TenderDekho Logo
Closed GEM

South Eastern Coalfields Limited SECL Procurement Main Gear & Shaft Components Tender KORIYA CHHATTISGARH 2026

Bid Publish Date

18-Sep-2026, 6:45 pm

Bid End Date

10-Oct-2026, 7:00 pm

EMD

₹780

Value

₹52,51,772

Generate Docs

Progress

Issue18-Sep-2026, 6:45 pm
Corrigendum03-Oct-2026
AwardPending

Key Highlights

  • • Exact EMD amount ₹780 and online payment method via RTGS/IBBN to SECL Baikunthpur
  • • Scope: supply of 31 categories/items of mechanical components for gear and shaft assemblies
  • • Quantity variation right up to 25% during contract and currency extensions with minimum 30 days
  • • GST handling: bidder bears applicable GST; reimbursement rules as per actuals or quoted rate

Tender Overview

South Eastern Coalfields Limited (Coal India Limited) invites offers for the supply of mechanical components and spares including main shaft, gears, pinions, gears, seals, brake parts, and related items listed under the 98 37EH / 99 55EH / 98 TUG categories for delivery in KORIYA, CHHATTISGARH. The project’s estimated value is ₹5,251,772, with an EMD of ₹780. The scope is strictly supply-only, with up to a 25% quantity variation allowed at contracted rates. Bidder must align with buyer terms on delivery periods and online EMD submission through RTGS/IMPS to SECL Baikunthpur Area. Unique assortment of parts indicates a multi-item gear train refurbishment or replacement program.

Technical Specifications & Requirements

  • Product categories include: Main Shaft, Main Gear, Gun Metal Bush, O Ring, Output Shaft, Output Spur Pinion, Output Helical Gear, Second Motion Pinion & Helical Gear, Input Pinion Shaft, Segment Sets, Motor Coupling, Brake Shoe & Lining, Oil Seal Sets, Planetary components, and Band Brake assemblies.
  • No explicit technical specifications or dimensional data published in tender text; emphasis on scope of supply being confined to GOODS only.
  • Estimated value: ₹5,251,772; EMD: ₹780; online EMD/PBG options available; provider must upload relevant certificates and OEM authorizations if applicable.
  • Delivery framework follows option clause allowing up to 25% quantity increase/decrease; delivery calculation references original/extended delivery periods with a minimum of 30 days.
  • GST treatment: bidder to determine applicability; tender permissive on GST reimbursement as per actual rates or quoted rate.
  • Manufacturer Authorization: required when using authorized distributors; include OEM authorization details with bid.
  • Payment terms: post-award, invoice in consignee name with GSTIN; performance security via PBG or DD (DD payable to SECL, Baikunthpur).

Terms & Eligibility

  • EMD: ₹780; payment can be online via RTGS/IBAN to SECL Baikunthpur, with proof of transfer uploaded.
  • Supply scope only; no service component; delivery terms per contract with option clause.
  • GST considerations handled by bidder; supplier bears GST applicability and compliance; GST reimbursement as per actuals or quoted rate.
  • Manufacturer Authorization required for OEM/distributor submissions; include with bid.
  • Payment terms: invoice issuance in consignee GSTIN; penalties or LD not specified here.
  • Delivery schedule to be confirmed; bidder must comply with all bid document certificates and terms.

Key Specifications

  • Product/service names: Main Shaft, Main Gear, Gun Metal Bush set, O Ring set, Output Shaft, Output Spur Pinion, Output Helical Gear, Second Motion Pinion & Helical Gear, Input First Motion Pinion Shaft, Segment sets, Motor Coupling, Brake Shoe & Lining, Oil Seal Set, Planetary components, Band Brake/Lining

  • Quantities: 31 items total in 1 procurement package; exact itemwise quantities not disclosed

  • EMD/Estimated value: ₹780 EMD; ₹5,251,772 estimated value

  • Experience/eligibility: OEM/authorized distributor requirements; supply-only capability; compliance with GeM terms

  • Quality/standards: Not specified explicitly; bidders must attach certificates per bid document

Terms & Conditions

  • 25% quantity adjustment right during and after award with calculated delivery time

  • Supply-only scope; delivery terms governed by order and option clause

  • Online EMD submission to SECL Baikunthpur; PBG and/or DD acceptable as security

  • GST treatment borne by bidder; reimbursement per actuals or quoted rates

  • OEM authorization required for non-OEM bids; reference to ATC and Corrigendum

Important Clauses

Payment Terms

EMD ₹780; online RTGS/IBBN to SECL Baikunthpur; invoice in consignee GSTIN; DD/PBG optional per GeM GTC

Delivery Schedule

Delivery commencement from last date of original delivery order; option clause may extend timing with minimum 30 days; extended time calculated by (increased quantity/original quantity) × original delivery period

Penalties/Liquidated Damages

Not explicitly specified; LD terms to be inferred from GeM GTC and supplier terms; ensure compliance with delivery deadlines

Bidder Eligibility

  • Must provide GST registration and PAN

  • Must demonstrate capability to supply mechanical gear and shaft components

  • Must furnish OEM authorization if bidding via authorized distributors

Advertisement

Authority & Contact

Office Name

Secl Bilaspur Chhattisgarh

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

56

Category

Main Shaft M 98 37EH 040 01

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Main Shaft M 98 37EH 040 01 , Main Gear M 98 37EH 040 03 , Gun Metal Bush pair 01 set in 02 halves M 98 37EH 040 05 , O Ring M 98 37EH 040 06 , Output Shaft of Gear Box M 98 37EH 040 09 , Output Spur Pinion M 98 37EH 040 10 , Output Helical Gear M 98 37EH 040 11 , Second Motion Pinion cum shaft M 98 37EH 040 12 , Second Motion Helical Gear M 98 37EH 040 13 , Input First Motion pinion shaft M 98 37EH 040 14 , Segments 01 Set of 06 Nos M 98 37EH 040 15 , Motor Coupling M 98 37EH 040 16 , Brake Shoe 02 Nos in 1 Set M 98 37EH 040 17 , Brake Lining 02 Pieces in 1 Set M 98 37EH 040 18 , Oil Seal Set M 98 37EH 040 19 , Segment 01 Set of 06 Nos RSS 99 55EH 06 , Input Pinion shaft RSS 99 55EH 27 , End Bearing Bracket with Plate M 98 TUG 045 01 , Foot Stand Stool M 98 TUG 045 02 , Internal Gear T 63 M 98 TUG 045 05 , Clutch Drum M 98 TUG 045 06 , Planetary Pins 3 Nos Set M 98 TUG 045 08 , Sun Gear T 21 M 98 TUG 045 09 , Planetary Gears 3 Nos Set M 98 TUG 045 10 , Planetary Cage Assly M 98 TUG 045 11 , Gun Metal Bush Pair 1 Set in 2 Havels M 98 TUG 045 13 , Main Shaft M 98 TUG 045 14 , Main Gear T80 M 98 TUG 045 15 , Input Pinion Shaft T 14 M 98 TUG 045 16 , Band Brake with lining 2 Nos in 1set M 98 TUG 045 19 , Oil Seal set 4 nos M 98 TUG 045 20

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Korea

Delivery Pincodes

497339

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anand Rajabhau Lakhadive497339,Depot officer, Regional store, Baikunthpur Area, churcha, PO churcha colliery, Dist Koriya, State. Chattisgarh, pin. 497339.KoreaChhattisgarh497339160-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9914575.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 31 Items Sign in for GEM prices

#1

Main Shaft M 98 37EH 040 01

Main Shaft M 98 37EH 040 01

1 nos Delivery: 60 days
#2

Main Gear M 98 37EH 040 03

Main Gear M 98 37EH 040 03

1 nos Delivery: 60 days
#3

Gun Metal Bush pair 01 set in 02 halves M 98 37EH 040 05

Gun Metal Bush pair 01 set in 02 halves M 98 37EH 040 05

4 set Delivery: 60 days
#4

O Ring M 98 37EH 040 06

O Ring M 98 37EH 040 06

2 nos Delivery: 60 days
#5

Output Shaft of Gear Box M 98 37EH 040 09

Output Shaft of Gear Box M 98 37EH 040 09

1 nos Delivery: 60 days
#6

Output Spur Pinion M 98 37EH 040 10

Output Spur Pinion M 98 37EH 040 10

1 nos Delivery: 60 days
#7

Output Helical Gear M 98 37EH 040 11

Output Helical Gear M 98 37EH 040 11

1 nos Delivery: 60 days
#8

Second Motion Pinion cum shaft M 98 37EH 040 12

Second Motion Pinion cum shaft M 98 37EH 040 12

1 nos Delivery: 60 days
#9

Second Motion Helical Gear M 98 37EH 040 13

Second Motion Helical Gear M 98 37EH 040 13

1 nos Delivery: 60 days
#10

Input First Motion pinion shaft M 98 37EH 040 14

Input First Motion pinion shaft M 98 37EH 040 14

2 nos Delivery: 60 days
#11

Segments 01 Set of 06 Nos M 98 37EH 040 15

Segments 01 Set of 06 Nos M 98 37EH 040 15

3 set Delivery: 60 days
#12

Motor Coupling M 98 37EH 040 16

Motor Coupling M 98 37EH 040 16

1 nos Delivery: 60 days
#13

Brake Shoe 02 Nos in 1 Set M 98 37EH 040 17

Brake Shoe 02 Nos in 1 Set M 98 37EH 040 17

3 set Delivery: 60 days
#14

Brake Lining 02 Pieces in 1 Set M 98 37EH 040 18

Brake Lining 02 Pieces in 1 Set M 98 37EH 040 18

4 set Delivery: 60 days
#15

Oil Seal Set M 98 37EH 040 19

Oil Seal Set M 98 37EH 040 19

4 nos Delivery: 60 days
#16

Segment 01 Set of 06 Nos RSS 99 55EH 06

Segment 01 Set of 06 Nos RSS 99 55EH 06

1 set Delivery: 60 days
#17

Input Pinion shaft RSS 99 55EH 27

Input Pinion shaft RSS 99 55EH 27

1 nos Delivery: 60 days
#18

End Bearing Bracket with Plate M 98 TUG 045 01

End Bearing Bracket with Plate M 98 TUG 045 01

1 nos Delivery: 60 days
#19

Foot Stand Stool M 98 TUG 045 02

Foot Stand Stool M 98 TUG 045 02

1 nos Delivery: 60 days
#20

Internal Gear T 63 M 98 TUG 045 05

Internal Gear T 63 M 98 TUG 045 05

1 nos Delivery: 60 days
#21

Clutch Drum M 98 TUG 045 06

Clutch Drum M 98 TUG 045 06

1 nos Delivery: 60 days
#22

Planetary Pins 3 Nos Set M 98 TUG 045 08

Planetary Pins 3 Nos Set M 98 TUG 045 08

2 set Delivery: 60 days
#23

Sun Gear T 21 M 98 TUG 045 09

Sun Gear T 21 M 98 TUG 045 09

2 nos Delivery: 60 days
#24

Planetary Gears 3 Nos Set M 98 TUG 045 10

Planetary Gears 3 Nos Set M 98 TUG 045 10

2 set Delivery: 60 days
#25

Planetary Cage Assly M 98 TUG 045 11

Planetary Cage Assly M 98 TUG 045 11

1 nos Delivery: 60 days
#26

Gun Metal Bush Pair 1 Set in 2 Havels M 98 TUG 045 13

Gun Metal Bush Pair 1 Set in 2 Havels M 98 TUG 045 13

2 set Delivery: 60 days
#27

Main Shaft M 98 TUG 045 14

Main Shaft M 98 TUG 045 14

1 nos Delivery: 60 days
#28

Main Gear T80 M 98 TUG 045 15

Main Gear T80 M 98 TUG 045 15

1 nos Delivery: 60 days
#29

Input Pinion Shaft T 14 M 98 TUG 045 16

Input Pinion Shaft T 14 M 98 TUG 045 16

1 nos Delivery: 60 days
#30

Band Brake with lining 2 Nos in 1set M 98 TUG 045 19

Band Brake with lining 2 Nos in 1set M 98 TUG 045 19

2 set Delivery: 60 days
#31

Oil Seal set 4 nos M 98 TUG 045 20

Oil Seal set 4 nos M 98 TUG 045 20

6 set Delivery: 60 days
Advertisement

Categories 23

Corrigendum Updates

1 Update
#1

Update

03-Oct-2026

Extended Deadline

10-Oct-2026, 1:30 pm

Opening Date

11-Oct-2026, 1:30 pm

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply contracts

4

Financial statements (as required by tender terms)

5

EMD submission proof (online transfer receipt or DD as allowed)

6

Technical bid documents and conformity certificates

7

OEM authorization letters (if bidding via authorized distributor)

8

Manufacturer authorization/enterprise details for OEM alignment

9

Any other certificates requested in ATC or Corrigendum

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for SECL gear and shaft components tender in Koriya?

Bidders must register with GeM, submit a GOODS-only bid, provide EMD ₹780 via online RTGS/IMPS to SECL Baikunthpur, attach OEM authorization if applicable, and upload all required certificates. The scope covers 31 items with an estimated value of ₹5,251,772; delivery terms follow the option clause with up to 25% quantity variation.

What documents are required for SECL Baikunthpur procurement bid 2026?

Essential documents include GST registration, PAN, experience certificates for similar supply, financial statements, EMD proof, technical bid documents, OEM authorization if applicable, and any ATC/Corrigendum certificates. Ensure consignee GSTIN on invoice and online EMD payment proof.

What are the delivery terms for SECL Koriya main gear components?

Delivery terms are tied to the original delivery order with a 25% quantity option. The additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extensions possible up to the original delivery period. Delivery commences after the last date of the original order.

What is the estimated contract value for this SECL procurement?

The tender targets an estimated contract value of ₹5,251,772 for the supply of 31 line items across gear and shaft assemblies in KORIYA, CHHATTISGARH. EMD required is ₹780; payment terms follow GeM and SECL norms with GST handling by bidder.

What payment terms apply to SECL Baikunthpur gear bid?

Payment is made post-delivery with invoice in consignee GSTIN. EMD/PBG options exist, including DD payable to SECL Baikunthpur. The GST treatment aligns with bidder responsibility; reimbursement is as per actuals or quoted GST rates, subject to tender terms.

Which OEM authorizations are required for this procurement?

If bidding via authorized distributors, provide OEM authorization with sender details (name, designation, address, email, phone). This ensures eligibility under supplier terms and adherence to the GeM GTC framework for the 31 item catalog.

What is the scope of supply for this SECL tender in 2026?

Scope is strictly GOODS supply; no service components. The package covers 31 items, including shafts, gears, seals, pins, and brake assemblies, intended for gear train refurbishment or replacement within SECL assets in Koriya.

What are the key eligibility criteria for SECL procurement 2026?

Eligibility requires GST and PAN, proven experience in supplying similar mechanical gear components, and OEM authorization if using distributors. Bidders must satisfy online EMD submission, upload required technical certificates, and comply with delivery and invoicing requirements in the tender.