Wash Point-pump water working pressure 45kg per cm2,Hydraulic Ram,Tyre Removing Machine,Tyre Inflat
Indian Navy
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
11-Nov-2025, 7:02 pm
Bid End Date
27-Nov-2025, 4:00 pm
Location
Progress
RAQuantity
39
Category
Supply Installation of 10 Head Hydrote
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd invites bids for the supply and installation of multiple testing and support tools in Gonda, Uttar Pradesh. The scope includes a 10-head Hydrote, 10-head Pneumatic Testing Bench, valve screwing/unscrewing machines, air compressor for pneumatic testing, vacuum cleaning for internal cleaning, hydraulic punching for LPG cylinders, and assorted vapour extraction ducting and fittings. The proposal covers 13 items with unspecified quantities and an undefined estimated value; bidders must prepare for a broad equipment mix and potential integration tasks. A notable clause allows a ±25% quantity variation at contract award and during the contract period, with delivery timelines tied to last delivery order date and a calculation formula. This tender emphasizes hardware availability, integration capabilities, and flexible delivery as part of HPCL's equipment modernization in the location.
Product names and categories derived from tender title
13-item scope with broad equipment mix (quantities not specified)
Estimated value and EMD amount not provided in current data
Indicative service scope: supply, installation, on-site commissioning
No explicit standard numbers (e.g., IS/ISO) available in data
Quantity variation up to 25% with contractual adjustments
Delivery period recalculation based on added quantity and original period
All terms and conditions subject to ATC/BOQ amendments
Payment terms not specified in data; verify in ATC/BOQ
Delivery period linked to final delivery order; extended period formula applies
No LD details available in current data; confirm in ATC
Demonstrated experience in supplying/installing industrial equipment
Ability to manage multi-item procurement with integration into HPCL facilities
Compliance with local regulatory and GST requirements
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Navy
VISAKHAPATNAM, ANDHRA PRADESH
Directorate Of Purchase And Stores
MUMBAI, MAHARASHTRA
Hindustan Petroleum Corporation Ltd
Ajmer, RAJASTHAN
Hindustan Petroleum Corporation Ltd
MATHURA, UTTAR PRADESH
Indian Army
Sri Ganganagar, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Supply Installation of 10 Head Hydrote | Supply Installation of 10 Head Hydrote | 1 | each | con945.hpcl.up | 42 |
| 2 | Pneumatic Testing Bench 10 Head | Pneumatic Testing Bench 10 Head | 1 | each | con945.hpcl.up | 42 |
| 3 | Valve Screwing Unscrweing Machine | Valve Screwing Unscrweing Machine | 1 | each | con945.hpcl.up | 42 |
| 4 | Air Compressor for Pneumatic Testing P | Air Compressor for Pneumatic Testing P | 1 | each | con945.hpcl.up | 42 |
| 5 | Vacuum Cleaning Machine for Internal Cle | Vacuum Cleaning Machine for Internal Cle | 1 | each | con945.hpcl.up | 42 |
| 6 | Hydraulic Punching Machine for LPG Cylin | Hydraulic Punching Machine for LPG Cylin | 1 | each | con945.hpcl.up | 42 |
| 7 | Supporting Testing Tools for DPT Facilit | Supporting Testing Tools for DPT Facilit | 1 | ls | con945.hpcl.up | 42 |
| 8 | 5 Head degassing machine Manual Type Til | 5 Head degassing machine Manual Type Til | 1 | each | con945.hpcl.up | 42 |
| 9 | Shaft Mount Gearbox with IEC Motor Adapt | Shaft Mount Gearbox with IEC Motor Adapt | 1 | each | con945.hpcl.up | 42 |
| 10 | 8 inch Vapour Extraction Duct Pipe | 8 inch Vapour Extraction Duct Pipe | 25 | meter | con945.hpcl.up | 42 |
| 11 | 8 inch Bend for Vapour Extraction Ducting | 8 inch Bend for Vapour Extraction Ducting | 3 | each | con945.hpcl.up | 42 |
| 12 | Y Section Reducer for Vapour Extracti | Y Section Reducer for Vapour Extracti | 1 | each | con945.hpcl.up | 42 |
| 13 | Vapour Suction Hood suitable for 8 inch VES | Vapour Suction Hood suitable for 8 inch VES | 1 | each | con945.hpcl.up | 42 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent account number (PAN) card
Experience certificates demonstrating relevant procurement/installation experience
Financial statements or turnover evidence
Bid security/EMD documentation (if specified in ATC)
Technical bid documents and compliance certificates (as per ATC)
OEM authorizations or manufacturer declarations (if required)
Extended Deadline
27-Nov-2025, 4:00 pm
Opening Date
27-Nov-2025, 4:30 pm
Extended Deadline
26-Nov-2025, 3:00 pm
Opening Date
26-Nov-2025, 3:30 pm
Start
16-Dec-2025, 12:00 pm
End
17-Dec-2025, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC documents for the exact scope and submit a technical bid with equipment qualifications, OEM authorizations, GST, PAN, and financials. Ensure acceptance of the ±25% quantity variation and the delivery-time recalculation formula. Include installation and commissioning capabilities and relevant experience certificates.
Submit GST registration, PAN, company financial statements, experience certificates for similar projects, EMD (if required), technical bid with compliance sheets, and OEM authorization letters. Ensure all documents align with ATC/BOM requirements and the 25% variation clause is acknowledged in the proposal.
The tender lists equipment like 10-head Hydrote, 10-head Pneumatic Testing Bench, valve screwing/unscrewing machines, LPG cylinder hydraulic punching, and vapour extraction ducting components. No ISO/IS standards specified in current data; verify in ATC for exact performance specs, dimensions, and compatibility requirements.
Delivery timelines depend on the last date of the original delivery order and subsequent options. The formula requires calculating additional time as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Confirm final dates in the award/PO issued after bid evaluation.
EMD details are not disclosed in the current tender data. Bidders should refer to the ATC or official tender portal submission guidelines to determine the exact EMD amount, payment mechanism (online/DD), and validity period before bid submission.
Prepare for on-site installation and commissioning with skilled technicians. Confirm OEM support, spare parts availability, and integration with existing HPCL systems. Acknowledge the ±25% quantity variation clause and prepare a flexible delivery plan aligning with the extended period calculation.
The scope includes 8 inch vapour extraction duct pipe, 8 inch bends, Y-section reducers, and vapour suction hood suitable for 8 inch VES. Confirm material specs, pressure ratings, and compatibility with HPCL ventilation systems during the technical bid submission.
OEM authorizations are typically required for branded items or manufacturer-specific equipment. If indicated in ATC, provide manufacturer authorization letters, product conformity documents, and warranty terms. Ensure the vendor’s capability to service and supply genuine spares for the installed equipment.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS