Iisco Steel Plant
Bid Publish Date
26-Jun-2025, 5:09 pm
Bid End Date
17-Jul-2025, 6:00 pm
Location
Progress
RAQuantity
7
Category
TITLE1
Bid Type
Two Packet Bid
Public procurement opportunity for Indian Army TITLE1, TITLE2, TITLE3, TITLE4, TITLE5, TITLE6, TITLE7 in LUCKNOW, UTTAR PRADESH. Quantity: 7 issued by. Submission Deadline: 17-07-2025 18: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
TITLE1 , TITLE2 , TITLE3 , TITLE4 , TITLE5 , TITLE6 , TITLE7
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Iisco Steel Plant
Central Coalfields Limited
Electronics Corporation Of India Limited
Airports Authority Of India ,rhq Nr - Rangpuri
Ajmer, RAJASTHAN
Director General Of Civil Defence
PONDICHERRY, PUDUCHERRY
Tender Results
Loading results...
TITLE1
Disconnecting of HV OR LV cable from transformer 400 KVA 11OR 0POINT433 KV at site and loading and unloading of Transformer at both side S OR S A of AGE I AF Memaura and repair work premises hiring of crane and transportation charges to workshop from AGEI AF Memaura complete all as specified and directedPOINT Make Vishal Transformers switchgears Pvt Ltd SM NoPOINT 1843089TR04 01 Each Job
TITLE2
Taking down and dismantlingopening up unserviceable transformer step down outdoor type 110POINT433 KV Capacity 400 KVA including lifting of core taking out unserviceable burnt winding after dismantling core stampings and draining of transformer oil and storing in a suitable container desludging and cleaning thoroughly rewinding and reinsulating of transformer as per the requirement maintaining existing specificationsize including reassembling core stampings lowering wound core within transformer outer cell and refilling transformer oil after sludge removal of dielectric strength 50 KV at least replacement of silica gel of breather reassembling testing for satisfactory performance and installation and commissioning in the existing position complete all as directedPOINT Note Materials required for winding and insulation shall be measured and paid separately as supply only 01 Each Job
TITLE3
M L for changing of old Burnt copper coil by new DPC copper coils with complete including insulation material of distribution transformer of capacity 400 KVA complete all as specified and directedPOINT 107 Kg
TITLE4
Dismantling of unserviceable LT bushing of transformer of capacity 400 KVA and supply and fix new bushing including brass stud nuts washers and rubber bush complete all as directed by the EngineerinChargePOINT 02 Each Set
TITLE5
Dismantling of unserviceable 11 KV HT bushing of transformer of capacity 400 KVA and supply fix new bushing including brass stud nuts washers and rubber bush complete all as directed by the EngineerinChargePOINT 01 Each Set
TITLE6
Supply and pour New transformer oil in replacement of approved quality Dielectric strength not less than 50 KV ISI marked for filling in transformer for topping up complete all as specified and directedPOINT 370 Ltrs
TITLE7
Schedule of Credit for old US items will be the property of contractor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TITLE1 | Disconnecting of HV OR LV cable from transformer 400 KVA 11OR 0POINT433 KV at site and loading and unloading of Transformer at both side S OR S A of AGE I AF Memaura and repair work premises hiring of crane and transportation charges to workshop from AGEI AF Memaura complete all as specified and directedPOINT Make Vishal Transformers switchgears Pvt Ltd SM NoPOINT 1843089TR04 01 Each Job | 1 | job | ageafmem@232 | 15 | |
| 2 | TITLE2 | Taking down and dismantlingopening up unserviceable transformer step down outdoor type 110POINT433 KV Capacity 400 KVA including lifting of core taking out unserviceable burnt winding after dismantling core stampings and draining of transformer oil and storing in a suitable container desludging and cleaning thoroughly rewinding and reinsulating of transformer as per the requirement maintaining existing specificationsize including reassembling core stampings lowering wound core within transformer outer cell and refilling transformer oil after sludge removal of dielectric strength 50 KV at least replacement of silica gel of breather reassembling testing for satisfactory performance and installation and commissioning in the existing position complete all as directedPOINT Note Materials required for winding and insulation shall be measured and paid separately as supply only 01 Each Job | 1 | job | ageafmem@232 | 15 | |
| 3 | TITLE3 | M L for changing of old Burnt copper coil by new DPC copper coils with complete including insulation material of distribution transformer of capacity 400 KVA complete all as specified and directedPOINT 107 Kg | 1 | job | ageafmem@232 | 15 | |
| 4 | TITLE4 | Dismantling of unserviceable LT bushing of transformer of capacity 400 KVA and supply and fix new bushing including brass stud nuts washers and rubber bush complete all as directed by the EngineerinChargePOINT 02 Each Set | 1 | job | ageafmem@232 | 15 | |
| 5 | TITLE5 | Dismantling of unserviceable 11 KV HT bushing of transformer of capacity 400 KVA and supply fix new bushing including brass stud nuts washers and rubber bush complete all as directed by the EngineerinChargePOINT 01 Each Set | 1 | job | ageafmem@232 | 15 | |
| 6 | TITLE6 | Supply and pour New transformer oil in replacement of approved quality Dielectric strength not less than 50 KV ISI marked for filling in transformer for topping up complete all as specified and directedPOINT 370 Ltrs | 1 | job | ageafmem@232 | 15 | |
| 7 | TITLE7 | Schedule of Credit for old US items will be the property of contractor | 1 | job | ageafmem@232 | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
05-Aug-2025, 12:00 pm
End
06-Aug-2025, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Brainwave Expert Services Under PMA | - | 17-07-2025 17:30:09 | |
| 2 | ESS KAY ELECTRICALS Under PMA | - | 17-07-2025 17:43:01 | |
| 3 | Industrial Traders Under PMA | - | 17-07-2025 17:06:44 | |
| 4 | UDAY PRATAP SINGH Under PMA | - | 17-07-2025 17:08:34 | |
| 5 | VAMIKA CORPORATE SERVICES Under PMA | - | 17-07-2025 17:56:46 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | Industrial Traders Under PMA Winner | ₹2,15,501 | Item Categories : TITLE1,TITLE2,TITLE3,TITLE4,TITLE5,TITLE6,TITLE7 |
| L2 | ESS KAY ELECTRICALS Under PMA | ₹2,25,700 | Item Categories : TITLE1,TITLE2,TITLE3,TITLE4,TITLE5,TITLE6,TITLE7 |
| L3 | UDAY PRATAP SINGH Under PMA | ₹2,45,511 | Item Categories : TITLE1,TITLE2,TITLE3,TITLE4,TITLE5,TITLE6,TITLE7 |
🎉 L1 Winner
Industrial Traders Under PMA
Final Price: ₹2,15,501
Key insights about UTTAR PRADESH tender market
The eligibility requirements include being a registered entity, demonstrating relevant experience in electrical repairs, and possessing the technical capacity to manage the project. Bidders must also comply with any local regulations and submit the necessary documentation to prove their capability.
Bidders must provide documentation demonstrating the required certificates related to electrical engineering qualifications for technical staff, as well as any necessary operational licenses. Compliance with safety and quality standards relevant to transformer repairs is crucial.
The registration process involves creating an account on the designated portal where the tender is hosted. Bidders will need to upload their documentation, including company registration and past project references, to ensure successful registration.
All accepted document formats for submission are typically specified in the tender guidelines, but generally, documents should be submitted in PDF or Word formats. Bidders are advised to check the electronic submission standards on the tender website.
An Earnest Money Deposit (EMD) may be required to ensure that bidders are serious about their offers. Additionally, a performance security may be mandated to guarantee the project's completion as per the specifications. Payment terms will typically align with the project milestones, and bidders should prepare their financial proposals accordingly.
Mvvnl
📍 KHERI, UTTAR PRADESH
Uranium Corporation Of India Limited
📍 CUDDAPAH, ANDHRA PRADESH
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 BARAMULLA, JAMMU & KASHMIR
Western Railway
📍 RATLAM, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS