TenderDekho Logo
GEM

Procurement Opportunity: 20 Inch FLANGE WN LB 150,12 Inch FLANGE WN LB 150,16 Inch FLANGE WN LB 150,24 Inch FLANGE WN LB 150 in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

30-Sep-2025, 12:51 pm

Bid End Date

18-Oct-2025, 3:00 pm

Latest Corrigendum Available

Progress

RA
Issue30-Sep-2025, 12:51 pm
Reverse Auction16-Nov-2025, 4:00 pm
Award18-Dec-2025, 3:27 am
Explore all 4 tabs to view complete tender details

Quantity

1361

Category

20 Inch FLANGE WN LB 150

Bid Type

Two Packet Bid

Categories 3

Hindustan Petroleum Corporation Ltd has released a public tender for 20 Inch FLANGE WN LB 150, 12 Inch FLANGE WN LB 150, 16 Inch FLANGE WN LB 150, 24 Inch FLANGE WN LB 150, 4 Inch FLANGE WN LB 150, 0. 75 Inch FLANGE WN LB 150, 6 Inch FLANGE WN LB 150, 3 Inch FLANGE SO LB 150, 2 Inch FLANGE WN LB 150, 0. 75 Inch FLANGE SW LB 150, 2 Inch FLANGE SO LB 150, 1. 5 Inch FLANGE WN LB 150, 1 Inch FLANGE WN LB 150, 0. 5 Inch FLANGE SW LB 150, 1 Inch FLANGE SW LB 150, 0. 5 Inch FLANGE WN LB 150, 18 Inch FLANGE WN LB 150, 10 Inch FLANGE WN LB 150, 8 Inch FLANGE WN LB 150, 14 Inch FLANGE WN LB 150, 0. 75 Inch FLANGE SW IBR LB, 6 Inch FLANGE WN IBR LB 300, 2 Inch FLANGE WN IBR LB 300, 2 Inch FLANGE WN IBR LB 150, 0. 75 Inch Flange WN IBR LB, 0. 5 Inch FLANGE SW IBR LB 3, 3 Inch FLANGE WN IBR LB 300, 1 Inch FLANGE SW IBR LB 300, 0. 75 Inch FLNG LB 150 GAL, 1 Inch FLNG LB 150 GALV, 2 Inch FLNG LB 150 GALV, 24 Inch BLIND, 20 Inch SPACER and BLIND, 20 Inch BLIND, 16 Inch BLIND, 12 Inch BLIND, 12 Inch SPACER and BLIND, 10 Inch BLIND, 6 Inch SPECTACLE BLIND, IBR, 6 Inch BLIND, IBR, 3 Inch BLIND, 3 Inch SPECTACLE BLIND, 3 Inch BLIND, IBR, 2 Inch BLIND, 2 Inch BLIND, IBR, 2 Inch BLIND GALV, 2 Inch SPECTACLE BLIND, 2 Inch SPECTACLE BLIND GALV, 2 Inch SPECTACLE BLIND, IBR, 1. 5 Inch BLIND, 0. 75 Inch BLIND, 0. 75 Inch BLIND, IBR, 0. 75 Inch BLIND GALV, 0. 5 Inch BLIND, 0. 5 Inch BLIND, IBR in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 1361. Submission Deadline: 18-10-2025 15: 00: 00. Download documents and apply online.

Documents 6

GeM-Bidding-8418779.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

N/A SAE Flange and Butt Weld Fittings Tender Narsinghpur Madhya Pradesh 2025

N/a

Narsinghpur, MADHYA PRADESH

Posted: 24 November 2025
Closed: 5 December 2025
GEM

M.S Flange, Size-2 Inch,M.S Flange, Size-4 Inch,M.S Flange, Size-6 Inch,M.S Flange, Size-8 Inch,M.S

Mahanadi Coalfields Limited

JHARSUGUDA, ODISHA

Posted: 24 January 2025
Closed: 14 February 2025
GEM

Elbow 90 ASTM A234 WPB BW 3/2 D 8 INCH STD,ELBOW 90 SCRF IS 1239ii GALV 2 INCH,RECUCER CONC ASTM 23

Mangalore Refinery & Petrochemicals Limited

DAKSHINA KANNADA, KARNATAKA

Posted: 29 August 2025
Closed: 15 September 2025
GEM

Elbow 45 Degree 1,Elbow Seamless Butt weld Long radius,Concentric reducer Butt weld Dia1 12,Equal t

Hindustan Petroleum Corporation Ltd

Posted: 25 November 2024
Closed: 5 December 2024
GEM

PSV 4 inch x 6 inch 600 X 150 flange rating OP 47 kg cm2,PSV 1 inch x 2 inch 300 X 150 flange ratin

Gail India Limited

GUNA, MADHYA PRADESH

Posted: 5 June 2025
Closed: 11 July 2025
GEM

Bill of Quantities (BOQ) 58 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 20 Inch FLANGE WN LB 150 As per Specification Document 56 each con833.hpcl.ap 84
2 12 Inch FLANGE WN LB 150 As per Specification Document 86 each con833.hpcl.ap 84
3 16 Inch FLANGE WN LB 150 As per Specification Document 53 each con833.hpcl.ap 84
4 24 Inch FLANGE WN LB 150 As per Specification Document 8 each con833.hpcl.ap 84
5 4 Inch FLANGE WN LB 150 As per Specification Document 52 each con833.hpcl.ap 84
6 0.75 Inch FLANGE WN LB 150 As per Specification Document 187 each con833.hpcl.ap 84
7 6 Inch FLANGE WN LB 150 As per Specification Document 22 each con833.hpcl.ap 84
8 3 Inch FLANGE SO LB 150 As per Specification Document 18 each con833.hpcl.ap 84
9 2 Inch FLANGE WN LB 150 As per Specification Document 29 each con833.hpcl.ap 84
10 0.75 Inch FLANGE SW LB 150 As per Specification Document 37 each con833.hpcl.ap 84
11 2 Inch FLANGE SO LB 150 As per Specification Document 23 each con833.hpcl.ap 84
12 1.5 Inch FLANGE WN LB 150 As per Specification Document 10 each con833.hpcl.ap 84
13 1 Inch FLANGE WN LB 150 As per Specification Document 8 each con833.hpcl.ap 84
14 0.5 Inch FLANGE SW LB 150 As per Specification Document 16 each con833.hpcl.ap 84
15 1 Inch FLANGE SW LB 150 As per Specification Document 8 each con833.hpcl.ap 84
16 0.5 Inch FLANGE WN LB 150 As per Specification Document 8 each con833.hpcl.ap 84
17 18 Inch FLANGE WN LB 150 As per Specification Document 4 each con833.hpcl.ap 84
18 10 Inch FLANGE WN LB 150 As per Specification Document 16 each con833.hpcl.ap 84
19 8 Inch FLANGE WN LB 150 As per Specification Document 10 each con833.hpcl.ap 84
20 14 Inch FLANGE WN LB 150 As per Specification Document 2 each con833.hpcl.ap 84
21 0.75 Inch FLANGE SW IBR LB As per Specification Document 118 each con833.hpcl.ap 84
22 6 Inch FLANGE WN IBR LB 300 As per Specification Document 9 each con833.hpcl.ap 84
23 2 Inch FLANGE WN IBR LB 300 As per Specification Document 41 each con833.hpcl.ap 84
24 2 Inch FLANGE WN IBR LB 150 As per Specification Document 16 each con833.hpcl.ap 84
25 0.75 Inch Flange WN IBR LB As per Specification Document 33 each con833.hpcl.ap 84
26 0.5 Inch FLANGE SW IBR LB 3 As per Specification Document 10 each con833.hpcl.ap 84
27 3 Inch FLANGE WN IBR LB 300 As per Specification Document 2 each con833.hpcl.ap 84
28 1 Inch FLANGE SW IBR LB 300 As per Specification Document 4 each con833.hpcl.ap 84
29 0.75 Inch FLNG LB 150 GAL As per Specification Document 1 each con833.hpcl.ap 84
30 1 Inch FLNG LB 150 GALV As per Specification Document 1 each con833.hpcl.ap 84
31 2 Inch FLNG LB 150 GALV As per Specification Document 10 each con833.hpcl.ap 84
32 24 Inch BLIND As per Specification Document 4 each con833.hpcl.ap 84
33 20 Inch SPACER and BLIND As per Specification Document 8 each con833.hpcl.ap 84
34 20 Inch BLIND As per Specification Document 4 each con833.hpcl.ap 84
35 16 Inch BLIND As per Specification Document 6 each con833.hpcl.ap 84
36 12 Inch BLIND As per Specification Document 11 each con833.hpcl.ap 84
37 12 Inch SPACER and BLIND As per Specification Document 8 each con833.hpcl.ap 84
38 10 Inch BLIND As per Specification Document 4 each con833.hpcl.ap 84
39 6 Inch SPECTACLE BLIND, IBR As per Specification Document 1 each con833.hpcl.ap 84
40 6 Inch BLIND, IBR As per Specification Document 1 each con833.hpcl.ap 84
41 3 Inch BLIND As per Specification Document 2 each con833.hpcl.ap 84
42 3 Inch SPECTACLE BLIND As per Specification Document 2 each con833.hpcl.ap 84
43 3 Inch BLIND, IBR As per Specification Document 1 each con833.hpcl.ap 84
44 2 Inch BLIND As per Specification Document 4 each con833.hpcl.ap 84
45 2 Inch BLIND, IBR As per Specification Document 3 each con833.hpcl.ap 84
46 2 Inch BLIND GALV As per Specification Document 2 each con833.hpcl.ap 84
47 2 Inch SPECTACLE BLIND As per Specification Document 2 each con833.hpcl.ap 84
48 2 Inch SPECTACLE BLIND GALV As per Specification Document 1 each con833.hpcl.ap 84
49 2 Inch SPECTACLE BLIND, IBR As per Specification Document 1 each con833.hpcl.ap 84
50 2 Inch BLIND, IBR As per Specification Document 1 each con833.hpcl.ap 84
51 1.5 Inch BLIND As per Specification Document 8 each con833.hpcl.ap 84
52 0.75 Inch BLIND As per Specification Document 187 each con833.hpcl.ap 84
53 0.75 Inch BLIND, IBR As per Specification Document 118 each con833.hpcl.ap 84
54 0.75 Inch BLIND As per Specification Document 37 each con833.hpcl.ap 84
55 0.75 Inch BLIND, IBR As per Specification Document 33 each con833.hpcl.ap 84
56 0.75 Inch BLIND GALV As per Specification Document 1 each con833.hpcl.ap 84
57 0.5 Inch BLIND As per Specification Document 8 each con833.hpcl.ap 84
58 0.5 Inch BLIND, IBR As per Specification Document 5 each con833.hpcl.ap 84

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

15-Oct-2025

Extended Deadline

18-Oct-2025, 3:00 pm

Opening Date

18-Oct-2025, 3:30 pm

Reverse Auction Schedule

Completed

Start

16-Nov-2025, 4:00 pm

End

19-Nov-2025, 4:00 pm

Duration: 72 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1**********   Under PMA-14-10-2025 12:52:56Evaluated
2**********   Under PMA-04-10-2025 19:15:03Evaluated
3**********   Under PMA-15-10-2025 11:46:29Evaluated
4**********   Under PMA-17-10-2025 17:59:37Evaluated
5**********   Under PMA-13-10-2025 15:00:54Evaluated
6**********   Under PMA-06-10-2025 15:22:15Evaluated
7**********   Under PMA-15-10-2025 12:15:33Evaluated
8**********   Under PMA-08-10-2025 12:35:39Evaluated
9**********   Under PMA-15-10-2025 02:15:33Evaluated
10**********   Under PMA-09-10-2025 14:57:32Evaluated
11**********   Under PMA-15-10-2025 14:51:59Evaluated
12**********   Under PMA-10-10-2025 23:14:32Evaluated
13**********   Under PMA-15-10-2025 11:09:19Evaluated
14**********   Under PMA-14-10-2025 13:14:30Evaluated
15**********   Under PMA-13-10-2025 14:51:19Evaluated
16**********   Under PMA-15-10-2025 13:57:08Evaluated
17**********   Under PMA-14-10-2025 20:45:40Evaluated
18**********   Under PMA-15-10-2025 12:01:14Evaluated
19**********   Under PMA-14-10-2025 16:49:09Evaluated
20**********   Under PMA-10-10-2025 17:53:53Evaluated
21**********   Under PMA-15-10-2025 10:44:17Evaluated
22**********   Under PMA-13-10-2025 12:04:19Evaluated
23**********   Under PMA-15-10-2025 14:29:06Evaluated
24**********   Under PMA-15-10-2025 12:19:01Evaluated
25**********   Under PMA-11-10-2025 17:13:20Evaluated
26**********   Under PMA-18-10-2025 13:16:50Evaluated
27**********   Under PMA-11-10-2025 16:59:23Evaluated
28**********   Under PMA-11-10-2025 12:08:20Evaluated
29**********   Under PMA-14-10-2025 15:11:37Evaluated
30**********   Under PMA-14-10-2025 11:31:42Evaluated
31**********   Under PMA-15-10-2025 13:51:13Evaluated

Contract / Result Documents 14

Please sign in or create an account to view contract details and download result documents.