Bid Publish Date
30-Sep-2026, 7:48 am
Bid End Date
17-Oct-2026, 11:00 am
Location
Progress
Hindustan Aeronautics Limited (HAL) under the Department of Defence Production invites bids for the supply of HEAT SHRINK BOOT and DR25-3/8 HEAT SHRINK TUBE. The scope is restricted to the supply of goods with no service component; the procurement is governed by HAL’s bid terms, including GST handling and a potential quantity variation of up to 50%. The offer must be accompanied by required certificates on bid opening, with a certification flow that validates compliance to the buyer’s specifications and delivery schedules. The presence of an MSE purchase preference adds competitiveness for eligible micro or small enterprises, provided they meet manufacturer criteria. Key differentiator lies in the option clause enabling delivery adjustments and extension based on bid quantities. The tender reflects strategic sourcing aligned to aerospace material handling and standardized packaging components from HAL’s Defence Production ecosystem. Unique aspects include the general alignment to standard public procurement rules with IS or industry-standard certifications to be presented at bid time.
There are no explicit technical specifications listed in the provided data. However, the requested items are defined as HEAT SHRINK BOOT and DR25-3/8 HEAT SHRINK TUBE, indicating a likely requirement for heat-shrink polymer components designed for electrical insulation and protective tubing. Buyers emphasize compliance with uploaded specifications and delivery schedules, plus certificate validation. The scope is limited to supply only; no installation or after-sales service is indicated. Bidders should anticipate standard quality checks and possible BIS/ISO-style verification for materials compatibility, alongside GST considerations and delivery readiness for HAL’s inventory systems.
Product names: HEAT SHRINK BOOT, DR25-3/8 HEAT SHRINK TUBE
Quantity/scale: not specified; scope limited to supply of goods only
Estimated value: not disclosed
Delivery: terms governed by option clause; extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Standards/Testing: must be compliant with buyer specifications; certificates/test reports required at bid opening
Brand/OEM: not explicitly restricted; ensure OEM authorizations if applicable
Quality: material safety and compatibility implied for aerospace electrical insulation
GST: bidder responsible for GST implications; reimbursement as per actuals or rate
GST responsibility lies with bidder; reimbursement follows actuals or quoted rate
Option clause permits quantity variation up to 50% with corresponding delivery extension
Purchase preference available for eligible MSEs, subject to manufacturer criteria and price matching within L-1+15%
GST treatment and reimbursement rules; no explicit payment schedule provided in data
Delivery timeline tied to original delivery period; extended time calculated via option clause with minimum 30 days
Not specified in data; subject to buyer terms and contract conditions
Must be manufacturer of offered product to avail MSE purchase preference
Must upload required certificates and test reports at bid opening
Experience in supplying similar heat shrink components for aerospace/defense contexts
Quantity
81
Category
202A142-3 HEAT SHRINK BOOT
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
202A142-3 HEAT SHRINK BOOT , DR25-3/8 HEAT SHRINK TUBE
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
NASHIK RURAL
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NASHIK RURAL | NASHIK RURAL | - | - | 54 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates related to similar product supply
Financial statements or balance sheet for last 2 years
EMD equivalent (as applicable in the bidding terms) and payment proof
Technical bid documents demonstrating adherence to heat shrink specifications
OEM authorizations or manufacturer proof (if applicable)
Compliance certificates to buyer uploaded specifications and delivery schedule
Key insights about MAHARASHTRA tender market
Bid submission requires GST registration, PAN, performance certificates, and OEM authorizations as applicable. Ensure compliance with buyer uploaded specifications and delivery schedule. The tender offers MSE purchase preference if you are the product manufacturer, with potential 25% contract value under L-1+15% rule. Prepare EMD documents per terms.
Submit GST registration, PAN, experience certificates for similar supply, financial statements, EMD proof, technical bid for HEAT SHRINK BOOT and DR25-3/8 TUBE, OEM authorization if required, and compliance certificates to buyer specifications and delivery schedules.
Delivery terms follow the option clause with up to 50% quantity variation. Delivery period adjusts proportionally to quantity changes, with a minimum extension of 30 days. Original delivery period governs calculation; extended delivery time starts after the original window.
Bidders must upload compliance certificates to buyer specifications. While explicit standards are not listed, expect ISI/ISO-like conformity checks and material safety documentation for heat shrink boots and tubes, plus testing reports confirming insulation performance.
MSE preference applies if the bidder is the product manufacturer. If L-1 is not an MSE, an MSE seller within L-1+15% can match price and secure up to 25% contract value, provided documentary evidence of MSE status is uploaded.
The data provided does not include explicit dates. Bidders should monitor the tender portal for the start/end dates and ensure bid submission documents, GST, and certificates are ready for opening as per buyer terms.
Scope is strictly the supply of goods—HEAT SHRINK BOOT and DR25-3/8 HEAT SHRINK TUBE—with no installation or service component included. Ensure all quoted prices cover complete delivery costs and GST considerations.
Eligibility requires manufacturer status for MSE preference, relevant experience certificates, financial statements, GST/PAN, EMD, OEM authorizations if applicable, and compliance certificates confirming adherence to buyer specifications and delivery schedules.