Progress
Quantity
148
Category
Superstructure including foundation electric fitting furniture misc items fire alarm system
Bid Type
Two Packet Bid
A tender has been published for Indian Army Superstructure including foundation electric fitting furniture misc items fire alarm system, Retaining Wall, ILCB approach path, RCC Hume pipe drain, And all other specification as per RFP in SONITPUR, ASSAM. Quantity: 148 by. Submission Deadline: 09-06-2025 19: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Superstructure including foundation electric fitting furniture misc items fire alarm system , Retaining Wall , ILCB approach path , RCC Hume pipe drain , And all other specification as per RFP
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Superstructure including foundation electric fitting furniture misc items fire alarm system
Superstructure including foundation electric fitting furniture misc items fire alarm system
Retaining Wall
Retaining Wall
ILCB approach path
ILCB approach path
RCC Hume pipe drain
RCC Hume pipe drain
And all other specification as per RFP
And all other specification as per RFP
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Superstructure including foundation electric fitting furniture misc items fire alarm system | Superstructure including foundation electric fitting furniture misc items fire alarm system | 1 | nos | [email protected] | 180 | |
| 2 | Retaining Wall | Retaining Wall | 40 | mtr | [email protected] | 180 | |
| 3 | ILCB approach path | ILCB approach path | 86 | mtr | [email protected] | 180 | |
| 4 | RCC Hume pipe drain | RCC Hume pipe drain | 20 | mtr | [email protected] | 180 | |
| 5 | And all other specification as per RFP | And all other specification as per RFP | 1 | as per store list | [email protected] | 180 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 05-06-2025 15:20:38 | |
| 2 | ********** Under PMA | - | 09-06-2025 18:11:41 | |
| 3 | ********** Under PMA | - | 09-06-2025 15:27:13 | |
| 4 | ********** Under PMA | - | 09-06-2025 18:43:13 | |
| 5 | ********** Under PMA | - | 09-06-2025 15:06:06 | |
| 6 | ********** Under PMA | - | 08-06-2025 22:37:21 | |
| 7 | ********** Under PMA | - | 08-06-2025 21:39:24 | |
| 8 | ********** Under PMA | - | 09-06-2025 15:21:21 | |
| 9 | ********** Under PMA | - | 24-05-2025 19:27:12 | |
| 10 | ********** Under PMA | - | 08-06-2025 21:52:30 | |
| 11 | ********** Under PMA | - | 09-06-2025 12:40:58 | |
| 12 | ********** Under PMA | - | 08-06-2025 22:16:50 | |
| 13 | ********** Under PMA | - | 09-06-2025 14:06:59 |
Key insights about ASSAM tender market
The eligibility requirements include being a registered entity within the construction industry, demonstrating adequate previous experience in similar projects, and ensuring adherence to national regulations and standards. All bidders must submit proof of their legal and financial compliance to qualify for consideration.
Bidders must comply with the stringent technical specifications outlined in the Request for Proposal (RFP), which may include material quality, design standards, and construction methodologies. Adherence to quality assurance protocols is crucial for safety and durability of the completed project.
Payment terms will typically be outlined within the tender document. Generally, they may involve an initial advance payment followed by milestone payments linked to project progress and completion achievements. It is essential for bidders to review these terms to ensure alignment with their financial practices.
The selection process involves a thorough evaluation of bids, focusing on technical compliance, financial proposals, and the overall capability of the bidders. Points will be awarded based on thorough documentation, design quality, and the ability to meet deadlines effectively.
MSEs may benefit from reduced submission requirements, assistance in the bidding process, and potential price preferences to increase their competitiveness. This is intended to encourage participation from smaller firms and promote local business development within this government contracting initiative.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS