TenderDekho Logo
Closed GEM

Bids are Invited For refurbishment and modification of stp fifty kld,refurbishment and modification of stp fifty kld,ref in NAGPUR, MAHARASHTRA

Bid Publish Date

27-Sep-2025, 1:57 pm

Bid End Date

13-Oct-2025, 2:00 pm

EMD

₹2,10,455

Progress

Issue27-Sep-2025, 1:57 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3196

Category

refurbishment and modification of stp niney kld

Bid Type

Two Packet Bid

Categories 115

AGITATORS BP INSTRUMENT FILTER CANDLES CASHEW NUT ELECTRICAL LAB EQUIPMENTS SAND CONTROL EQUIPMENTS FILTERS ALTERATION OF BUILDING ALTERATION AIR POLLUTANT SAMPLER WATER TREATMENT CONSUMABLES WATER TREATMENT PLANT MOSQUITO REPELLENT AIR COOLED ENGINE DESERT COOLER CABLE LADDER WIRING SPECIFICATION LABORATORY WATER PURIFICATION EQUIPMENT REPLACEMENT OF TUBE HEATING EQUIPMENTS SOLAR WATER SYSTEM LAWN ACTIVATED CARBON LED LIGHT PANEL AIR REGULATORS WELL TESTING EQUIPMENTS RENEWAL OF BLDG PIPING SIZING SCREEN NON CONVENTIONAL FILTER PUMP SPARE PARTS INSTRUMENTATION CABLE LABORATORY TOOLS NON CONVENTIONAL WATER TREATMENT AIR DUCT VACUUM FILTERS ELECTRICAL PANEL MILITARY VEHICLE BED AIR PURIFIERS WATER SUPPLY PANEL INDICATING AND RECORDING INSTRUMENTS NON CONVENTIONAL WTP CABLING FILTER MEDIA PRESSURE INDICATORS BUS TERMINAL HEAT TRANSFER OIL ENERGY METER BIOSEPARATION FILTER SOLAR HEATING DISTRIBUTION AND CONDITIONING ACIDIZING FLOW METERS FLOW REGULATOR WATER STORAGE AND SUPPLY ACOUSTIC TREATMENT METER READING WORK FLUID MECHANICS EQUIPMENT VESSEL FITMENT ACOUSTICAL TREATMENT AIR BLOWER BUILDING CABLE RF PASSIVE COMPONENTS FILTERING MACHINERY LABORATORY PRESSES PNEUMATIC PRESSURE GAUGE BLOWERS OR DRYERS EQUIPMENT FOR LAB WATER PURIFICATION PRESSURE REGULATOR TERRACE TUBE TANK CLEANER FLOW SWITCHES WATER SUPPLY MATERIAL PRESSURE MEASURING AND CONTROL INSTRUMENTS CENTRIFUGAL COMPRESSORS EQUIPMENT FOR LABORATORY FLOW DETECTOR FUEL PUMP TURBINE PUMPS AIRCRAFT HYDRAULIC SYSTEMS OVER HEAD TANK TUBES AND PIPES HEATING EQUIPMENT SPARES ANAESTHESIA MACHINE LABORATORY INSTRUMENT DUCTING CABLE AIR DIFFUSER BIOLOGICAL BATH FIRE BREATHING APPARATUS LABORATORY EQUIPMENT AND SUPPLIES SOLAR WATER HEATER WATER FILTERS LABORATORY SEPARATORS MACHINE SOLAR GEYSER GAUGE PAINT FILTERS EQUIPMENTS FOR LAB ACTIVATED CARBON EQUIPMENT WEIGH BATCHER LAB INSTRUMENT PEB UPVC PIPE PAINTS CABLE TRAY FAN BAR BOYLES APPARATUS

Central Board Of Direct Taxes (cbdt) announces a tender for refurbishment and modification of stp fifty kld, refurbishment and modification of stp seventy five kld, refurbishment and modification of stp seventy five point one kld, refurbishment and modification of stp niney kld, refurbishment and modification of stp niney kl in NAGPUR, MAHARASHTRA. Quantity: 3196. Submission Deadline: 13-10-2025 14: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

refurbishment and modification of stp fifty kld , refurbishment and modification of stp seventy five kld , refurbishment and modification of stp seventy five point one kld , refurbishment and modification of stp niney kld , refurbishment and modification of stp niney kl

Authority Records

MINISTRY OF FINANCEREVENUE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8408429.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 47 Items Sign in for GEM prices

#1

refurbishment and modification of stp fifty kld

FRP in All MS Tanks

2,160 sqaure feet Delivery: 10 days
#2

refurbishment and modification of stp fifty kld

Platform and Railing Erection Work

1 lot Delivery: 10 days
#3

refurbishment and modification of stp fifty kld

Replacement Of ACF And MGF Filter Media.

1 lot Delivery: 10 days
#4

refurbishment and modification of stp fifty kld

Cable Tray Installation (100 x50Mm) G. I

25 foot Delivery: 10 days
#5

refurbishment and modification of stp fifty kld

Electrical Panel Repairing and Dressing.

1 lot Delivery: 10 days
#6

refurbishment and modification of stp fifty kld

Replacement Of Pressure Gauge (7Kg).

