Distributor Head assy,Supply Pump,Housing,Drive Shaft,Crank oil seal,Fan Belt Bus,Needle Roller bea
Indian Army
GURDASPUR, PUNJAB
Progress
Quantity
12
Category
BEARING TAPERED ROLLER
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for multiple mechanical assemblies and spares, including BEARING TAPERED ROLLER, AIR PRESSURE PIPE ASY, MASTER CYLINER REPAIR KIT, RATCHET KICK STARTER, FAN BELT DIMENSIONAL DETAILS OC LENGTH, CAP ASY NOISE SUPPRESSOR, BULB HEAD LIGHT HIS 12, and STUD BOLT. The location is GURDASPUR, PUNJAB (143505). Eight total line items are listed in the BOQ, with undefined quantities. The procurement emphasizes compliance with detailed drawings, post-award design approvals, and a 2-year warranty period on supplied products. The buyer reserves 25% quantity variation both pre- and post-award, at contracted rates, and delivery timelines linked to the original or extended delivery period.
Eight proposed items in BOQ: BEARING TAPERED ROLLER, AIR PRESSURE PIPE ASY, MASTER CYLINER REPAIR KIT, RATCHET KICK STARTER, FAN BELT DIMENSIONAL DETAILS OC LENGTH, CAP ASY NOISE SUPPRESSOR, BULB HEAD LIGHT HIS 12, STUD BOLT
Warranty: 2 years from final acceptance
Delivery: commencement from last date of original delivery order; option-based extension formula: (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Drawings: Detailed Design Drawings required within 15 days of award; approval or modification list within 15 days
Eligibility: bidders must show turnover as per bid document and must be non-liquidating, non-bankrupt
Documentation: PAN, GST, cancelled cheque, EFT mandate required for vendor code creation
EMD/financial performance not explicitly quantified in data; bidders should rely on bid document for turnover thresholds.
Delivery extensions permitted based on option clause; LD exemptions apply if buyer delays in drawing approval.
Warranty and support terms specify a 2-year warranty period post-acceptance.
Not specified in data; bidders should anticipate standard government terms per contract after acceptance.
Delivery timeline linked to approved drawings; extended delivery period calculated as (increase/original) × original delivery period with minimum 30 days.
Not specified; implied LD terms may apply per standard procurement rules; bidders should verify prevailing terms.
Must not be in liquidation, court receivership, or similar proceedings
Must meet turnover criteria as per bid document (last 3 financial years)
Must provide PAN, GST, cancelled cheque, and EFT mandate for vendor code creation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
BEARING TAPERED ROLLER , AIR PRESSURE PIPE ASSY , MASTER CYLINER REPAIR KIT , RATCHET KICK STARTER , FAN BELTDIMESNIONAL DETAILS OC LENGHT , CAP ASSY NOISE SUPPRESSOR , BULB HEAD LIGHT HIS 12 , STUD BOLT
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GURDASPUR, PUNJAB
Indian Army
GURDASPUR, PUNJAB
Indian Army
Indian Army
Indian Army
JHANSI, UTTAR PRADESH
Tender Results
Loading results...
BEARING TAPERED ROLLER
BEARING TAPERED ROLLER
AIR PRESSURE PIPE ASSY
AIR PRESSURE PIPE ASSY
MASTER CYLINER REPAIR KIT
MASTER CYLINER REPAIR KIT
RATCHET KICK STARTER
RATCHET KICK STARTER
FAN BELTDIMESNIONAL DETAILS OC LENGHT
FAN BELTDIMESNIONAL DETAILS OC LENGHT
CAP ASSY NOISE SUPPRESSOR
CAP ASSY NOISE SUPPRESSOR
BULB HEAD LIGHT HIS 12
BULB HEAD LIGHT HIS 12
STUD BOLT
STUD BOLT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BEARING TAPERED ROLLER | BEARING TAPERED ROLLER | 1 | nos | con34.mod.udhampur | 10 | |
| 2 | AIR PRESSURE PIPE ASSY | AIR PRESSURE PIPE ASSY | 1 | nos | con34.mod.udhampur | 10 | |
| 3 | MASTER CYLINER REPAIR KIT | MASTER CYLINER REPAIR KIT | 1 | nos | con34.mod.udhampur | 10 | |
| 4 | RATCHET KICK STARTER | RATCHET KICK STARTER | 1 | nos | con34.mod.udhampur | 10 | |
| 5 | FAN BELTDIMESNIONAL DETAILS OC LENGHT | FAN BELTDIMESNIONAL DETAILS OC LENGHT | 1 | nos | con34.mod.udhampur | 10 | |
| 6 | CAP ASSY NOISE SUPPRESSOR | CAP ASSY NOISE SUPPRESSOR | 1 | nos | con34.mod.udhampur | 10 | |
| 7 | BULB HEAD LIGHT HIS 12 | BULB HEAD LIGHT HIS 12 | 1 | nos | con34.mod.udhampur | 10 | |
| 8 | STUD BOLT | STUD BOLT | 5 | nos | con34.mod.udhampur | 10 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Cancelled cheque copy
EFT mandate certified by bank
Audited financial statements or CA/CMA certificate showing turnover
Vendor code creation documents
Technical bid documents and any OEM authorizations
Proof of non-liquidation/non-bankruptcy status (undertaking)
Key insights about PUNJAB tender market
Bidders must submit PAN, GST, cancelled cheque, and EFT mandate with the bid, plus audited turnover for the last three financial years. Ensure Detailed Design Drawings are prepared within 15 days of award and align with approved drawings to avoid delivery delays.
Required documents include PAN, GST certificate, canceled cheque, EFT mandate, turnover certificates from CA/CMA, financial statements, OEM authorizations if applicable, and technical bid including drawings as per buyer terms.
Delivery time can extend up to the calculated period: (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days; extensions may apply during currency of the contract.
A comprehensive warranty of 2 years from the date of final acceptance applies to all supplied goods under this procurement.
The BOQ lists eight items, including BEARING TAPERED ROLLER, AIR PRESSURE PIPE ASY, MASTER CYLINER REPAIR KIT, RATCHET KICK STARTER, FAN BELT DIMENSIONAL DETAILS OC LENGTH, CAP ASY NOISE SUPPRESSOR, BULB HEAD LIGHT HIS 12, and STUD BOLT.
Submit Detailed Design Drawings within 15 days of award; the buyer will approve or issue modification lists within 15 days; delays trigger delivery schedule adjustments without LD.
Provide certified audited balance sheets or Chartered Accountant certificate indicating average turnover for the last three financial years; if the bidder is newly established, turnover is calculated from subsequent completed years.
Yes; the purchaser reserves the right to increase or decrease quantity up to 25% of bid quantity at contract placement and during the contract currency at contracted rates.
Indian Army
📍 EAST SIKKIM, SIKKIM
Indian Army
📍 MATHURA, UTTAR PRADESH
Indian Army
📍 JALPAIGURI, WEST BENGAL
Indian Army
📍 TINSUKIA, ASSAM
Indian Army
📍 AMBALA, HARYANA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS