Progress
RAOrganization: Indian Army (Department Of Military Affairs) in Sonitpur, Assam. Procuring a Pallet Truck (V3) Q2 with no BOQ items listed. EMD: ₹35,100. Installation, commissioning, testing and training, if applicable, must be performed by OEM/oem-certified resource or OEM-authorised reseller. ISO 9001 certification is required for bidder or OEM. The purchaser reserves a 50% quantity option at contracted rates, with delivery time adjustments tied to the option clause. Ensure Manufacturer Authorization if bidding via authorised distributor.
Product category: Pallet Truck (V3) Q2
EMD: ₹35,100
Standards: ISO 9001
Installation: OEM/oem-certified resource or OEM-authorised reseller
Authorization: Manufacturer Authorization required for authorised distributors
Delivery: 50% quantity variation; delivery period formula; minimum 30 days
EMD of ₹35,100 must accompany bid
ISO 9001 certification required for bidder or OEM
50% quantity option with calculated delivery extension
EMD amount and payment modality as per bid; no explicit stage-wise terms provided here
Delivery period linked to original delivery date; additional time calculated by the option clause formula; minimum 30 days
Not specified in data; apply per standard tender ATC if mentioned in full terms
Not under liquidation, court receivership, or bankruptcy
ISO 9001 certified bidder or OEM
Manufacturer Authorization possible for authorized distributors
Start
01-Oct-2026, 12:00 pm
End
03-Oct-2026, 12:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
20
Past Performance
20 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Pallet Truck (V3) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
6
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sonitpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sonitpur | Sonitpur | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque
EFT Mandate copy certified by bank
Manufacturer/OEM Authorization certificate if bidding through authorized distributor
ISO 9001 certification proof (bidder or OEM)
Key insights about ASSAM tender market
Bidders must meet eligibility criteria including no liquidation status, provide PAN, GSTIN, and an EFT mandate; ensure ISO 9001 certification and Manufacturer Authorization if using an authorized distributor; submit EMD of ₹35,100 and comply with OEM installation requirements.
Submit PAN, GSTIN, Cancelled cheque, EFT Mandate certified by bank, and Manufacturer Authorization if bidding through an authorized distributor; ensure ISO 9001 certificate and any OEM documents as per ATC/corrigendum.
Specific pallet truck specs are not listed; ensure compliance with OEM installation by certified personnel, and verify ISA 9001 and any product-specific certifications; confirm product meets customer’s pallet truck category and Q2 qualification through OEM confirmation.
The recommended EMD is ₹35,100. Submit the EMD via the specified payment method with bid; ensure it accompanies the technical and financial bids to avoid rejection.
The purchaser may vary quantity up to 50% at contract placement and during currency; delivery time adjusts using the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Installation, commissioning, testing and training, if applicable, must be conducted by the OEM or OEM-certified resource or an OEM-authorised reseller; ensure requisite authorization and schedule alignment with OEM teams.
Bidders must hold ISO 9001 certification for either the bidder or the OEM; lack of this certification may lead to rejection of the bid per bid document requirements.
If bidding via an authorised distributor, submit a Manufacturer Authorization form containing the distributor's name, designation, address, email, and phone number to establish OEM credentials.