2 number Delivery: 10 days
#7

refurbishment and modification of stp fifty kld

Replacement Of Modal-2427 MGF Vessel.

1 number Delivery: 10 days
#8

refurbishment and modification of stp fifty kld

Replacement Of Motor Fan Cover andTerminal Cover

4 number Delivery: 10 days
#9

refurbishment and modification of stp fifty kld

Replacement Of Diffusers With Piping and Fittings

1 lot Delivery: 10 days
#10

refurbishment and modification of stp fifty kld

Tube Pack Media Replacement.

1 lot Delivery: 10 days
#11

refurbishment and modification of stp fifty kld

MBBR Media Replacement.

1 lot Delivery: 10 days
#12

refurbishment and modification of stp fifty kld

Equipments and Piping Paints Work.

1 lot Delivery: 10 days
#13

refurbishment and modification of stp fifty kld

Pump Replacement (3Hp) Submersible Type.

1 number Delivery: 10 days
#14

refurbishment and modification of stp fifty kld

Both Air Blower Servicing.

2 number Delivery: 10 days
#15

refurbishment and modification of stp fifty kld

New Outlet Flow Meter Installation.

1 number Delivery: 10 days
#16

refurbishment and modification of stp fifty kld

All Tank Cleaning For FRP Work.

1 lot Delivery: 10 days
#17

refurbishment and modification of stp fifty kld

Replacement Of Filter Feed Pump (1Hp).

2 number Delivery: 10 days
#18

refurbishment and modification of stp fifty kld

Replacement Of Bar Screen (Ms).

1 number Delivery: 10 days
#19

refurbishment and modification of stp fifty kld

Sand Media For Sludge Drying Bed.

1 lot Delivery: 10 days
#20

refurbishment and modification of stp seventy five kld

Repairing Of Air Blower 3 Hp

2 number Delivery: 10 days
#21

refurbishment and modification of stp fifty kld

Repairing Of Air Blower 7.5 Hp

2 number Delivery: 10 days
#22

refurbishment and modification of stp seventy five kld

Supply Of Bar Screen

2 number Delivery: 10 days
#23

refurbishment and modification of stp fifty kld

Supply Re-Circulation Pump

2 number Delivery: 10 days
#24

refurbishment and modification of stp seventy five kld

Servicing Of Filter Feed Pump

2 number Delivery: 10 days
#25

refurbishment and modification of stp fifty kld

Replacement Of Pressure Sand Filters

1 number Delivery: 10 days
#26

refurbishment and modification of stp seventy five kld

Installation Of Activated Carbon Filter

1 number Delivery: 10 days
#27

refurbishment and modification of stp fifty kld

Installation Of Electromagnetic Flow Meter

1 number Delivery: 10 days
#28

refurbishment and modification of stp seventy five kld

Installation Of Chlorine Dosing System

1 number Delivery: 10 days
#29

refurbishment and modification of stp fifty kld

Installation Of Air Grid Pipeline and Air Diffuser

1 lot Delivery: 10 days
#30

refurbishment and modification of stp seventy five kld

Supply and Installation Of Mbbr Media

1 lot Delivery: 10 days
#31

refurbishment and modification of stp fifty kld

Supply and Installation Of Tube Pack Media

1 lot Delivery: 10 days
#32

refurbishment and modification of stp seventy five kld

Repairing Of Centrifuge Machine

1 number Delivery: 10 days
#33

refurbishment and modification of stp fifty kld

Platform and Stairs

1 lot Delivery: 10 days
#34

refurbishment and modification of stp seventy five kld

Repairing Of Ultrafiltration

1 set Delivery: 10 days
#35

refurbishment and modification of stp fifty kld

Installation Of MS Piping Of Plant

1 lot Delivery: 10 days
#36

refurbishment and modification of stp seventy five kld

Dressing And Fixing Of Cables And Repairing Of Electrical Panel

1 lot Delivery: 10 days
#37

refurbishment and modification of stp seventy five point one kld

FRP on Inner Side Of Aeration Tank, Tube Settler, Etc

950 square feet Delivery: 10 days
#38

refurbishment and modification of stp niney kld

Repairing Of Air Blower

4 number Delivery: 10 days
#39

refurbishment and modification of stp niney kld

Repairing Of Sludge Re-Circulation Pump

2 number Delivery: 10 days
#40

refurbishment and modification of stp niney kld

Repairing of Filter Feed Pump

2 number Delivery: 10 days
#41

refurbishment and modification of stp niney kld

Replacement of Filter Media

2 number Delivery: 10 days
#42

refurbishment and modification of stp niney kld

Installation of Electromagnetic Flow Meter

1 number Delivery: 10 days
#43

refurbishment and modification of stp niney kld

Installation of Chlorine Dosing System

1 number Delivery: 10 days
#44

refurbishment and modification of stp niney kld

Repairing of Ozonator

1 number Delivery: 10 days
#45

refurbishment and modification of stp niney kld

Replacement of Air Diffuser

1 lot Delivery: 10 days
#46

refurbishment and modification of stp niney kld

Replacement of MBBR Media

1 lot Delivery: 10 days
#47

refurbishment and modification of stp niney kl

Replacement of Tube Media

1 lot Delivery: 10 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer