAFETY,SS316 , SPLY AND FIX OF MANIFOLD BLOCK , SPLY AND FIX OF 3 by 4inch SS 316 Tube , SPLY AND FIX OF 3by 4 inch Tee , SPLY AND FIX OF 3by 4 inch Cross , SPLY AND FIX OF 3by 4 inch 2 Way Valve , SPLY AND FIX OF Pressure Gauge Adapter , SPLY AND FIX OF Bleed Valve , SF OF Male connector, 3by 4 inch OD X 3by 4 inch MNPT

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

33

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Bareilly

Delivery Pincodes

243122

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ambikesh Dixit243122,1st FLOOR, SA 72/79 D D PURAM, BAREILLY - 243122BareillyUttar Pradesh24312264730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9892757.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

TESTING 3000 L WATER CAPACITY

TESTING 3000 L

64 pieces Delivery: 730 days
#2

TESTING 4500 L WATER CAPACITY

TESTING 4500 L

88 pieces Delivery: 730 days
#3

Shifting of spare CNG cascade

Shifting of spare

36 pieces Delivery: 730 days
#4

GAUGE,PRE,0 TO 400 BAR

GAUGE,Pressure

300 pieces Delivery: 730 days
#5

GAUGE,TEMP,BIMETAL,100MM

GAUGE,TEMP

150 pieces Delivery: 730 days
#6

VLV,REL,SAFETY,SS316

VLV,REL,SAFETY

150 pieces Delivery: 730 days
#7

SPLY AND FIX OF MANIFOLD BLOCK

MANIFOLD BLOCK

150 pieces Delivery: 730 days
#8

SPLY AND FIX OF 3 by 4inch SS 316 Tube

3 by 4inch SS 316 Tube

100 pieces Delivery: 730 days
#9

SPLY AND FIX OF 3by 4 inch Tee

3by 4 inch Tee

36 pieces Delivery: 730 days
#10

SPLY AND FIX OF 3by 4 inch Cross

3by 4 inch Cross

80 pieces Delivery: 730 days
#11

SPLY AND FIX OF 3by 4 inch 2 Way Valve

3by 4 inch 2 Way Valve

36 pieces Delivery: 730 days
#12

SPLY AND FIX OF Pressure Gauge Adapter

SF of Pressure Gauge Adapter

150 pieces Delivery: 730 days
#13

SPLY AND FIX OF Bleed Valve

Bleed Valve

150 pieces Delivery: 730 days
#14

SF OF Male connector, 3by 4 inch OD X 3by 4 inch MNPT

Male connector, 3by 4 inch OD X 3by 4 inch MNPT

200 pieces Delivery: 730 days

Categories 23

Corrigendum Updates

3 Updates
#1

Update

12-Oct-2026

Extended Deadline

15-Oct-2026, 9:30 am

Opening Date

16-Oct-2026, 9:30 am

#2

Update

05-Oct-2026

Extended Deadline

12-Oct-2026, 9:30 am

Opening Date

13-Oct-2026, 9:30 am

#3

Update

28-Sep-2026

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by Bank

5

Integrity Pact signed copy

6

Technical compliance certificates (if any)

7

OEM authorizations (if required)

8

Experience certificates for similar gas equipment supply

9

GST Invoice/final billing prerequisites (consignee GSTIN)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for HPCL gas components tender in Bareilly UP 2026

Bidders must meet eligibility, submit PAN, GSTIN,Cancelled Cheque, EFT Mandate, and Integrity Pact. Provide technical compliance certificates, OEM authorizations as required, and ensure EMD of ₹436,000 is paid. Include detailed bill-of-materials for gauges, SS316 valves, and 3x4 inch fittings. Follow delivery terms and share installation capabilities at UP CNG stations.

What documents are required for HPCL UP gas equipment procurement

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by Bank, signed Integrity Pact, and any OEM authorizations. Also attach experience certificates for similar gas equipment supply and technical compliance documents to demonstrate capability to install gauges and SS316 components.

Which items are covered under HPCL tender for gauges and valves

The scope lists 0-400 BAR gauges, Temp/bimetal gauges, SS316 safety valves, 3 by 4 inch SS316 tubes, tees, crosses, two-way valves, pressure gauge adapters, bleed valves, and compatible male connectors with MNPT fittings, intended for CNG cascade and manifold blocks.

What is the estimated value and EMD for this HPCL tender

The tender requires an EMD of ₹436,000. The exact estimated contract value is not disclosed; however, the scope includes multiple gas-component items with potential quantity variations up to 25% as per the option clause.

What are the delivery terms for HPCL CNG equipment in UP

Delivery is multi-site within UP (Etah-Farukhabad-Hardoi region) with installation at booster and stations. Quantity increases up to 25% are allowed at contracted rates; extended delivery time scales with additional quantity, minimum 30 days.

What are the compliance requirements for integrity pact in HPCL tender

Bidders must upload a signed Integrity Pact as per HPCL policy. This must accompany the bid submission and is mandatory for bid acceptance; non-compliance may lead to bid rejection.

What is the invoice payment condition for HPCL UP supply

Invoices must be raised in the consignee name with the consignee GSTIN. No explicit early payment terms are stated here; payments align with HPCL contract milestones and verification of delivery/installation.

What is the scope of installation and commissioning

Scope includes supply and on-site installation and commissioning of gauge assemblies, SS316 valves, and piping for CNG cascade setups at UP stations; collaboration with HPCL for acceptance testing and handover is implied.