TenderDekho Logo
Active GEM

Bhilai Steel Plant FO and UTP Cabling Service Tender Durg Chhattisgarh 2026

Bid Publish Date

13-Jul-2026, 8:40 am

Bid End Date

23-Jul-2026, 9:00 am

Value

₹94,77,506

Progress

Issue13-Jul-2026, 8:40 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Similar Category

Annual Maintenance Contract for Networking Devices (Version 2)

Bid Type

Two Packet Bid

Key Highlights

  • FO and UTP cabling work scope within Bhilai Steel Plant (Durg, Chhattisgarh) for 2026 procurement
  • Organization-specific ATC terms uploaded; strict compliance required
  • Estimated value ₹9,477,505.92; no defined BOQ items as of data release
  • Industrial facility environment implies rigorous safety and installation standards
  • Potential requirement for OEM authorizations and technical compliance with plant IT cabling norms
  • Delivery and warranty terms to be detailed in ATC; penalties or LDs may apply
  • GST registration, PAN, and relevant experience certificates are likely mandatory
  • On-site feasibility and commissioning I/O testing to align with plant infrastructure

Categories 3

Tender Overview

Organization: Bhilai Steel Plant, a unit of Steel Authority of India Limited, invites bids for FO and UTP cabling work in Durg, Chhattisgarh (490001) with an estimated value of ₹9,477,505.92. There are no BOQ items currently listed, and the procurement is categorized as a Custom Bid for Services. The specific ATC terms have been uploaded by the buyer. This tender targets qualified service providers capable of executing structured cable runs, terminations, and IT-ready cabling within a steel plant environment. The unique aspect is the reliance on organization-specific ATC documents, signaling stringent compliance. The opportunity is location-bound to the Bhilai area and emphasizes on-site execution under controlled conditions.

Technical Specifications & Requirements

  • Category: Custom Bid for Services – FO and UTP cabling work
  • Scope: FO (fiber optic) and UTP cabling service delivery (installation, testing, termination, and documentation) per buyer ATC terms
  • Location: Durg, Chhattisgarh with plant-standard installation practices
  • Estimated Value: ₹9,477,505.92; no BOQ items listed at present
  • Documentation: Buyer has uploaded ATC; bidders must review and comply with organization-provided terms for installation, safety, and quality
  • Compliance: Expect adherence to plant safety, electrical and IT cabling best practices; no explicit standards cited in public data, but ATC will define required norms
  • Experience: Providers should demonstrate capability in FO/UTP cabling within industrial environments and alignment with buyer ATC expectations
  • Delivery: On-site delivery and commissioning per ATC timelines after contract award
  • Warranty/Support: Not explicitly stated in the data; ATC may specify post-installation support

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the data; bidders must verify in ATC terms
  • Experience: Demonstrated capability in FO and UTP cabling for industrial plants; ensure compliance with ATC
  • Delivery: On-site installation and testing as per ATC; timelines to be defined in the contract
  • Payment: Terms to be defined in ATC and contract documents
  • Documents: Submit GST, PAN, electrical/IT cabling experience certificates, financial statements, and OEM authorizations if required by ATC
  • Warranty/Penalties: Penalty mechanics and warranty terms will be specified in the ATC; bidders should anticipate integration with plant safety standards
  • Validity: Bid validity to be confirmed in ATC and tender documents

Key Specifications

  • FO and UTP cabling installation and testing within industrial plant environment

  • Estimated contract value around ₹9.48 Cr with no BOQ items released

  • Review ATC terms uploaded by buyer for exact compliance requirements

  • Experience in executing fiber optic and copper cabling in dense facility settings

  • Adherence to plant safety protocols during installation and commissioning

Terms & Conditions

  • ATC documents dictate exact eligibility, documentation, and technical standards

  • EMD amount and payment terms to be confirmed in ATC; ensure bid validity

  • Delivery and warranty details will be specified in the main contract

Important Clauses

Payment Terms

Terms to be defined in ATC; bidders should prepare for milestone-based or on-completion payments per contract.

Delivery Schedule

On-site installation and testing; schedule to be finalized in ATC following award.

Penalties/Liquidated Damages

LDs and performance penalties to be described in ATC; prepare for plant-specific penalty framework.

Bidder Eligibility

  • Experience in FO and UTP cabling for industrial facilities

  • Capability to operate within Bhilai Steel Plant environment following ATC

  • Compliance with GST and financial prerequisites as per ATC

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Custom Bid for Services - FO and UTP cabling work

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Durg

Delivery Pincodes

490001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Subhash Rathore490001,Bhilai Steel PlantDurgChhattisgarh490001Project / Lumpsum Based--

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9594424.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for FO and UTP cabling projects in industrial settings

4

Financial statements (minimum 2-3 years)

5

EMD/Security deposit as per ATC terms (amount to be specified in ATC)

6

Technical bid documents demonstrating cabling capabilities

7

OEM authorizations or vendor approvals (if required by ATC)

8

Safety certifications and relevant regulatory compliance documents

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid on FO and UTP cabling tender in Bhilai Steel Plant 2026

To bid on this Bhilai Steel Plant cabling tender, review the ATC uploaded by the buyer, prepare documentation including GST, PAN, and experience certificates, and ensure FO/UTP installation capabilities in an industrial setting. The contract value is around ₹9.48 Cr; ensure bid validity and compliance with safety norms.

What documents are required for cabling services tender in Durg

Required documents include GST certificate, PAN card, 2-3 years of financial statements, FO/UTP cabling experience certificates, technical bid, and OEM authorizations if applicable. EMD details will be specified in ATC; ensure submission with the bid.

What are the technical specifications for FO/UTP cabling Bhilai

Technical scope covers fiber optic and copper cabling installation, testing, and commissioning per ATC. Exact standards will be defined in the ATC; bidders should demonstrate plant-safe installation practices and ability to operate in constrained industrial spaces.

When is the delivery window for Bhilai cabling project 2026

Delivery schedule will be defined in the contract and ATC after bid award. Bidders should plan for on-site installation and commissioning following safety and IT cabling guidelines within the plant environment.

What are the payment terms for Bhilai Steel cabling contract

Payment terms will be specified in the ATC and final contract. Expect milestone-based or on-completion payments with conditions aligned to installation, testing, and acceptance criteria at Bhilai Steel Plant.

What certifications are required for industrial cabling bids

Required certifications include GST and vendor-specific qualifications; OEM authorizations may be needed per ATC. Safety certifications and compliance documents should also be prepared to meet plant standards.

How to verify EMD requirements for the Bhilai cabling tender

EMD details are provided in the ATC terms. Ensure deposit or online EMD as prescribed, and attach proof with bid submission. Clarify amount and mode in the ATC before tender submission.

What standards apply to FO and UTP cabling at Bhilai Steel Plant

ATC will specify exact standards. Prepare to align with plant installation practices, safety norms, and electrical IT cabling guidelines; confirm any IS/IEC references in the ATC for fiber and copper cabling.