TenderDekho Logo
Closed GEM

Open Tender for Taking down existing point wiring,One light point controlled by one switch,One wall fan exhaust fan in JAMMU, JAMMU & KASHMIR

Bid Publish Date

20-Aug-2026, 10:12 am

Bid End Date

31-Aug-2026, 11:00 am

Location

Progress

Issue20-Aug-2026, 10:12 am
Corrigendum20-Aug-2026
AwardPending

Indian Army invites bids for Taking down existing point wiring, One light point controlled by one switch, One wall fan exhaust fan ceiling fan, One 3 pin socket outlet point, One 3 pin socket outlet point 5 amps, One 3 pin socket outlet point 15 amps on independent, Taking down existing tube light bulb, Supply and fixing for energy saving environmental, Supply and fixing LED light fitting mirror type, Supply and fixing LED luminaire 600 mm, Material and Labour Lamp holder PVC P, Supply and fixing Modular switch, Supply and fixing Modular switch 1 way, Supply and fixing Modular Socket 6A, Supply and fixing Modular Socket, Supply and fixing modular fan, Supply and fixing modular white cover plate with, Supply and fixing modular white cover plate, Supply and fixing modular white cover, Supply and fixing modular, Material and Labour Ceiling rose 3 phase PVC, Material and Labour Boxes junctions plastic, Material and Labour for sub main, Material and Labour for sub main wiring with two single, Supply and fixing sheet metal enclosures, Material and Labour for shifting of split type AC, Taking down existing exhaust fan, Taking down existing DBs box MCCB, Supply and fixing MCB Double door, Supply and fixing sheet metal encloser, SP 6 To 32 AMP, SPN 40 to 63 AMP, Supply laying commissioning UG cable XLPE, Excavation in trenches not exceeding, Returning filling in including spreading levelling, Removing excavated material not exceeding, Material and labour for sand cushioning, Material and Labour for unreinforced precast in JAMMU, JAMMU & KASHMIR. Quantity: 2058. Submission Deadline: 31-08-2026 11: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

2058

Category

Taking down existing point wiring

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

Past Performance

50 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Taking down existing point wiring , One light point controlled by one switch , One wall fan exhaust fan ceiling fan , One 3 pin socket outlet point , One 3 pin socket outlet point 5 amps , One 3 pin socket outlet point 15 amps on independent , Taking down existing tube light bulb , Supply and fixing for energy saving environmental , Supply and fixing LED light fitting mirror type , Supply and fixing LED luminaire 600 mm , Material and Labour Lamp holder PVC P , Supply and fixing Modular switch , Supply and fixing Modular switch 1 way , Supply and fixing Modular Socket 6A , Supply and fixing Modular Socket , Supply and fixing modular fan , Supply and fixing modular white cover plate with , Supply and fixing modular white cover plate , Supply and fixing modular white cover , Supply and fixing modular , Material and Labour Ceiling rose 3 phase PVC , Material and Labour Boxes junctions plastic , Material and Labour for sub main , Material and Labour for sub main wiring with two single , Supply and fixing sheet metal enclosures , Material and Labour for shifting of split type AC , Taking down existing exhaust fan , Taking down existing DBs box MCCB , Supply and fixing MCB Double door , Supply and fixing sheet metal encloser , SP 6 To 32 AMP , SPN 40 to 63 AMP , Supply laying commissioning UG cable XLPE , Excavation in trenches not exceeding , Returning filling in including spreading levelling , Removing excavated material not exceeding , Material and labour for sand cushioning , Material and Labour for unreinforced precast

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

2

Pre-Bid & Qualification

Pre-Bid Date

20-08-2026 10:00:00

Pre-Bid Venue

GARRISON ENGINEER (AIR FORCE) JAMMU, J&K-180003, CONT NO 9697030227

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Jammu

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JammuJammu--7745-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9767247.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

Taking down existing point wiring

Taking down existing point wiring of light point exhaust fan ceiling fan switch socket any size with due care and refixing cleaning painting if required including connecting item all complete as specified and directed

77 per point Delivery: 45 days
#2

One light point controlled by one switch

One light point controlled by one switch.

26 per point Delivery: 45 days
#3

One wall fan exhaust fan ceiling fan

One wall fan exhaust fan ceiling fan point controlled by one switch.

8 per point Delivery: 45 days
#4

One 3 pin socket outlet point

One 3 pin socket outlet point 5 amps on independent with cables 1.5 sqmm size .

10 per point Delivery: 45 days
#5

One 3 pin socket outlet point 5 amps

One 3 pin socket outlet point 5 amps on the same board with other switches.

3 per point Delivery: 45 days
#6

One 3 pin socket outlet point 15 amps on independent

One 3 pin socket outlet point 15 amps on independent with cables 4 sqmm size .

30 per point Delivery: 45 days
#7

Taking down existing tube light bulb

Taking down existing tube light bulb with due care and refixing cleaning painting if required including connecting item all complete as specified and directed by Eng in Charge.

10 each Delivery: 45 days
#8

Supply and fixing for energy saving environmental

Supply and fixing for energy saving environmental friendly LED tubelight fittings 20 watts 1200 mm Aluminium body long life impact proof surface wall mounting IP 20 95 luminaries per watt extruded aluminium housing with frosted PMPA diffuser high brightness LEDs complete with all accessories pre-wired twin core twisted flexible copper conductor cable with suitable size with ceiling rose complete all as specified and directed.

10 each Delivery: 45 days
#9

Supply and fixing LED light fitting mirror type

Supply and fixing LED light fitting mirror type with high out put diffuser 2 feet 10 watt 220 V AC decorative type with driver holder and LED lamp including connecting up with three core flexible copper conductor cable of suitable size complete

2 each Delivery: 45 days
#10

Supply and fixing LED luminaire 600 mm

Supply and fixing LED luminaire 600 mm x 600 mm 35 by 36 watt 220 V AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver holders and LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cases of suitable size complete.

12 each Delivery: 45 days
#11

Material and Labour Lamp holder PVC P

Material and Labour Lamp holder PVC Polycarbonate type with back plate suitable for batten fittings

2 each Delivery: 45 days
#12

Supply and fixing Modular switch

Supply and fixing Modular switch 1 way 6A 1 module

34 each Delivery: 45 days
#13

Supply and fixing Modular switch 1 way

Supply and fixing Modular switch 1 way 16A 1 module

30 each Delivery: 45 days
#14

Supply and fixing Modular Socket 6A

Supply and fixing Modular Socket 6A 2 by 3 pin combined 2 module Independent socket specified and directed by Eng in Charge.

13 each Delivery: 45 days
#15

Supply and fixing Modular Socket

Supply and fixing Modular Socket 6A by 16A 2 by 3 pin combined 2 module

30 each Delivery: 45 days
#16

Supply and fixing modular fan

Supply and fixing modular fan regulator Fan step regulator 120W 2module

8 each Delivery: 45 days
#17

Supply and fixing modular white cover plate with

Supply and fixing modular white cover plate with frame White cover plate with frame 3 module

40 each Delivery: 45 days
#18

Supply and fixing modular white cover plate

Supply and fixing modular white cover plate with frame White cover plate with frame 6 module

5 each Delivery: 45 days
#19

Supply and fixing modular white cover

Supply and fixing modular white cover plate with frame White cover plate with frame 8 module

3 each Delivery: 45 days
#20

Supply and fixing modular

Supply and fixing modular white cover plate with frame White cover plate with frame 12 module

2 each Delivery: 45 days
#21

Material and Labour Ceiling rose 3 phase PVC

Material and Labour Ceiling rose 3 phase PVC polycarbonate isolated body

12 each Delivery: 45 days
#22

Material and Labour Boxes junctions plastic

Material and Labour Boxes junctions plastic round four terminals

20 each Delivery: 45 days
#23

Material and Labour for sub main

Material and Labour for sub main wiring with two single core FRLS PVC insulated stranded unsheathed cable copper conductor with size 10 Sqmm and drawing through and including Non metallic PVC conduit concealed in wall including earth continuity conductor of size 10 Sqmm PVC insulated unsheathed stranded copper conductor cable and connected to earth dolly to be drawn in ccocealed PVC conduit including connecting to main board complete all as specified and directed by Engineer in Charge.

230 rm Delivery: 45 days
#24

Material and Labour for sub main wiring with two single

Material and Labour for sub main wiring with two single core FRLS PVC insulated stranded unsheathed cable copper conductor with size 06 Sqmm and drawing through and including Non metallic PVC conduit concealed in wall including earth continuity conductor of size 06 Sqmm PVC insulated unsheathed stranded copper conductor cable and connected to earth dolly to be drawn in ccocealed PVC conduit including connecting to main board complete all as specified and directed by Engineer in Charge.

120 rm Delivery: 45 days
#25

Supply and fixing sheet metal enclosures

Supply and fixing sheet metal enclosures with socket plug top and 20 Amp MCB 240 Volts double pole and neutral enclosures with two pin and earth plug and socket complete double door type complete all as specified and directed by Engineer in Charge.

4 each Delivery: 45 days
#26

Material and Labour for shifting of split type AC

Material and Labour for shifting of split type AC window type AC capacity upto 2 ton from old position and refixing to new position including drilling cutting chasing and making good on existing surface of PCC concreting white cement plastering and all necessary items including transporting of ACs from one location to other location in PCDA (NC) Jammu and handing over the machine equipment in serviceable condition to the user including fixing to new location and supply and fixing drain pipe where not present all as specified and directed by Engineer in Charge.

2 each Delivery: 45 days
#27

Taking down existing exhaust fan

Taking down existing exhaust fan ceiling fan any size with due care and refixing with new lock bolt where required and new fan rod upto 03 ft so that fan mob can hang beyond false ceiling after servicing and cleaning painting if required including connecting electrically using PVC insulated overall sheathed flexible copper conductor cable 0.75 mm all as required and directed.

8 each Delivery: 45 days
#28

Taking down existing DBs box MCCB

Taking down existing DBs box MCCB MCB TPN SPN SP any size with due care and refixing cleaning painting if required including connecting item all complete as specified and directed by Eng in Charge.

20 each Delivery: 45 days
#29

Supply and fixing MCB Double door

Supply and fixing MCB Double door distribution board single pole and neutral 240 volt 12 way with 200 Amps bus bar complete all as specified and directed.

2 each Delivery: 45 days
#30

Supply and fixing sheet metal encloser

Supply and fixing sheet metal encloser distribution board VTPN Double door 415 Volt 8 way with main incomming MCCB and outgoing MCB DBs box all complete as specified and directed by Eng in Charge.

1 each Delivery: 45 days
#31

SP 6 To 32 AMP

SP 6 To 32 AMP

15 each Delivery: 45 days
#32

SPN 40 to 63 AMP

SPN 40 to 63 AMP

2 each Delivery: 45 days
#33

Supply laying commissioning UG cable XLPE

Supply laying commissioning UG cable XLPE Insulated screened PVC bedded galvanized steel strip or wire armoured electric power cables Heavy duty 1100 Volts grade with stranded aluminium conductor of size 70 sqmm 3.5 core cable complete all as specified and directed by Engr in Charge.

175 rm Delivery: 45 days
#34

Excavation in trenches not exceeding

Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in any type of soil for laying of LT UG cables complete all as specified and directed by Eng in Charge.

40 cum Delivery: 45 days
#35

Returning filling in including spreading levelling

Returning filling in including spreading levelling watering and well ramming in layers not exceeding 25 cm thick in hard dense soil complete all as specified and directed by Eng in Charge.

21 cum Delivery: 45 days
#36

Removing excavated material not exceeding

Removing excavated material not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed by Eng in Charge.

19 cum Delivery: 45 days
#37

Material and labour for sand cushioning

Material and labour for sand cushioning below and around cable in trenches with rever sand all as specified .

12 cum Delivery: 45 days
#38

Material and Labour for unreinforced precast

Material and Labour for unreinforced precast concrete cable cover class LV type 1 flat of size 250 x 150 x 40 mm for cable protection complete all as specified and as directed by EIC

1,000 each Delivery: 45 days

Categories 115

AWM CABLE APPARELS EARTHING BRAID PLATFORM SCALE UG CABLE APFC PANEL BUILDING CONSTRUCTION PAINTING DISTRIBUTION BOARD INTERIOR BULB CABBING EQUIPMENTS COMPRESSOR PTFE WIRE AIR CYLINDERS ARNO STARTING CONTACTOR AIR COOLED ENGINE ELECTRICAL PRODUCTS PLATE SUPPLY DISTRIBUTION?BOX LED STREET LIGHT AMPS STEEL FURNITURE THEODOLITES LED LIGHT PANEL STRIP DISCRETE COMPONENTS ELECTRICAL WIRE PRE FABRICATED STEEL CABLE DUCT CIRCUIT PROTECTION DEVICE TELECOM EQUIPMENT FALSE CELING PUMP SPARE PARTS SOIL EARTH SNG CLOTHING EQUIPMENT MCCB ELECTRICAL SUBSTATION ELECTRICAL?CONDUIT MINING ENGINEERING COPPER SHEET RECREATIONAL EQUIPMENT STOMACHERS CONDUCTOR LIGHT AND BULBS SOCKET POWER MOULDED ITEM CB BOX ELECTRICAL REGULATOR WINDOW AIR EXHAUSTER HIGH TENSION PANEL LED LUMINARIES COILED CABLE SWITCH GEAR TUBE LIGHT CEMENT FITMENT LFH CABLE EARTH AND STONE HOOK UP WIRES ELECTRONIC PRODUCTS AND APPLIANCES AWM WIRE LED LIGHT PNEUMATIC POWER WIRE TUBE LEAD WIRE INDUSTRIAL STRUCTURE SCBA BACK PLATE BOX WATER LEVEL RECORDER WATER SUPPLY MATERIAL WIRE CENTRIFUGAL COMPRESSORS FUME HOODS DISTRIBUTION PANEL ELECTRONIC COMPONENTS AND SUPPLIES ENT SET FILLING RAIN CUT FLUORESCENT LAMP MODULAR SWITCH FIBERS THREADS AND YARNS GAS BURNERS DUCTING BACKHOE TRANSITION METALS ANGLE BRACKETS CABLE FIRE BREATHING APPARATUS MACHINE PLASTIC ELECTRICAL CABLE VALVE PARTS AND ACCESSORIES EXCAVATION AUTOMOTIVE CABLE STRUCTURE BUNDI INSULATED CABLE LOW TENSION PANEL ARM CHAIR UPVC PIPE CABLE SUPPLY FAN METAL PRODUCTS BAR EARTH MOVING CONSTRUCTION MINERAL LABOUR SWITCH SUPPLY

Corrigendum Updates

1 Update
#1

Update

20-Aug-2026

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer